Responds to to Zech Informing That Ltrs Recently Received from Two Members of Smud Board of Directors Requesting Adjudicatory Hearing Does Not Reflect Views of Majority of Board.Nrc Responded to Kehoe & Smeloff Re Issue
ML20235L326
Person / Time
Site: Oconee, Arkansas Nuclear, Three Mile Island, Crystal River, Rancho Seco, Bellefonte, 05000000
Issue date: 09/29/1987
From: Stello V
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
To: Wilcox C
SACRAMENTO MUNICIPAL UTILITY DISTRICT
Shared Package
ML20235L329 List:
References
NUDOCS 8710050427
Download: ML20235L326 (8)


Text

~1 a

~*4 { , .

I SEP 2 9198'l Mr-. Clifford Wilcox j President, Board of Directors j i

Sacramer.to Municipal Utility District 1 P. O. Box 15830 Sacramento, CA 95852-1830 t

Dear Mr. Wilcox:

This' is' in. response to 'your letter to Chairman Zech dated August 27, 1987, telling us that the letter we recently received from two members of the SMUD-Board of Directors. requesting an adjudicatory. hearing does not reflect the {,

views of the majority of the SMUD Board.

We' responded to Messrs. Kehoe and Smeloff in identical letters' addressed to each. We pointed out to them that the very issues they raised had been raised by the Union of Concerned Scientists (UCS), and that the NRC staff's forth-coming response to UCS will address those concerns. We are enclosing .a copy L of our letter to Mr. Kehoe for your information.

Sincerely, i

Originni cisned bg Victor St014/ i Victor Stello, Jr.

Executive Director for Operations-

Enclosure:

As stated

  • See previous concurrences:

PD4/LA* PD4/PM* PD4/D* Tech Ed.* , OGC*

PNoonan BSiegel:sr JCalvo AThoma JMcGurren 9/15/87 9/15/87 9/15/87 9/15/87 9/18/87 DR4M - DRSP:D* ADP: AD* [D7/ NRR

.FScf oeder DCrutchfield FMiraglia U5 zek 'TMurley 9/2' 87 9/22/87 9/22/87 y/fg87 9/;/f/87 E

VS ilo 9/ /87 8710050427 DR 870929.*

p ADOCK 05000312 PDR 2

ENCLOSURE-o ,. . .

/  % [

UNITED STATES

/' I'dn NUCLEAR REGULATORY COMMISSION I

j .p WASWNGTON, D. C. 20555 September 16, 1987

_-_ x j

Mr. John Kehoe Director, Ward II Sacramento Municipal Utility District P. O. Box 15830 Sacramento, CA 95852-1830

Dear Mr. Kehoe:

I am responding to your letter dated August 12, 1987, addressed to Chaiman Lando Zech. In that letter you requested that the Nuclear Regulatory Comission (NRC) hold a hearing in the Sacramento area to address the design flaws in each

.of the five specific systems that were identified in the Union of Concerned Scientists' petition, and the ability of the NRC to evaluate and assess the level of danger inherent in the continued operation of Babcock and Wilcox-designed plants. ,

The petition to which you referred was submitted by the Union of Concerned Scientists on February 10, 1987 pursuant to 10 CFR 2.206. The petition was then referred to the NRC Office of Nuclear Reactor Regulation for appropriate action, in accordance with usual Commission practice. The petition requested the Comission to (1) require all utilities operating or building nuclear power to correct reactors designed alleged by B&W to modify (their nuclear generating facilities 2) hold p safety deficiencies; l ciency of these modifications to correct the alleged deficiencies; and (3) _

l revoke the operating license or construction pemit of an utility that does not i meet the proposed requirements that emerge from (1) 2and (y) above. (

I In addition, the petition requested that NRC imediately suspend the operating licenses and construction pemits of any utility operating or building nuclear power reactors designed by B&W. By letter dated March 13, 1987, the Director, Office of Nuclear Reactor Regulation, informed the Union of Concerned Scientists (UCS) that the concerns expressed in the petition did not warrant imediate suspension of the operating licenses and construction pemits in qurstion.

The NRC staff is continuing to review the petition, and a formal decision on the requests stated in the petition is scheduled to be issued in the near I future. The staff's decision will be subject to the Commission's review. l The NRC staff has reviewed your requests and detemined that the issues are the same as those contained in the UCS petition. When the NRC staff's response to the UCS petition is issued, you will be sent a copy.

I trust the NRC staff's response to the UCS petition will adequately address your concerns. q Sincerely, 397; Thomas E. Murley, D to Office of Nuclear Reactor Regulation

[ [

1 i

j l

i i

Mr. Clifford Wilcox l President, Board of Directors l Sacramento Municipal Utility District j P. O. Box 15830 l Sacramento, CA 95852-1830 1 Dear Mr. Wilcox.

This is in response to your letter to Chairman Zech dated August 27, 1987, '

telling us that the letter we recently received from two members of the SMUD Board of Directors requesting an adjudicatory hearing does not reflect the views of the majority of the SMUD Board.

l We have responded to the minority view expressed by Messrs. Kehoe and Smeloff in identicai letters addressed to each. Note that Messrs. Kehoe and Smeloff were told that the very issues they raised had been raised by the UCS. The NRC staff's pending response to UCS will address the concerns voiced by Messrs. Kehoe )

and Smeloff. We enclose a copy of that letter for your information.  !

Sincerely, l

Victor Stello, Jr.

Executive Director for Operations j Enclosure-As stated I i

  • See previous concurrences:

PD4/LA* PD4/PM* PD4/D* Tech Ed.* OGC*

PNoonan BSiegel:sr JCalvo AThomas JMcGurren 9/15/87 9/15/87 9/15/87 9/15/87 9/18/87 DR4A* DRSP:D* ADP:AD* DD/NRR D/NRR l FSchroeder DCrutchfield FMiraglia JSniezek TMurley l 9/22/87 9/22/87 9/22/87 9/ /87 9/ /87 )

i ED0 VSte15.

9/ /87 i

t o,

-N Mr. Clifford Wilcox President, Board of Directors Sacramento Municipal Utility District P.-0. Box 15830 Sacramento, CA- 95852-1830 g

Dear Mr. Wilcox:

This is;in response totyour letter to Chairman Zech dated August 27, 1987,

- telling us that the letter we recently received from two members of the SMUD Board of Directors requesting an adjudicatory hearing does not reflect the views of the majority of the SMUD Board.

I have responded to the minority view expressed by Messrs. Kehoe and Smeloff in identical letters addressed to each. Note.that I told Messrs. Kehoe and i

Smeloff that the very issues they raised had been raised, by the UCS. The NRC staff's pending response to UCS will address the concerns voiced by Messrs..Kehoe and Smeloff. I enclose a copy of that letter for your information.

Sincerely, \ j l

Victor Stello, Jr.

Executive Director f for Operations \ .-

Enclosure:

As stated q

  • See previous concurrences:

PD4/LA* PD4/PM* PD4/D* Tech Ed.* OGC*

PNoonan BSiegel:sr JCalvo AThomas JMcGurr n i 9/15/87 9/15/87 9/15/87 9/15/87 9/18/87 \

DR4A* DRSP:D* ADP:AD*

h J DD/NRR D/NRR

\

3 FSchroeder DCrutchfield FMiraglia JSniezek TMurley 9/22/87 9/22/87 9/22/87 9/ /87 9/ /87 EDO-VStello 9/ /87

9 Mr.'CliffordWijcox l President,' Board of Directors

. Sacramento Municipal Utility District P. O. Box 15830 .j

-Sacramento, CA . 958,52-1830 /

\ .

Dear Mr. Wilcox:

\. /

3 \

/

I have been asked by Chairman lech to.thank you for your letter of August 27, 1987, telling us that the letter we.recently received'from two members of

. the SMUD Board of Directors requesting an adjudicatory hearing does not reflect the. views.of the majority 1of the SMUD Board.

I havefresponded to the min'ority view expressed by Messers. Kehoe and Smeloff

.. in identical letters address'ed to each. Note that I told Messers. Kehoe and Smeloff that the very issues they raised had been raised by the UCS.

The NRC staff's pending response to UCS wi11' address the concerns voiced by Messers. Kehoe and Smeloff .

I enclose a' copy of that letter for your  ;

information.- j, T

\ l

\ 3 Victor Stello, Jr.

Executive Director for.0perations o

Enclosure:

A As stated .\

\

\ j

\ i

\

  • See previous concurrences: \

PD4/LA* PD4/PM* PD4/D* \TechEd.* OGC*

PNoonan 'BSiegel:sr JCalvo TAThomas JMcGurren 9/15/87 9/15/87 9/15/87 9/15/87 9/18/87

\

DR O V Ap I DD/NRR. D/NRR FSchr2eder D chfield FM  ; ilia JSniezek TMurley 9/pt/87 9/zd87 9 /87 9/\ /87 9/ /87 LCO -  ;

VStello '

9/ /87 l

1

Mr. Clifford Wilcox President, Board of Directors '

Sacramento Municipal Utility District P. O. Box 15830 Sacramento, CA 95852-1830

Dear Mr. Wilcox:

I have been asked by Chairman Zech to thank you for your letter of August 27, 1987, telling us that the letter we recently received from two members of s

the SMUD Board of Directors requesting an adjudicatory hearing does not reflect the views of the majority of the SMUD Board.

I am heartened that the majority of the SMUD Boar,d considers that NRC has addressed the concerns of the Union of Concerned scientist (UCS) regarding Babcock & Wilcox nuclear steam supply systems in a well-reasoned manner.

I have responded to the minority view expressed by ssers. Kehoe and Smeloff in identical letters addressed to each. NotethatIgtoldMessers.Kehoe and Smeloff that the very issues they raised had been aised by the UCS.

The NRC staff's pending response to UCS will address t e concerns voiced by Messers. Kehoe and Smeloff. I enclose a copy of tha letter for your information.

Victor Stello, Jr.

Executive Director fo Operations

Enclosure:

As stated

\f.

m

\c

- h *3d N PD4/ lap PD4/PM '{/f PD4/DOEc Tech Ed.. OGC PNoonan BSiegel:sr JCalvo AThomas M JMcGurren 9/r5 /87 9//5/87 9/jf/87 9//5/87 9/ff/87 DR4A DRSP:D ADP: AD DD/NRR D/NRR \

FSchroeder DCrutchfield FMiraglia JSniezek TMurley 9/ /87 9/ /87 9/ /87 9/ /87 9/ /87 ED0 VStello 9/ /87

L .

j DISTRIBUTION Docast fileJfCiEUA13]le, NRC"'PDR~(W7cy of incoming)

Local PDR (w/cy of incoming)

ED0 No. 003154 ED0 Reading T. Murley/J. Sniezek V. Stello F. Miraglia D. Crutchfield F. Schroeder 1 OGC-Bethesda GPA/CA (3)

SECY (3) 87-1059 D. Mossburg, PMAS (w/cy of incoming)

P. Shea (GT# 003154)

B. Siegel (w/cy of incoming)

P. Noonan PD #4 Green Ticket File (w/cy of incoming) i 1

1 i

i i

,  ::t '

1

.- 9  %, -

UNITED STATES

'[7 g .

) -

( g.

y p .-

NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20S$5 -

-9 *. l

y EDO PRINCIPAL CORRESPONDENCE. CONTROL l: FROM DUE: C/Ot g7 EDO CONTROL: 003154
DOC DT: 08/27/87-CLIFFORD WILCOX- FINAL REPLY:

SACRAMENTO MUNICIPAL UTILITY DISTRICT TO:

CHAIRMAN 2ECH FOR SIGNATURE OF ** GREEN ** SECY NO: 1059 h/1C1 DESC: ROUTING:

CONCERNING UCS PETITION RE NUCLEAR POWER PLANTS STELLO

-DESIGNED BY BLW TAYLOR REHM

' DATE: 09/08/87 MURRAY, OGC/B ASSIONED TO: NRR CONTACT: MURLEY

( .SPECIAL INSTRUCTIONS OR REMARKS: ,

l FOR APPROPRIATE ACTION l' REF: ED0-3137

'NRR RECEIVED: SEPTEMBER 9, 1987

ACTION: DRSP:CRUTCHFIELD > CM y

$9r -

NRR ROUTING: MURLEY/SNIEZEK

i. MIRAGLIA l#

-STAROSTECKI FUNCHES hy 3.f 9

BLAHA l MoSSeURG. ~ p l :-

1 o _______

v ,

OFFICE OF THE SECRETARY CORRESPONDENCE CONTROL TICKET PAPER NUMBER: CRC-87-1059 LOGGIlO DATE: Sep 4 87 ACTION OFFICE: EDO a AUTHOR: C. WILCOX AFFILIATION: SMUD (SACRAMENTO MUNICIPAL UTILITY DISTRICT)

LETTER DATE: Aug 27 87 FILE CODE:

SUBJECT:

UCS PETITION CONCERNING B&W NUCLEAR PLANTS ACTION: Appropriate DISTRIBUTION: RF, DOC,0GC SPECIAL HANDLING: None NOTES:

DATE DUE:

SIGNATURE: . DATE SIGNED:

AFFILIATION:

l l

l i

l

" ~ '

Ra*d Off. EDQ Dats 9-N-# 7 Dme l '* .y E DO - - 0031S4