Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20210Q693 | 9 August 1999 | Forwards Updated Changes to Distribution Lists for Browns Ferry & Bellefonte Nuclear Plants | |
ML110830236 | 3 May 1993 | Forwards Rev 1 to NRC Licensing Submittal Review of Licensing Conditions Imposed by NUREG-1216. Submittal Made on Behalf of Eight Utils Having Enterprize EDGs for Emergency Standby Ac Power | |
ML18010A950 | 8 December 1992 | Forwards NRC Licensing Submittal Review of Licensing Conditions Imposed by NUREG-1216. Submittal Made on Behalf of Eight Utils Having Enterprise EDGs for Emergency Standby Ac Power | |
ML18036A870 | 30 September 1992 | Forwards Updated Distribution Lists for Brown Ferry & Bellefonte Nuclear Plants to Reflect Recent Reorganizational Changes.Lists Should Replace Lists Sent on 920515 | |
ML20086K087 | 11 December 1991 | Requests Mod of Periodicity in Which Util Conducts Annual Practice Sessions for Fire Brigade Personnel.Rev to Commitment C.3.D.6(b) of BTP Cmeb 9.5-1 Will Permit Practice Session to Be Held Annually | |
ML20065R689 | 12 December 1990 | Advises That Util Intends to Reopen Simulator Training Facility at Plant Site Near Hollywood,Al.Requests That Existing NPDES Permit AL0024635 Be Modified to Include Simulator Training Facility Outfall | |
ML20247C377 | 6 September 1989 | Confirms Understanding of Applicability of NRC Requirements Developed During Deferral Period of Plant | Backfit |
ML20245D985 | 22 June 1989 | Forwards 21 Insp Rept Executive Summaries,Per NRC Contract NRC-03-87-029,Task Order 037.Individual Quality Evaluations of Insp Repts Also Prepared | High Radiation Area Fire Barrier Nondestructive Examination Continuous fire watch Fire Protection Program |
ML20246E355 | 21 June 1989 | Submits Plan for Quadrex Corp to Lease Plant,Complete Facility,Operate Facility,Sell Power & Eventually Return Plant to Tva.Topic Will Be Discussed at 890711 Meeting | |
ML20248K545 | 5 April 1989 | Responds to 890224 & 0322 Ltrs Re NRC Bulletin 88-011, Pressurizer Surge Line Thermal Stratification. NRC Agrees W/Suggestion for 890407 Meeting to Discuss Util Schedular Proposal | |
ML20247G541 | 24 March 1989 | Informs of Recent Changes Made within Mgt Structure of Util Organization.Util Reorganization Efforts Aimed at Implementing Changes Necessary to Reflect Reorientation from Design & Mod | |
ML20247E494 | 10 March 1989 | Forwards Insp Repts 50-438/89-01 & 50-439/89-01 on 890111.No Violations or Deviations Noted | |
ML20235A125 | 16 December 1987 | Forwards Info Re Resource Technical Svcs,Inc,Including Summary of NRC Contract Work,Nrc Form 26 for Three Existing Contracts,Audit Info,Work History & Lists of Expertise Available for Special Insps & of Current Resource Svcs | |
ML20236V734 | 1 December 1987 | Partial Response to FOIA Request for Documents.Forwards Documents Listed in App C | |
ML20236V280 | 20 November 1987 | Informs That on 871019,Director of NRR Issued Encl Director'S Decision Which Declined to Institute Proceedings Requested by Ucs Petition,In Response to 870731 Request.W/O Encl | |
NUREG-1231, Forwards NUREG-1231, SER Re B&W Owners Group Plant Reassessment Program. NRC Unable to Reach Final Conclusion on Acceptability of Human Factors Portion of Program. Consideration of NRC Recommendations Requested | 6 November 1987 | Forwards NUREG-1231, SER Re B&W Owners Group Plant Reassessment Program. NRC Unable to Reach Final Conclusion on Acceptability of Human Factors Portion of Program. Consideration of NRC Recommendations Requested | Anticipated operational occurrence Probabilistic Risk Assessment Backfit |
ML20235S628 | 1 October 1987 | Responds to Supporting Request from Smud That Commission Hold Hearing in Sacramento,Ca Re Safety of B&W Nuclear Plants.Response to Concerns Will Be Addressed When Response to Ucs Petition Issued | |
ML20235L326 | 29 September 1987 | Responds to to Zech Informing That Ltrs Recently Received from Two Members of Smud Board of Directors Requesting Adjudicatory Hearing Does Not Reflect Views of Majority of Board.Nrc Responded to Kehoe & Smeloff Re Issue | |
ML20235J535 | 28 September 1987 | Responds to Constituent Tf Gross Ltr Supporting Ucs 870210 10CFR2.206 Petition to Suspend OLs & CPs of Any Util Operating or Bldg Nuclear Power Reactors Designed by B&W,Per 870803 Request.Nrc Statements Re Plants Discussed | |
ML20235J117 | 28 September 1987 | Responds to Requesting Info Re Ucs 870210 Petition Requesting Mods to B&W Facilities,Per E Gallizzi to Recipient Requesting Support of Petition. Gallizzi Statements Discussed.Petition Under Review | |
ML20235B626 | 16 September 1987 | Responds to 870812 Request for Hearing to Address Design Flaws in Each of Five Specific Sys Identified in Ucs Petition & Ability of NRC to Evaluate & Assess Level of Danger Inherent in Continued Operation of B&W Plants | |
ML20235B658 | 16 September 1987 | Responds to 870912 Request for Hearing Re Design Flaws in Five Specific Sys Identified in Ucs Petition & NRC Ability to Evaluate & Assess Level of Danger Inherent in Continued Operation of B&W Plants | |
ML20235L377 | 27 August 1987 | Advises That Received from Two Smud Board of Directors Re Request for Adjudicatory Hearing Does Not Reflect Views of Majority of Board of Directors | |
ML20237H009 | 12 August 1987 | Responds to Ucs Et Al 870210 Petition Requesting Public Hearing Re Sufficiency of Mods for Continued Operation of B&W Designed Nuclear Reactors.Util Requests NRC to Hold Hearing in Sacramento,Ca to Discuss Design Flaws & Dangers | |
ML20236L181 | 4 August 1987 | Responds to Addressed to Chairman Zech,Requesting That Commission Keep Recipient Fully Apprised of All Developments Re Both Petition Filed by Ucs & Ongoing Reassessment of B&W Reactors.Review of Petition Continuing | |
ML20235J570 | 3 August 1987 | Requests Response to Encl Constituent Tf Gross Urging Support of Ucs Petition to Suspend OLs & CPs for All B&W Nuclear Plants Pending Resolution of Extraordinary Safety Problems | |
ML20236L243 | 13 July 1987 | Requests That Author Be Fully Apprised of All Developments Re Both Ucs Petition & Ongoing NRC Reassessment of B&W Reactors | |
ML20215D637 | 12 June 1987 | Forwards Reply to Responses from NRC & B&W Owners Group. NRC Response Evidences No Independent Review of B&W Claims. Commission Urged to Take Personal Jurisdiction of Petition to Ensure That Latest Commitment Not Frustrated | |
ML20214E284 | 18 May 1987 | Final Response to FOIA Request.No PRAs on File for McGuire 1,Bellefonte 1 & Gassar.Pras for Susquehanna 1 & Oyster Creek Available in PDR | |
IA-87-221, Final Response to FOIA Request.No PRAs on File for McGuire 1,Bellefonte 1 & Gassar.Pras for Susquehanna 1 & Oyster Creek Available in PDR | 18 May 1987 | Final Response to FOIA Request.No PRAs on File for McGuire 1,Bellefonte 1 & Gassar.Pras for Susquehanna 1 & Oyster Creek Available in PDR | |
ML20214E228 | 16 April 1987 | FOIA Request for PRAs for Listed Plants Be Placed in PDR | |
ML20206P519 | 15 April 1987 | Responds to Severity Level IV Violation Noted in Insp Repts 50-438/86-09 & 50-439/86-09.Corrective Actions:Procurement QA Branch Inspectors Conducted Addl Training in Welding Insp.Future Insp Plans Will Address Welding Requirements | Condition Adverse to Quality |
ML20207U073 | 6 March 1987 | Forwards Insp Repts 50-438/86-09 & 50-439/86-09 on 861201-870131 & Notice of Violation | |
ML20207T456 | 26 February 1987 | Forwards Insp Repts 50-438/86-10 & 50-439/86-10 on 861216-18.No Violation or Deviation Noted | |
ML20211C323 | 12 February 1987 | Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-438/86-07 & 50-439/86-07 | |
ML20211C525 | 6 February 1987 | Discusses NRC Analysis of Licensing Schedules for Facility, Per Util 870202 Request for NRC Statement to State of Ca. NRC Sept 1981 - Feb 1982 Monthly Repts to Congress Re Licensing Projections for Pending OL Applications Encl | |
ML20209D744 | 28 January 1987 | Responds to NRC Re Violations in Noted Insp Repts 50-438/86-07 & 50-439/86-07.Corrective Actions: Requirements for Timely Documenting of Conditions Adverse to Quality Reviewed by Involved Supervisors | Condition Adverse to Quality |
ML18031B136 | 16 January 1987 | Forwards Updates of TVA Activities for Wks of 870119 & 26 | |
ML20212F454 | 29 December 1986 | Forwards Insp Repts 50-438/86-07 & 50-439/86-07 on 861001-1130 & Notice of Violation | |
ML20215A158 | 9 December 1986 | Final FOIA Response to Request for Documents Re Welding,Mfg & Const Deficiencies Concerning Tdi.Forwards App E Documents.Documents Also Available in PDR | |
ML18031B001 | 14 November 1986 | Forwards Updates of TVA Activities for Wks of 861117 & 24 | |
ML20215K560 | 16 October 1986 | Notifies of Util Commitments on Response to IE Bulletin 85-001 Re Steam Binding of Auxiliary Feedwater Pumps. Procedures to Be Developed Will Meet Intent of Bulletin Re Monitoring Fluid Conditions & Recognizing Binding | |
IR 05000438/1986004 | 6 August 1986 | Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-438/86-04 & 50-439/86-04 | |
ML20198E298 | 20 May 1986 | Discusses Points of View & Concerns Expressed in Ucs Press Release & Re B&W Reactors,Including Plan Responsiveness,Auxiliary Feedwater Sys & Integrated Control Sys.Achievement of Goals Will Reduce Ucs Concerns | |
ML20203N390 | 1 May 1986 | Forwards Rev 2 to Tdi Owners Group App Ii:Generic Maint Matrix & Justifications. Rev Approved by Tdi Owners Group & Tdi | |
ML20141A354 | 13 March 1986 | Addl Response to FOIA Request for Documents Re Delays or Progress on Const.App C Documents Available in PDR | |
ML20154M259 | 18 February 1986 | Discusses SER of Rev 1 to BAW-1847 & BAW-1889P Re Elimination of Postulated Pipe Breaks in PWR Primary Main Loops.Repts Acceptable.Leakage Detection Sys Info Requested | Exemption Request |
ML20137Y058 | 18 February 1986 | Requests facility-specific Info Re Requests for Exemption from GDC 4,concerning Protection Against Dynamic Loads Resulting from Postulated Breaks of Primary Main Loop Piping.Info Re Leakage Detection Sys Should Be Included | Exemption Request |
ML20137Y043 | 18 February 1986 | Discusses Safety Evaluation of B&W Owners Group Repts Dealing W/Elimination of Postulated Pipe Breaks in PWR Primary Main Loops.Exemption from GDC 4 & Demonstration That Leakage Sys in Compliance W/Reg Guide 1.45 Needed | Exemption Request |
ML20199F238 | 4 February 1986 | FOIA Request for All Documents Re Delays or Progress of Const at Bellefonte Nuclear Plant,Including Const Schedules or Projections & Const Status Repts |