ML20236V734

From kanterella
Jump to navigation Jump to search
Partial Response to FOIA Request for Documents.Forwards Documents Listed in App C
ML20236V734
Person / Time
Site: Beaver Valley, Millstone, Monticello, Dresden, Davis Besse, Peach Bottom, Nine Mile Point, Palo Verde, Perry, Kewaunee, Wolf Creek, Hope Creek, Sequoyah, Pilgrim, Susquehanna, Prairie Island, Columbia, Turkey Point, River Bend, Vermont Yankee, Ginna, Waterford, Cook, Maine Yankee, Quad Cities, Rancho Seco, Zion, Bellefonte, FitzPatrick, LaSalle, 05000000, Shoreham, Trojan
Issue date: 12/01/1987
From: Grimsley D
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
To: Sorgi D
MASSACHUSETTS, COMMONWEALTH OF
Shared Package
ML20235V135 List:
References
FOIA-87-644 NUDOCS 8712070036
Download: ML20236V734 (2)


Text

-

V u s. tuct ony couusssi:N ruc Focutouis ww tase s

F0!A-87-644

,7. "'%,g

ass,

,esio~ss rys t k

RESPONSE TO FREEDOM F l "

IY I "'"

I e..e/

INFORMATION ACT (FOIA) REQUEST N

DEC1 W e

DOCKET NUMa(R65 l# assece6 App kEOutSTER Ms. Donna Sorgi 50/293 PART 4.-REC 08tOS RELEASED OR NOT LOCATED (See checAed bones)

No agency records subject to the request have been located No additionel agency records subpect to the request have been located.

Agency records sabpect to the request that are identifed in Appencfra are already available for pubhc inspection and cm

.6+ the NRC Public Document Room, 1717 H Street, N.W., Washington, DC.

Agency records subsect to the request that are identifed in h b*

as bahg made available for public inspecten and copying in the NRC Public Document X

Room,1717 H Street, N.W., Washington, DC, in a folder unour es FOtA wmber end regt. ester name.

The nonproprotary versson of the proposal (s) that you agreed to as: cept in a toiephone conversation with a mornbar of mv staff is now being made avalable for public inspection and coying at the NRC Public Document Room,1717 H Street, % W, Washington, DC. in a fokler under this FOIA nu%er and requester name.

Enclosed is information on how you may obtain access to and the charges for copying records placed in the NRC Pubhc Document Room.1717 H Street, N.W., Washington, DC.

Agency records subpect to the request are enclosed. Any opcdcacne charge for copies of the records proveded and payment procedures are noted in the commenta section.

Records subject to the request have been referred to another Fenerrol agencyfissi for review and detect response to you, in view of NRC's response to this request, no further octon a horig taken on appeal letter dated PART ll.A-INFOftMATION WITHHELD FROM PriLIC DISCLOSURE Certain information in the requested records is being wrthheid frore pubhc desclosure pursuant to the FOIA enemptions desenbod in and for the reasons stated in Part il, ese-tsons B, C, and D. Any ro6 eased portions of the docurnents ior wruch only part of the record is being wrthheld are being made availabe for public inspection and copying in s

the NRC Pubhc Document Room,1717 H Street. N.W., Wasairpon. DC. in a folder under this FOIA number and requester name.

i Ce..anta

  • Copies of Appendix C records are also being placed at the Local Public Document Room maintained in the Plymouth Public Library,11 North Streeto Plymouth' Massachusetts.

I i

l

?

$30 E. DIRECTDA. D VISI DF flVLES AND RECORDS p

u2 v

? (;

i

,..~.....pt B712070036 871201 PDR FOIA SORCIG7-644 PDR.-

4 N C FIRM AS4 iPen ti l

it as)

y 1

l Re: F01A-87-644

{

APPENDIX C RECORDS MAINTAINED IN THE PDR UNDER THE AB0VE REQUEST NUMBER l

1.

1/8/79 Ltr to Howard from Denton w/ enclosures: NUREG 0460, Volume 3,andAppendicesAandB.(9pages) q l

2.

2/21/80 Ltr to Andognini from Denton w/ enclosed Confirmatory Order. (5 pages) 3.

2/19/81 Ltr to Morisi from Ippolito, subject: ATWS RPT/ARI Design.(6pages) 4.

12/2/83 Memo to All Power Reactor Licensees and Applicants for Operating Licenses from Eisenhut subject: NRC Staff Recommendations Regarding Operator Action for Reactor Trip i

and ATWS (Gensric Letter 83-32) (2 pages) 5.

1/5/64 Memo for Butcher from Beard,) subject:

ATWS Recirculation Pump Trip Breakers. (2 pages l

6.

4/27/87 Ltr to Vassallo from Boston Edison Company, re: Generic Letter 83-28:. Section 2.2.2, Vendor Interfacs. (101 pages) l 7.

June 1985 Conformance to Generic Letter 83-28 Items 3.1.3 and 3.2.3 Dresden Unit Nos. 2 and 3. Millstone Unit 1 Monticello, Pilgrim Quad Cities Unit Nos.1 and 2.

(29 pages) 1 8.

7/10/85 Review of Licensee and A l

Letter 83-28. (40 Pages)pplicant Responses to NRC Generic i

9.

9/25/86 Ltr to Carrington from Roberts, re: Transmittal of Revised Draft Report 'Conformance to Generic Letter 83-28 Item 2.1 (part 1) Equinnent Classification Hope Creek, Peach Botton 2 and 3. Perry 1 and 2. Pilgrim 1",

EGG-NTA-7188, September,'1986.(FINSD6001andD6002)

EWR-106-86.(16pages.)

10.

9/85 Report entitled, "Conformance to Generic l'ett'er 83-28

.- Item 2.1:(Part 1) Equipment Classification (RTS Components)

Selected GE Boiling Water Reactor Plants, Hope Creek, Peach Bottom 2 & 3, Perry 1 & 2, Pilgrim 1 (16 pages) 11.

4/3/87 Letter to BWR Owner's Group ATWS Compliance Alternatives Members and All Primary Representatives (6pages) 12.

8/28/87 Letter to H.E. Polk from E. W. Roberts transmitting the i

Technical Evaluation Report, " Reactor Trip System Reliability Conformance to Item 4.5.2 of Generic Letter 83-28, Peach Bottom 2 & 3, Perry 1 & 2, Pilgram 1. Quad Cities 1 & 2. River Bend 1, Shoreham, Susquehanna 1 & 2, Vermont Yankee, WNP-2 (24 pages) l

~

eyd

-THE COMMONWEALTH OF MASSACHUSETTS DEPARTMENT OF THE ATTORNEY GENERAL JOHN W. McCORMACK STATE OFFICE BUILDING ONE ASHBURTON PLACE. BOSTON o21o8-1698,

w JAMES M. SHANNoN '

ATTORNEW GENERAL September-28,-1987

'IREEDOM Of INFORMATION

  • ACT EST:
  1. hD}E Donnie H. Grimsley

/.ggf Director, Division of Rules and Records gH td k'di-/ 7 t

7 Office of Administration United States Nuclear Regulatory Commission 7735 Old Georgetown Road Bethesda, MD 20814

Dear Mr. Grimsley:

This is a request under the Freedom of Information Act (FOIA), as amended 5 U.S.C. 552.

I hereby request all records documenting commitments made I

by Boston Edison Company to the NRC concerning, improvements to the Pilgrim Nuclear Power Station hardware or procedures related to anticipated transients without scram (ATWS),-

including the original commitment, any subsequent: changes to the commitment, and when'and how the. commitment was actually-met.

I reserve the Attorney General's right to appeal the r

withholding or deletion of any_ material..

As authorized in the Nuclear-Regulatory Commission's regulations at 10. C.F.R.

S 9.14a(a)(2), we believe that furnishing these requested documents without charge _to the Massachusetts Department of the Attorney General would be'a governmental courtesy appropriate to this request, particularly given the importance of the documents sought and'our' limited budget.

As you know, the FOIA also authorizes you to reduce or waive fees when release of requested information would benefit "the public interest."

As Attorney. General for.the Commonwealth, we believe'the information requested would clearly be in the public interest, and therefore the-fees for searching and reproduction should be waived.. The documents.

requested are for the Attorney General's' review of the conduct:

of the~ Boston Edison Company during the recent outage of-the Pilgrim Nuclear Power Plant.

The' Attorney General conducts such a review regarding the reasonableness of the company's 1

1 07e e e rm /ww2 I Q ?>~

%(JQlWWVI w

I A

s<

..s.

actions as part of'his representation of Massachusetts consumers before the Massachusetts. Department of Public Utilities.-

Provision of the requested documents with waiver of-fee will both facilitate this review process and reduce the cost of providing this governmental service for Massachusetts citizens.

Based on the above and on our limited budge ~t, I therefore request that you waive any fees.

As provided in 10 C.F.R.

S 9.14b(e), I reserve the Attorney General's right to appeal any denial of fee waiver or reduction.

If you have any questions, please call me at 617-727-1083.

Pursuant to the FOIA, I will expect a reply within 10 working days.

Si

erely, o

'W ~

e

\\

Donn2 Sorgi Chief, Utili es Division 1

Assistant Attorney' General l

Public Protection Bureau

{

(617) 727-1083 j

I i

i l

l l

l i

l l

_ _ - - - _ - _ _ - _ - _.