ML20215K560
| ML20215K560 | |
| Person / Time | |
|---|---|
| Site: | Bellefonte |
| Issue date: | 10/16/1986 |
| From: | Gridley R TENNESSEE VALLEY AUTHORITY |
| To: | Grace J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| IEB-85-001, IEB-85-1, NUDOCS 8610280212 | |
| Download: ML20215K560 (2) | |
Text
'
TENNESSEE VALLEY AUTHORITY CH ATTANOOGA. TENNESSEE 37401 05'gg7 SN 157B Lookout Place 0 llll *. 27 OCT 161986 U.S. Nuclear Regulatory Commission Region II Attn: Dr. J. Nelson Grace, Regional Administrator 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323
Dear Dr. Grace:
BELLEFONTE NUCLEAR PLANT (BLN) UNITS 1 AND 2 - IE BULLETIN 85 STEAM BINDING OF AUXILIARY FEEDWATER PUMPS In response to IE Dulletin 85-01 issued October 29, 1985, TVA commits to the following actions for BLN.
Auxiliary feedwater pump discharge temperature will be monitored at BLN.
The modifications and/or procedural requirements necessary to accomplish this will be completed before unit 1 fuel load.
The procedures to be developed will meet the intent of the bulletin regarding monitoring fluid conditions, recognizing steam binding, and restoring the auxiliary feedwater system to operable status should steam binding occur.
These procedural controls will be developed and remain in effect unless and until hardware modifications substantially reducing the likelihood of steam binding are implemented.
If you have any questions regarding this matter, please get in touch with J. D. Ziegler at (615) 751-8077.
Very truly yours, TENNES EE VALLFY AUTHORITY R.
. Gridley Director Nuc ear Safe y and Licensing cc: See page 2 8610280212 861016 PDR ADOCK 05000438 G
PDR Q f 3s~/f CA h*RC
- EGG! t; An Equal Opportunity Employer
._ OFFICIAL COPY.
I
- - a U.S. Nuclear Regulatory Commission Otri162136 BELLEFONTE NUCLEAR PLANT (BLN) UNITS 1 AND 2 - IE BULLETIN 85 STEAM BINDING OF AUXILIARY-FEEDWATER PUMPS cc: Mr. James Taylor, Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.
20553 Records Center Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, Georgia 30339 Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.
20555 Mr. Gary Zech, Director l
'TVA Projects U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323
,