ML17244A521

From kanterella
Revision as of 15:03, 29 June 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Monthly Operating Rept for Apr 1979
ML17244A521
Person / Time
Site: Ginna Constellation icon.png
Issue date: 05/08/1979
From: DEPEW L
ROCHESTER GAS & ELECTRIC CORP.
To:
Shared Package
ML17244A520 List:
References
MOR-790430, NUDOCS 7905220227
Download: ML17244A521 (10)


Text

OPERATING DATAREPORTDOCKETNO.50244DATE~ay8,1979COMPLETED BYLEWISDEP~OPERATING STATUS11.UnitName:GINNASTATIONU2.Reporting Period:3.LicensedThermalPower(MWt):4.Nameplate Rating(GrossMWe):5.DesignElectrical Rating(NetMWe):6.MaximumDependable Capacity(GrossMWe):7.MaximumDependable Capacity(NetMWe):490470TELEPHONE 1-716-546-27pp Ext.291-205,atGinnaLowPowerPhysicsTestingafterrefueling-werecompleted andUnitplacedonline4-3-79forpowerphysicstestingandcontinued operation.

8.IfChangesOccurinCapacityRatings(ItemsNumber3Through7)SinceLastReport,GiveReasons:9.PowerLeveltoWhichRestricted, IfAny(NetMWe):10.ReasonsForRestrictions, IfAny:ThisMonthYr.-to-Date Cumulative 11.HoursInReporting Period12.NumberofHoursReactorWasCritical13.ReactorReserveShutdownHours14.HoursGcncrator On-Line15.UnitReserveShutdownHours16.GrossThermalEnergyGenerated (MWH)17.GrossElectrical EnergyGenerated (MWH)18.NetElectrical EnergyGenerated (MWH)19.UnitServiceFactor20.UnitAvailability Factor21.UnitCapacityFactor(UsingMDCNet)22.UnitCapacityFactor(Using,DER Nct)23.UnitForcedOutageRate24.Shutdowns Scheduled OverNext6Months(Type,719696.0922.91656.52,8791,682.1722.911617.25856,560287,845272,66491.3%91.3%80.69%80.69%0%226341676083672223056.17%56.17%53.37%53.37%0/NoneDateandDurationofEach):83,033.45 62,884.59 1569.42*61195.888.5*81193330263340762492326874.06%74.07%66.765%66.765%10%25.IfShutDownAtEndOfRcport.Period, Estimated DateofStartup:26.UnitsInTestStatus(PriortoCommercial Operation):

~INITIALCRITICALITY 7INITIALELECTRICITY COMMERCIAL OPERATION

  • Cumulative DataCommencing-January1,1975ForecastAchieved49dd(RLVaI/76)7V905aaOZ<7 0'l()2)+P>>L AVERAGEDAILYUNITPOWERUNIThIONTHPDAYAVERAGEDAILYPOWERLEVEL(hIWe-Net) 19DAY,AVERAGEDAILYPOWERLEVEL(MWe-Net)4511718450450DOCKETNO..50244UNITN1@irmaStatioDATEMa81979COMPLETED BYLEWISDEPEWTELEPHONE 1-716-546-2700 Ext.291-205,atGonna10121314151694242339352430445450442450450450450451202122232425262128293031449450451450450450450452452451452INSTRUCTIONS Onthisformat,listtheaveragedailyunitpowerlevelinMWe-Netforeachdayinthereporting month..Computetothenearestwholemegawatt.

4087(RCV,1/78)

Ef~ri 4DOCKETNO.NlGinnaStationUNITSHUTDOWNANDPOWERREDUCTIONS COMPLETED BYLEWISDEPEWREPORThlONTHTELEPHONE

---0Ext.291-205,atGinnaNo.Date0I-0IooXn~CVc0oetYes-0cu0ou7c0nLicenseeEventReport5Ew-0eIA0u7cOu7cQu0(JCause8Corrective ActiontoPreventRecurrence 790210790409S62.5=512A-BHH,VALVEXLowpower,physicstestingwascompleted afterrefueling, unitplacedonthelineon4-3-'79forcontinued physicstestingandpoweroperation.

Annualoverhaulof"A"Condensate Pumpstillinprogress, "B"Conden-sate'PumpDischarge.

Valvepositionlimited'condensate pressureandfeedwater flow.7904115.5AEBRELAYXHaintransformer coolingfanrelayfailure.,

F:ForcedS:Scheduled 49.89tRKV8/78)Reason:A-Equipment Failure(Explain)

B-hlaintenancc orTestC-Refueling D-Regulatory Restriction E-Operator Training&LicenseExamination F-Administrative G-Operational Error(Explain)

H-Other(Explain) hlethod:1-hlanual 2-hlanual Scram.3-Automatic Scram.4-Other(Explain) 4FxhibitG-Instructions forPreparation ofDataEntrySheetsforLicenseeEventReport(LER)File(NUREG-0161)Exhibit1-SameSource

4NARRATIVE SUMMARYOFOPERATING EXPERIENCE DOCKETNO.0-2UNITGinnaStationUnitb'1DATECOMPLETED BYLEWISDEPMONTHAril1979TELEPHONE 1-716-546-2700 Ext.291-205,atGinnaLowpowerphysicstestingwerecompleted andunitwasplacedonthelineonApril3.Turbinetestsandphysicstestingwerecompleted aspowerwasescalated.

At98%power,thecondensate bypassvalveopened,powerwasreducedto92%.Thelowcondensate pressurewasduetothe"A"condensate pumpstillundergoing annualoverhaulandthedischarge valveofthe"B"condensate pumpwasnotinthefullopenpositionduetoafaultypositionindicator.

On,Apiil11,arelayonthemaintransformer fancoolersfailed,loadreduction wasstartedandterminated whenthefancoolerswerereinstalled.

Operation at92%continued duetocondensate pumpmaintenance.

49I'230/78)

'4s 0GINNASTATIONMAINTENANCE REPORTFORAPRIL,1979DuringApril,normalinspection andminormaintenance wasperformed.

Majorsafetyrelatedmaintenance included:

1.Replacement ofafaultybistableonOverpressure Protection Channel452.2.Replacement ofabadbatchboardonBoricAcidFlowChannel110.3.Replacement ofadamagedvalvediaphragm onthecontainment radiogas/particulate monitorpumpreturntocontainment.

4.RepairtotheflowcontrolvalveFCVllOAforthenormalflowpathfromtheBoricAcidTankstotheReactorCoolantSystem.5.Replacement ofaleaking31/2"longpieceofpipeadjacenttoFCVllOA.Inaddition, thecheckvalvenexttothispieceofpipewasalsoreplacedasapreventive measure.

4~r