ML20132G986

From kanterella
Revision as of 03:52, 10 August 2022 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Forwards Rev 20 to PGE-8010, Portland General Electric Nuclear QA Program for Trojan Nuclear Plant. Rev Reflects Administrative & Corporate Organizational Changes Continue to Meet Requirements of 10CFR50,App B,As Described
ML20132G986
Person / Time
Site: Trojan  File:Portland General Electric icon.png
Issue date: 12/12/1996
From: Quennoz S
PORTLAND GENERAL ELECTRIC CO.
To: Haughney C
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
Shared Package
ML20132G990 List:
References
TAC-L22102, VPN-081-96, VPN-81-96, NUDOCS 9612270103
Download: ML20132G986 (6)


Text

.

WD uma Portland General Electric Company as g Stephen M. Quennoz December 12,1996 Trojan Site Executive VPN-081-96 i

i Trojan Nuclear Plant Docket 72-0017 4

Charles J. Haughney Acting Director, Spent Fuel Projects OfBce OfBee of Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555 -

Dear Sir:

10 CFR 72, Subpart B - Application for License (TAC No. L22102)

Channes to Nuclear Ouality Assurance Program for Troian Nuclear Plant (PGE-8010. Revision 20)

By letter dated March 26,1996, Portland General Electric (PGE) submitted a license application to construct and operate an Independent Spent Fuel Storage Installation (letter number VPN-012-%). Included in that application was PGE-8010, "PGE Nuclear Quality Assurance Program for Trojan Nuclear Plant,"

Revision 19. This letter transmits changes to PGE-8010, "PGE Nuclear Quality Assurance Program for Trojan Nuclear Plant," Revision 20, for your review.

PGE is submitting the revised QA Program to permit NRC to make a finding that the QA Program complies with 10 CFR 72, Subpart G. This revision reflects administrative and corporate organizational changes which continue to meet the requirements of 10 CFR 50, Appendix B, as described in the attachment to this letter.

The attachment to this letter provides a description and justification for changes. The enclosure provides the revised pages for insertion into your controlled copy of PGE-8010. Changes are identified by a revision bar in the margin of the new pages.

If you should have any questions, please contact Mr. C. Paul Yundt, of my staff, at (503) 556-7492.

Sincerely, 240142 #

9612270103 961212 Stephen M. Quennoz 8 @c, h' DR ADOCK 050003 4 Trojan Site Executive Encicsure Attachment e g [O -

/ ,

h k 0lbl{.b hp f . , > .y' 71760 Columbia River Highway. Rainier, OR 97 8 503/556-3713

. - _ _ - - - _ . _ . . . -. .. .. -. ~ _ - . . . - - . . . . . _ . ,

l

. i l

1 i

c: L. E. Kokajko, NRC SFPO l J. V. Everett, NRC Region IV (w/o enclosure) l M. T. Masmk, NRC NRR (w/o enclosure) i L. J. Callan, NRC Region IV (w/o enclosure)

Dr. B. D. Spitzberg, NRC Region IV (w/o enclosure)

D. Stewart-Smith, ODOE (w/o enclosure) 4

)

4 t

l 1

I, i

i j

i

-d f

i

, i i

1 4

j

i .

STATE OF OREGON, )

)

i

)

COUNTY OF COLUMBIA )

I, Stephen M. Quennoz, being duly sworn, subscribe to and say that I am the Trojan Site Executive for Portland General Electric Company, the applicant herein; that I have full authority to execute.this oath; that I have reviewed the foregoing; and that to the best ofmy knowledge, information, and belief the statements made in it are tnAt Date December 12.1996

,27 w - ,C _ :_ .y Stephen M. Quennoz Trojan Site Executive Portland General Electric Company On this day personally appeared before me Stephen M. Quennoz, to me known to be the individual who executed the foregoing instrument, and acknowledged that he signed the same as his free act.

GIVEN under my hand and seal this 12th day of December,1996.

Mh.

Nbtary Public in a0 for the e

mMBB State of Oregon "unm,KEYA.gange ynauca meow "o"m""%s ""%

Residing at Otl1;w b A My commission expires 6'l-4'7

.. l

. l 1

1 m M g PbrtlandGenerd ElectricCorry)any i

CPY-109-96 TO: Distribution l l

FROM:

C. P. Yundt ([k DATE: December 12,1996

SUBJECT:

Transmittal of Revision 20 to the Trojan Nuclear Plant Niicienr Oumlirv Aceursnee Prnarnm PGF A010 Enclosed are mplacement pages for your Controlled Copy of the Trojan Nuclear Plant Nuclear Quality Assurance Program, PGE-8010. The pages are to be inserted in accordance with the accompanying instruction sheet.

Please acknowledge receipt of your copy by completing the lower ponion of this transmittal and remrning it to the location given below.

CPY/CKC Enclosure 12/12/96 ACKNOWLEDGMENT PGE-8010. Trojan Nuclear Plant Nuclear Quality Assurance Program Revision 20 I hereby acknowledge mceipt of Controlled Copy number b/8 the subject document. All i changes have been made in accordance with the instructions, and superseded pages have been destroyed.  !

Signature of Copy Holder Date j Return to: Pat Schaffran/TCB-2 Trojan Nuclear Plant

]

71760 Columbia River Highway l Rainier, Oregon 97048

i 1

u

, Anehmar* to VPN-081-96 j D -amh- 12,1996 Pasa 1 of 1 l

The following Licensing Document Change Request (LDCR) is incorporated into Revision 20. A brief description of the LDCR and the basis for the changes is included below.

l M:9H The titles of"Vice President and Chief Nuclear Officer" and "Vice President, Nuclear," are removed from the text and replacM with " Trojan Site Executive and Plant General Manager," or " Plant General Manager."

Changes also include combining the positions and responsibilities of the "Vice President and ChiefNuclear

Of5cer, Acting Vice President Nuclear, and Trojan Plant General Manager into one position.

t, j These changes to the Nuclear Quality Assurance Program implement Possession-Only License NPF-1, Ammadmar* #195, which was approved by NRC in a letter dated October 31,1996. These changes were 4

determined to be in accordance with 10 CFR Part 50, Appendix B, Criterion I, of the Commission's i regulations. The Nuclear Oversight Department still reports to the management position (Trojan Site Executive and Plant General Manager) that has corporate responsibility for overall nuclear safety and retains authority and orgamzational freedom to perform their quality assurance function.

1 J

i j

t i

l i

3 d

I i

- -, m _. _ ._ .._ , _- -

i -

TROJAN NUCLEAR PLANT PGE-8010, " Trojan Nuclear Plant Nuclear Quality Assurance Program" f Revision 20 The following information is provided as a guide for the insertion of new sheets for Revision 20 into PGE-

8010, " Trojan Nuclear Plant Nuclear Quality Assurance Program."

4 New sheets should be inserted as listed below:

Ta=*rt Pane Remo
e Pane

^ . I Title Page Title Page H l H

i ivandv l iv and v l-1 through 1-4 1-1 through 1-4 1-6 1-6 i i

k i

I l

1 lO 3

i )

l t

t 4

O ,

I l

!