IR 05000438/1986004

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-438/86-04 & 50-439/86-04
ML20205B062
Person / Time
Site: Bellefonte  Tennessee Valley Authority icon.png
Issue date: 08/06/1986
From: Zech G
NRC
To: White S
TENNESSEE VALLEY AUTHORITY
References
NUDOCS 8608110512
Download: ML20205B062 (1)


Text

1

>

.

AUG 6 1986 Tennessee Valley Authority ATTN: Mr. S. A. White Manager of Nuclear Power 6N 38A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801

'

Gentlemen:

SUBJECT:

REPORT NOS. 50-438/86-04 AND 50-439/86-04 Thank you for your response of July 18, 1986, to our Notice of Deviation issued on June 18, 1986, concerning activities conducted at your Bellefonte facility.

We will examine the implementation of your corrective actions during future inspections.

We appreciate your cooperation in this matter.

Sincerely, W\\ A v. M(

y Gary G. Zech, Director TVA Projects cc:

J. P. Darling, Site Director, Bellefonte Nuclear Plant A. M. Qualls, Plant Manager K. W. Whitt, Director, Nuclear Managers Review Group G. McNutt, Project Managers Office A. M. Kamal Nuclear Engineer L. S. Cox, Construction Project Manager bec:

J. N. Grace R. D. Walker H. R. Denton, NRR H. L. Thompson, NRR J. M. Taylor, IE B. B. Hayes, 01 S. R. Connelly, 01A G. G. Zech NRC Resident Inspector Document Control Desk State of Tennessee RII R

RII

'

,

TGib s:bhg TConi n AHerdt b-7/p/86 7/ ( /86

, g4 /86 jfggg Gig

'

IO 8608110512 860806

-

PDR ADOCK 05000438

__

1 -O l G

PDR