Forwards Supplemental Response to NRC Re Violations Noted in Insp Repts 50-438/83-05 & 50-439/83-05. Corrective actions:BNP-QCP-6.3 Revised to Clarify Listing of Attributes Inspected on Thermal Expansion Devices
ML20095G108
Person / Time
Site: Bellefonte  Tennessee Valley Authority icon.png
Issue date: 07/13/1984
From: Mills L
TENNESSEE VALLEY AUTHORITY
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20095G082 List:
References
NUDOCS 8408270468
Download: ML20095G108 (3)


Text

.

.p(

~~

TENNESSEE VALLE AUTHORITY  !

l CHATTANOOGA TENNESSEE 374ot 1 400 Chestnut Street Tower II Aiuly h) 1984 U.S. Nuclear Regulatory Commission ' as all 02 Region II fttn: Mr. James P. O'Reilly, Regional Administrator 101 Marietta Street, NW, Suite 2900 Atlanta,' Georgia 30323

Dear Mr. O'Reilly:

BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 - SUPPLEMENTAL RESPONSE TO VIOLATION 50-438/83-05-03, 50-439/83-05 FAILURE TO FOLLOW PROCEDURES AND DRAWINOS FOR INSPECTION OF MECHANICAL EQUIPMENT While conducting a final review of corrective action for this violation, TVA identified certain anomalies. These were discussed with NRC-0IE Inspector P. E. Fredrickson on June 27,'1984, at which time we also indicated that the date of July 1,1984 for completion of corrective actions indicated in our final report would not be met. Enclosed are the details concerning this issue.

If you have any questions concerning this matter, please get in touch with R. H. Shell at FTS 858-2688.

Very truly yours, TENNESSEE VALLEY AUTHORITY DS L k L. M. Mills, Manager

/ Nuclear Licensing Enclosure oc (Enclosure):

Mr. Richard C. DeYoung, Director Office of Inspection and Enforcement

. U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Records Center Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, Georgia 30339 8408270468 840726 PDR ADOCM 05000438

l. @ PDR i,

1983-TVA 5OTH ANNIVERSARY An Equal Opportunity Employer

1 s.

,. f ,,o ENCLOSURE BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2

~ SUPPLEMENTAL RESPONSE TO SEVERITY LEVEL V VIOLATION 50-438/83-05-03, 50-439/83-05-03 FAILURE TO FOLLOW PROCEDURES AND DRAWINGS FOR INSPECTION OF MECHANICAL EQUIPMENT Description of Deficiency The subject violation resulted from inspections performed by the NRC Construction Appraisal Team (CAT), and involved discrepancies identified with certain mechanical equipment which appeared to have been inspected and accepted by mechanical quality control (QC). The initial response to the violation connitted Bellefonte Construction to reinspect all equipment presently accepted under revisions 0 and 1 of Bellefonte Nuclear Plant Quality Control Procedure (BNP-QCP) 6 3, " Mechanical Equipment." Any discrepancies found were to be documented and corrected in accordance with site procedure. Resolution of the subject violation required completion of the reinspections, correcting the discrepancies identified and closure of documentation, including nonconformance report 2346. These actions have been completed.

During a final review of corrective actions for this violation, certain anomalies were identified. A review of the CAT inspection report identified concerns involving the lack of specific requirements or reference to source documents in BNP-QCP-6 3, which would enable the QC inspector to establish proper acceptance criteria and the need for clarification of thermal expansion provisions. A review of QC inspection results has supported the conclusion that essentially all discrepancies were related to either foundation attachment hardware or attributes linked to thermal expansion provisions. Although the violation response committed TVA to a full reinspection, inadequate communication in mechanical QC limited the effort to verification of correct foundation hardware, which was the major problem identified by the CAT inspectors.

Based on this information, certain new corrective actions must be initiated ,

and completed to consider TVA in full compliance with respect to the violation. BNP-QCP-6.3 presently requires two stages of inspection for mechanical equipment, as indicated in the CAT report. " Equipment Installation Inspection" (Test 81), omrces foundation hardware, except when l- the equipment contains thermal expansion devices. Final verification is then provided by, " Prior to Construction Test Equipment Inspection" (Test

! 84). All equipment identified as discrepant by the CAT inspectors contained thermal expansion devices and none had received the test 84 f inspection. The new corrective actions to be taken are:

1. Site mechanical engineering is currently revising BNP-QCP-6.3, to -

l provide clarifications involving the CAT inspector concerns, which includes a listing of attributes to be inspected on thermal expansion devices. ,

l p 4 m

i

  1. - m

F

2. Incretted training will ba pecvided to QC incpectors involving the u a *
  • of Divicicn cf Engineering Design / vendor accIpt:nca critorie. .

"* ~

3 Mechanical oc will then reinspect equipment which.has previously been inspected and accepted under the test 84 inspection. Any additional discrepancies will be documented and corrected in accordance with site procedu re .

These new corrective actions will be completed and full compliance will be achieved by November 30, 1984.

P e

a e