ML20207U073
| ML20207U073 | |
| Person / Time | |
|---|---|
| Site: | Bellefonte |
| Issue date: | 03/06/1987 |
| From: | Zech G NRC OFFICE OF SPECIAL PROJECTS |
| To: | White S TENNESSEE VALLEY AUTHORITY |
| Shared Package | |
| ML20207U074 | List: |
| References | |
| NUDOCS 8703240586 | |
| Download: ML20207U073 (2) | |
See also: IR 05000438/1986009
Text
N wc_1%I
,
.
.
.
MAR 6 61987
Docket Nos. 50-438, 50-439
License Nos. CPPR-122, CPPR-123
Tpnnessee Valley Authority
v4TTN: Mr. S. A. White
Manager of Nuclear Power
6N 38A Lookout Place
1101 Market Street
Chattanooga, TN 37402-2801
Gentlemen:
SUBJECT:
(NRC INSPECTION REPORT NOS. 50-438/86-09 AND 50-439/86-09)
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
J. W. York on December 1,1986 - January 31, 1987.
The inspection included a
review of activities authorized for your Bellefonte facility.
At the conclusion
of the inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
Areas examined during the inspection were safety-related pipe supports and
restraints, instrumentation, electrical, structural steel welding, welding, fire
preventation/ protection, and employee concerns.
These areas are described in
detail in the report. Within these areas, the inspection consisted of selective
examinations of procedures and representative records, interviews with personnel,
and observation of activities in progress.
The inspection findings indicate that certain activities violated NRC require-
ments.
The violation, references to pertinent requirements, and elements to be
included in your response are presented in the enclosed Notice of Violation.
The responses directed by this letter and the enclosures are not subject to the
clearance procedures of the Office of Management and Budget issued under the
Paperwork Reduction Act of 1980, PL 96-511.
Should you have any questions concerning this letter, please contact us.
Sincerely,
ORIGINAL SIGNED BY
KENNETH P. BARR
Gary G. Zech, Assistant Director
Regional Inspections
,
Division of TVA Projects
p
Office of Special Projects
J
b
Enclosures:
(See page 2)
8703240586 870306
ADOCK 05000438
I\\
G
y
_
.-
_.
-.
. --
~
.
-
,
Tennessee Valley Authority
2
MAR e 61WI
Enclosures:
1.
2.
NRC Inspection Report
,cp w/encls:
W. P. Darling, Site Director
Bellefonte Nuclear Plant
. W. Cantrell, Acting Director
, jNuclear Engineering
M. L. Gridley, . Director
uclear Safety and Licensing
. L. Terrill, Site Licensing
Manager
.ycc w/encls:
t
VJ .f Keppler, OSP
LY. Ebneter, OSP
Zwolinski, OSP
Liaw, OSP
'
. R. Connelly, 0IA
K
P. Barr, RII
MCResidentInspector
NRC Document control Desk
State of Alabama
RII
RII
hDT.
hg
AJohnson:cdg
AIgnatonis
03/
/
4 87
03/4/87
,
.