Notifies of Util Commitments on Response to IE Bulletin 85-001 Re Steam Binding of Auxiliary Feedwater Pumps. Procedures to Be Developed Will Meet Intent of Bulletin Re Monitoring Fluid Conditions & Recognizing Binding
ML20215K560
Person / Time
Site: Bellefonte  Tennessee Valley Authority icon.png
Issue date: 10/16/1986
From: Gridley R
TENNESSEE VALLEY AUTHORITY
To: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
IEB-85-001, IEB-85-1, NUDOCS 8610280212
Download: ML20215K560 (2)


Text

'

TENNESSEE VALLEY AUTHORITY CH ATTANOOGA. TENNESSEE 37401 SN 157B Lookout Place 05'gg7 0

llll *.

27 OCT 161986 U.S. Nuclear Regulatory Commission Region II Attn: Dr. J. Nelson Grace, Regional Administrator 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323

Dear Dr. Grace:

BELLEFONTE NUCLEAR PLANT (BLN) UNITS 1 AND 2 - IE BULLETIN 85 STEAM BINDING OF AUXILIARY FEEDWATER PUMPS In response to IE Dulletin 85-01 issued October 29, 1985, TVA commits to the following actions for BLN.

Auxiliary feedwater pump discharge temperature will be monitored at BLN. The modifications and/or procedural requirements necessary to accomplish this will be completed before unit 1 fuel load.

The procedures to be developed will meet the intent of the bulletin regarding monitoring fluid conditions, recognizing steam binding, and restoring the auxiliary feedwater system to operable status should steam binding occur.

These procedural controls will be developed and remain in effect unless and until hardware modifications substantially reducing the likelihood of steam binding are implemented.

If you have any questions regarding this matter, please get in touch with J. D. Ziegler at (615) 751-8077.

Very truly yours, TENNES EE VALLFY AUTHORITY R. . Gridley Director Nuc ear Safe y and Licensing cc: See page 2 8610280212 861016 PDR ADOCK 05000438 G PDR Q f 3s~/f *"

CA h*RC ; EGG! t; An Equal Opportunity Employer ._ OFFICIAL COPY .

I

a U.S. Nuclear Regulatory Commission Otri162136 BELLEFONTE NUCLEAR PLANT (BLN) UNITS 1 AND 2 - IE BULLETIN 85 STEAM BINDING OF AUXILIARY-FEEDWATER PUMPS cc: Mr. James Taylor, Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C. 20553 Records Center Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, Georgia 30339 Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 I

Mr. Gary Zech, Director l

'TVA Projects U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323

,