Forwards Two Lists Revising Commitment Completion Dates for Final Deficiency Repts.Encl 1 Lists Items to Be Completed at Least 6 Months Prior to Fuel Load.Encl 2 Lists Items Scheduled to Undergo Peer Review
ML20207Q646
Person / Time
Site: Bellefonte  Tennessee Valley Authority icon.png
Issue date: 01/21/1987
From: Gridley R
TENNESSEE VALLEY AUTHORITY
To: Grace J
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation
References
NUDOCS 8701280449
Download: ML20207Q646 (4)


Text

,

e-W TENNESSEE VALLEY AUTHORITY CHATTANOOGA. TENNESSEE 37401 SN 157B Lookout Place WEN 211987 U.S. Nuclear Regulatory Connaission Attn: Document Control Desk Office of Nuclear Reactor Regulation Washington, D.C. 20555 Attention: Dr. J. Nelson Grace BELLEFONTE NUCLEAR PLANT (BLN) UNITS 1 AND 2 - UPDATE OF 10 CFR 50.55(e)'

REPORT AND OUTSTANDING COMMITMENT COMPLETION SCHEDULES Enclosed are two lists revising connaitment completion dates for 10 CFR 50.55(e) final reports. These revisions are in addition to those submitted in J. W. Hufham's letter to you dated December 17, 1985 on the same subject.

Enclosure 1 lists 10 CFR 50.55(e) items which were conunitted to before completion dates but which were found by a TVA independent (peer) review to require additional work. These items will be completed at least six months before fuel loading.

Enclosure 2 lists 10 CFR 50.55(e) items which are scheduled to undergo peer review. These items have had their peer review schedule delayed because of manpower limitations and the slowdown of work associated with the revision in the fuel loading schedule for BLN unit 1. The peer reviews on these items and any associated additional work will be completed at least six months before

! fuel loading.

A revised final report will be submitted when the scope / resolution of an item changes. Work will still be scheduled internally by specific dates.

As agreed to in our meeting in Atlanta on November 7, 1985, TVA will keep the BLN resident inspector informed of early completion of any of the items in enclosure 1 or 2 to aid NRC in scheduling its work.

If you have any questions on this matter, please get in touch with D. L. Terrill at (205) 574-8820.

Very truly yours,

( TENNESS lE VALLEY AUTHORITY

, N. ,

. L. Gridley, Director t Nuclear Safety and Licensing Enclosures cc: See page 2 (O

bST) '\

8701280449 870121 PDR ADOCK 05000438 L4 p f67 S PDR p An Equal Opportunity Employer

U.S. Nuclear Regulatory Coramission 6AN 21987 cc (Enclosures):

Mr. G. G. Zech, Director TVA Projects U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 Bellefonte Resident Inspector Bellefonte Nuclear Plant P.O. Box 2000 Hollywood, Alabama 35752 Records Center Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, Georgia 30339 f

1

- ENCLOSURE 1 10 CFR 50.55(e) Iteca which failed Peer Review and Have Work Remaining (New Completion Milestone = 6 Months Before Fuel Loading)

NCR NO . CDR NO.

BLN 2318 & 2917 439/83-30 439/83-26 BLN 2383 & 2494 438/83-40 439/83-34 BLN 2551 438/83-63 439/83-57 BLN 2661 438/84-02 439/84-02 BLN BLP 8121 438/81-54 439/81-56 BLN BLP 8224 438/82-61 439/82-54 BLN BLP 8234 438/83-06 439/83-03 BLN NEB 8001 438/80-08-03 439/80-08-03 BLN NEB 8007 438/81-25-02 a 439/81-25-02 BLN QAB 6102 438/81-44 439/81-46 BLN CEB 79-07 438/79-04-01 439/79-04-01

l .

ENCLOSURE 2 10 CFR 50.55(e) Items Requiring Peer Review (Peer Review and Any Additional Rework to be Completed by 6 Months BFL)

NCR NO. CDR NO.

BLN 1390 438/82-16 439/81-23 BLN 1725 438/82-27 439/82-24 BLN 2857 438/84-19 439/84-18 BLN 3102 438/84-35 439/84-32 BLN 3492 438/84-51 439/84-47 BLN 3714 R1 438/85-07 439/85-07 NCR BH001 438/83-55 439/83-48 BLN NEB 8219 438/82-74 439/82-68