IR 05000327/1985019

From kanterella
Revision as of 22:49, 9 August 2022 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-327/85-19 & 50-328/85-19
ML20133N536
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 08/08/1985
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML20133N539 List:
References
NUDOCS 8508130520
Download: ML20133N536 (1)


Text

-

,

AU6 08 885 Tennessee Valley Authority ATTN: Mr. H. G. Parris Manager of Power and Engineering (Nuclear)

6N11 B Missionary Ridge Place ,

1101 Market Street Chattanooga, TN_ 37402-2801 Gentlemen:

SUBJECT: REPORT NOS. 50-327/85-19 AND 50-328/85-19 Thank you for your response of July 31, 1985, to our Notice of Violation issued on July 3, 1985, concerning activities conducted at your Sequoyah facility. We have evaluated your response and found that it meets the requirements of 10 CFR 2.20 We will examine the implementation of your corrective actions during future inspection We appreciate your cooperation in this matte f

Sincerely, ls J. I ds-J. Nelson Grace Regional Administrator

)~"

cc: H. L. Abercrombie, Sequoyah Nuclear Plant Site Director P. R. Wallace, Plant Manager K. W. Whitt,-Chief, Nuclear Safety Staff D. L. Williams, Jr., Supervisor Licensing Section 1 G. B. Kirk, Compliance Staff Supervisor J. E. Wills, Project Engineer bec: IE File NMSS/SGPL NRR/DL/SSPB Document Control Desk, 016 NRC Resident Inspector ). -[

State of Tennessee r/

RII - RI?

I RII }

BV RI h

I JEr(tfli s:sa ire rr JPhtohr DVerrelli NTker J01 inski 08/f/85 08/g/85 08/ 6 /85 08/(,/8508/g/85 08/'J/85 08/ 5 69d I 8508130520 850808

{DR ADOCK 05000327 PDR