ML20086U369

From kanterella
Revision as of 16:18, 25 September 2022 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Suppls Response to NRC Ltr Re Violations Noted in IE Insp Repts 50-438/83-20 & 50-439/83-20.No Actions by Vendor Necessary to Prevent Recurrence of Abrasion of Condensate Pot Piping
ML20086U369
Person / Time
Site: Bellefonte  Tennessee Valley Authority icon.png
Issue date: 12/05/1983
From: Mills L
TENNESSEE VALLEY AUTHORITY
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
NUDOCS 8403070241
Download: ML20086U369 (2)


Text

7 e b

% TENNESSEE VALLEY AUTHORITY CHATTANOOCA. TENNEGGEC 37401 400 Chestnut Street Tower II n 0EC 7 P 2 De bber 5,1983 U.S. Nuclear Regulatory Commission Region II Attn: Mr. James P. O'Reilly, Regional Administrator 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30303

Dear Mr. O'Reilly:

8 BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 - SUPPLEMENTAL RESPONSE TO VIOLATION 50-438/83-20-01, 50-439/83-20 CONDENSATE POTS This letter is our supplemental response to violation 50-438/83-20-01, 50-439/83-20-01. In our October 7,1983 letter we had stated that we were awaiting n response from the vendor detailing their corrective actiors.

This information has been received and we have enclosed our supplemental response to the citation.

If you have any questions concerning this matter, please get in touch with R. H. Shell at FTS 858-2688.

To the best of my knowledge, I declare the statements contained herein are complete and true.

Very truly yours, TENNESSEE VALLEY AUTHORITY ,

L. M. Mills, nager Nuclear Licensing Enclosure cc: Mr. Richard C. DeYoung, Director (Enclosure)

Office of Inspection and Enforcement

, U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Records Center (Enclosure)

Institute of Nuclesr Power Operations 1100 Circle 75 Parkvay, Suite 1500 Atlanta, Georgia 30339 0

~

y G )

1983-TVA 5OTH ANNIVERSARY An Equal Opportunity Employer'

n ,

ENCLOSURE BELLEFONTE NUCLEAR PLANT SUPPLEMENTAL RESPONSE TO SEVERITY LEVEL V VIOLATION -

50-438/83-20-01, 50-439/83-20-01 .

CONDENSATE POTS Supplement

2. Reason for the Violation TVA's metallurgical cnalysis of the piping revealed that the piping exhibited a longitudinal abrasion or die mark with numerous carbon steel particles embedded in the piping along the mark.

There was no direct evidence of the origin of the carbon steel particles but TVA believes the contamination most probably occurred during the drawing process. The vendor (Capitol Steel) was contacted with the results of TVA's investigations and has indicated that they agree with TVA's assessment.

Based on the infrequency of this type of defect, both TVA and the vendor agree that thic is an isolated occurrence.

4. Corrective Action Taken to Avoid Furth3r Violations Based on the isolated nature of this deficiency, no actions by the vendor are necessary to prevent recurrence.
5. Date When Full Compliance Will Be Achieved TVA is now in full compliance.

___ _ l _ ________is