Responds to NRC Re Violations Noted in IE Insp Repts 50-438/83-31 & 50-439/84-31.Corrective Actions: Procedure IDP 52.05 Re Control & Handling of Vendor Manuals Will Be Issued by 840720,per Generic Ltr 83-28
ML20093F235
Person / Time
Site: Bellefonte  Tennessee Valley Authority icon.png
Issue date: 03/30/1984
From: Mills L
TENNESSEE VALLEY AUTHORITY
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20093F216 List:
References
GL-83-28, NUDOCS 8407180301
Download: ML20093F235 (2)


Text

., -

TENNESSEE' VAL. LEY . AUTHORITY j CHATTANOOGA. TENNESSEE 374o1 400 Chestnut Street Tower II l 8

4 b rch 30, 1984 U.S. Nuclear Regulatory Commission  !

Region II  !

Attn: Mr. James P. O'Reilly, Regional Administrator 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30303

Dear Mr. O'Reilly:

BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 - RESPONSE TO NRC REQUEST FOR INFORMATION Enclosed is TVA's msponse to R. C. Lewis' letter dated January 14, 1984, report numbers 50-438/83-31, 50-439/83-31 concerning our program to identify the applicability of vendor information to safety-related structures, systems, and components. Accompanying NRC's statement of concern was a request that TVA provide a response which describes "those particular actions, taken or planned, to improve the effectiveness of your (TVA's) program."

Several weeks delays of this submittal were discussed with NRC-0IE Inspector P. E. Fredrickson on February 13, 1984 and again on March 1, 1984.

If you have any questions concerning this matter,' please get in touch with R. H. Shell at FTS 858-2688.

< Very truly yours, TENNESSEE VALLEY AUTHORITY DS h L. M. Mills, Manager Nuclear Licensing Enclosure cc: Mr. Richard C. DeYoung, Director (Enclosure)

Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Records Center (Enclosure)

Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, Georgia 30339 8407180301 840404

-PDR ADOCK 05000438 G PDR 1983-TVA 5OrH ANNIVERSARY An Equal Opportunity Employer

  • ENCLOSURE BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 RESPONSE TO NRC REQUEST FOR INFORMATION INSPECTION REPORT 50-438/83-31, 50-439/83-31 TVA Response Before the NRC inspection in November and December 1983, TVA had recognized the importance of assuring that the vendor information in the hands of our Construction, Operations, and Maintenance personnel is accurate, complete, and up-to-date. Initial groundwork for issuing an Interdivisional Procedure (IDP) has already been accomplished and a task force met on February 1, 1984, to finalize plans for issue of IDP 52.05 for the Control and Handling of Vendor Manuals. We note that our efforts in this area are being coordinated with the efforts of the Nuclear Utility Task Action Committee (NUTAC) for Generic Letter 83-28, Section 2 .2 .2 . As the NUTAC work is completed, we should be able to establish a firm issue date for this procedure.

We believe that implementation of this procedure will prevent recurrence of violations due to inadequate control of vendor information because:

1. This IDP will ensure that all vendor manuals are reviewed by the procuring organization to make sure they are accurate and complete (i.e. , that they contain all information necessary for proper storeage, installation, and maintenance of equipment).
2. The vendor manuals will be issued as controlled documents. Return receipt acknowledgement will be required for their initial issue and for any revisions. This will ensure that the information available to those individuals charged with handling, installing, and operating the equipment is accurate, complete, and up-to-date.

We conservatively expect the completed IDP 52.05 to be issued on or before July 20, 1984.

4