IR 05000457/1987013

From kanterella
Revision as of 08:05, 4 May 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Insp Rept 50-457/87-13 on 870423,28 & 0505-27.No Violations or Deviations Noted.Major Areas Inspected:Preservice Insp Activities,Including Programs,Procedures & Work Activities
ML20214S985
Person / Time
Site: Braidwood Constellation icon.png
Issue date: 06/03/1987
From: Danielson D, Ward K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20214S979 List:
References
50-457-87-13, NUDOCS 8706100077
Download: ML20214S985 (4)


Text

->

-

.

U.S. NUCLEAR REGULATORY COMISSION

REGION III

-Report No. 50-457/87013(DRS)

Docket No. 50-457 Construction Permit No. CPPR-133 Licensee: Comonwealth Edison Company Post Office Box 767 Chicago, IL 60690 Facility Nane: Braidwood Station, Unit 2 Inspection At: Braidwood Site, Braidwood, Illinois Inspection Conducted: April 23, 28, May 5,12, 20-21, and 27, 1987 ZAM 87#I Inspector: K. D. Ward Date Accompanied By: B.ii. Jun (April 23, May 5, and 12, 1987)

Approved By:

rf D. H. Danielson, Chief h!1 Materials and Processes Section Date Inspection Summary Inspection on April 23, 28, May 5, 12, 20-21, and 27, 1987(Report N /87013(DRS))

Areas Inspected: Routine, unannounced inspection of (PSI) activities including Review of Programs (73051)preservice inspection

, Procedures (73052),

Observation of Work and Work Activities (73053), Data Review and Evaluation (73055), and Review of Shop and Field Radiographs (57090).

Results: No violations or deviations were identifie %flhN

5

[

.

DETAILS 1.. Persons Contacted-Commonwealth Edison Company (CECO)

  • P. Barnes, Regulatory Assurance Supervisor
  • G. Nelson, Assistant Technical Staff Supervisor
  • T. McLean, Regulatory Assurance
  • D. Chrzanowski, Technical Staff
  • M. Sears, PSI /ISI
  • C, Barrett, PSI /ISI M. Wallace, Project Manager T. Green, PSI Hartford Steam Boiler Engineering and Insurance Company (HSB)

W. Calwell, ANII U.S.- Nuclear Regulatory Commission (NRC)

  • T. Tongue, Senior Reactor Inspector W. Kropp, Senior Reactor Inspector-T. Taylor, Reactor Inspector The inspector also contacted and interviewed other licensee and contractor personne * Denotes those present at the final exit interview, May 27, 198 . Preservice Inspection (PSI), Unit 2 General-Ceco Nondestructive Examination (NDE) personnel: performed Ultrasonic Examinations (UT), Pittsburgh Testing Laboratory'(PTL)

performed Liquid Penetrant (PT), Magnetic Particle (MT) and UT, Lambert, MacGill, Thomas, Inc. (LMT); and Phillips Getschow Company (PGC) performed MT and PT in accordance with ASME Section XI, 1977 Edition, Summer 1978 addend Most of the UT was performed by CECO, using pulse-echo ultrasonic plan detection instruments and transducers with various angles and sizes. There were individuals from CECO and LMT who were qualified at the EPRI NOE Center for detection of IGSC . _ _ - _ - _ _ _

.. .

. Programs and Procedures The NRC Inspector reviewed the PSI procedures and programs and found them to be acceptable. Where these rules were determined to be impractical, specific relief was requested in writing. The NRC inspector reviewed the specific relief requests and related documentation, Review of Material, Equipment and Personnel Certifications, Audits, and Data The NRC Inspector reviewed documents relating to the following:

  • Ultrasonic instruments, calibration blocks, transducers and UT couplant
  • Magnetic Particle Examination equipment certifications
  • NDE personnel certifications in accordance with SNT-TC-IA
  • Audits and surveillances
  • Data reports Observation of Work Activities

,

The NRC Inspector observed work and had discussions with personnel I during the PSI activitie These observations included calibration j and performance of the following NDE and documentation:

i

'

The readings are recorded constantly by a calibrated gage (strip chart),

checked daily, and recorded in the vault temperature / humidity log. There is also a viewing area in the vault to interpret radiograph The NRC Inspector reviewed radiographs and reports of 147 shop pipe welds that were radiographed by Southwest Fabricating & Welding Co.,

Inc. in accordance with ASME Section III, 1974 Edition, Summer 1975

3

_ _ _ _ _ _ _ - _ _ _ _ _ - _ _ _ _ _ _

._ ,

, -- ..

Addenda, and-found them to be acceptable. They were of the RC, RH, FW, CV,.SI and the MS systems, various-diameters and thicknesses, The NRC Inspector also reviewed radiographs and reports of 54 field pipe welds that were radiographed by Pittsburg. Testing Laboratory in accordance with ASME Section III, 1974 Edition, Summer 1975 Addenda, and found them to be acceptable. They were of the'RC, RY, SI, RH, FW, MS and CV systems, various diameters and thicknesse No violations or deviations were identifie ,,

4. Exit Interview /

The inspector met with site representatives (denoted in Persons Contacted paragraph) at the conclusion of the inspection. The inspector summarized the scope and findings of the inspection noted in this report. The inspector also discussed the likely informational content of the inspection report with. regard to documents or processes Jeviewed by the inspector during the inspection. The. licensee did not identify any such document / processes as proprietar ,

'

,