ML20247E494

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-438/89-01 & 50-439/89-01 on 890111.No Violations or Deviations Noted
ML20247E494
Person / Time
Site: Bellefonte  Tennessee Valley Authority icon.png
Issue date: 03/10/1989
From: Mccoy F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II), Office of Nuclear Reactor Regulation
To: Kingsley O
TENNESSEE VALLEY AUTHORITY
Shared Package
ML19302D774 List:
References
NUDOCS 8904030112
Download: ML20247E494 (2)


See also: IR 05000438/1989001

Text

--

..

7 .

.

  • ,
  • ,

"

'

.

-

MM7109

MATEME TRANSMITTED HEREWITH

CoNTAINS 2,790 INFORMATioN

.

.

Docket Nos. 50-438, 50-439 ~

License Nos. CPPR-122, CPPR-123, SNM-1865, SNM-1883'

Mr. Oliver D. Kingsley, Jr.

Senior Vice President, Nuclear Power

Tennessee Valley Authority

6N 38A Lookout Place

1101 Market Street

Chattanooga, TN 37402-2801

Dera Mr. Kingsley:

SUBJECT: NRC INSPECTION REPORT NOS. 50-438/89-01 AND 50-439/89-01

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

G. A. Todd on January 11,-1989. The inspection included a review of activities

authorized for your.Bellefonte facility. At the conclusion of the inspection,

the findings were discussed with those members of your staff identified in the'

enclosed Inspection Report.

Areas ; examined during the- inspection are . identified in the report. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observation of

activities in progress.

Within the scope of the inspection, no violations or deviations were

identified.

In accordance with 10 CFR 2.790(d) and 10 CFR 73.21, safeguards activities and

security measures are exempt from public disclosurc. Therefore, the enclosure -;

to this letter with the exception of the report cover page, which presents a j

nonexempt summary, will not be placed in the NRC Public Document Room. l

l

Should you have any questions concerning this letter, please contact us.

Sincerely,

!

h o g 12 890320 -

I

O Frank R. McCoy, Ass stant Director

M8

for TVA Inspection Programs i

TVA Projects Division i

Office of Nuclear Reactor Regulation d

Enclosure: (See page 2)

M ATERIAL TRAN0f/,ITTED HF ITWITH l

CoNTAINS 2.790 INFORMAT!CN I

o---50 -

_ . - _ - _ - _ _

,

"'

., "'

No$$s$s?!9s&E0lQWInf

4 'N Mr. Ol'iver d. Kingsley, Jr.

'

,

2

4%j g g

.

  • --

Enclosure:

NRC Inspection Report .. I

(Exempt-from Diselosure)

cc w/ enc 1:

F.. L. Moreadith, Vice' President,

Nuclear Engineering

R. A. Pedde,' Site Direccor-

Bellefonte Nuclear Plant

R. L. Gridley, Director

Nuclear Safety and Licensing

M. He11ums, Site Licensing

Manager

TVA Representative, Rockville Office

General-Counsel, TVA

cc w/ Inspection Summary:

State of Alabama

t

bec w/ enc 1:

-NRR/DRIS/SB

B. Murray, RIV

Document Control Desk (RIDS IE02), 016

bec w/o enc 1:

License Fee Management Branch

w

er

"'y

EMc pane

03/3 /89

Q"Clinef tALong

W

03 /89

% F0W

/89 03/c7 /89

.

..- MATERIAL 1RANSMITTED HEREWITH

_CONTAINS 2.790 Info 4MATION

L __ _-____ - _ -----_--