ML20135B678

From kanterella
Jump to navigation Jump to search
Forwards Predecisional Enforcement Conference Summary Repts 50-295/96-11 & 50-304/96-11 on 961112.Response Not Required Until Licensee Notified of Proposed Enforcement Action
ML20135B678
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 11/27/1996
From: Grant G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Mueller J
COMMONWEALTH EDISON CO.
Shared Package
ML20135B679 List:
References
EA-96-355, NUDOCS 9612050095
Download: ML20135B678 (2)


See also: IR 05000295/1996011

Text

l r U

November 27, 1996

i

l

' EA 96 355

Mr. J. H. Mueller i

Site Vice President

'

Zion Generating Station

Commonwealth Edison Company j

101 Shiloh Boulevard j

Zion, IL 60099

!

SUBJECT: NRC PREDECISIONAL ENFORCEMENT CONFERENCE REPORT

]

Dear Mr. Mueller:

i

This refers to a Predecisional Enforcement Conference conducted by Mr. A. B. Beach, i

Regional Administrator, and other members of the Region ill and Headquarters staff on ,

November 12,1996. The subject of this conference was the apparent violations at Zion l

Station identified in NRC Inspection Reports No. 50-295/96011: 50-304/96011 and i

involving: (1) an ineffective 10 CFR 50.59 Safety Evaluation process: (2) inadequate

- modification closecut and post-modification testing: (3) failure to follow procedures and l

inadequate procedures which contributed to lack of control of Technical Specification l

'

Interpretations: (4) inadequate identification and resolution of recurring equipment

deficiencies; and (5) weak oversight of engineering activities. We have enclosed a report 4

summarizing the discussion.  :

i

You will be notified by separate correspondence of our decision regarding the Enforcement l

Action based on the information presented and discussed at the Predecisional Enforcement .

Conference. No response is required until you are notified of the proposed Enforcenient  !

Action.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter

and enclosed inspection report will be placed in the NRC Public Document Room. a

I

l

d

~

9612050095 961127

gDR ADOCK 05000295

PDR

h e (E-O(

f V

J. H. Mu llar -2-

We will gladly discuss any questions you have concerning this Predecisional Enforcement

Conference.

Sincerely,

Original signed by Geoffrey E. Grant

Geoffrey E. Grant, Director

Division of Reactor Safety

Docket Nos. 50-295;50-304

Enclosure: Predecisional Enforcement

Conference Report

cc w/ encl: D. A. Sager, Vice President,

Generation Support

H. W. Keiser, Chief Nuclear

Operating Officer l

G. K. Schwartz, Station Manager i

W. Stone, Regulatory Assurance

Supervisor

I. Johnson, Acting Nuclear

Regulatory Services Manager

Document Control Desk - Licensing

Richard Hubbard

Nathan Schloss, Economist,

Office of the Attorney General

Mayor, City of Zion

State Liaison Officer, Wisconsin

State Liaison Officer

Chairman, Illinois Commerce Commission l

T. J. flaiman, Senior Vice President

Nuclear Operations Division

Distribution:

Docket File w/ encl SRis, Zion, Braidwood, Enf. Coordinator, Rlll w/enct

PUBLIC IE-01 w/enct Byron w/enct RAC1 w/enci (E-mail)

OC/LFDCB w/enci G. E. Grant, Rlil w/enci CAA1 w/enct (E-mail)

DRP w/enci LPM, NRR w/enci W. L. Axelson, Rlli w/ encl

Rlll PRR w/ encl DRS w/ encl A. B. Beach, Rlll w/enci

DOCUMENT NAME: G:\DRS\ZIO96011.ENF

To receive a copy of this document, Indicate in the bos 'C' = Copy without attachment / enclosure *E" = Copy with attachment / enclosure

"N* es No copy

OFFICE Rill p Rlli f_ Rlil , 5 Qlli , Alll

NAME a M' B rso HClayton/GGrant

JFalevits:nhgMRing@M

UGuzmang MDapa C)k

DATE 11/g/96 57 11h2/96 11/6 96 J(/ /96\ 11/fyM/

OFFICIAL RECORD COPY

-_