Text
.
.
..
,
.
'
OCT 8 01987
.
Docket No.'50-454 Docket No. 50-455 l
Docket No. 50-456
'
Commonwealth Edison Company ATTN: Mr. Cordell Reed Senior Vice President Post Office Box.767 Chicago, IL 60690 J
Gentlemen:
I
.l Thank you for your letter dated October 15, 1987 informing us of.the. steps you~
)
have taken to correct the violation and your response to the unresolved item l
which we brought to your attention in our letter. dated September 16, 1987;
..
transmitting Inspection Reports No. 50-454/87032; 50-455/87030_ and 50-456/'
- !
87028. We will examine these matters during a future inspection, a..
'l Per your request, we have re-evaluated the Severity Level of the violation.
identified in our letter. We have concluded that our assignment of a Severity.
' L)
Level IV was appropriate. As'noted in the Notice of Violation (NOV) the i
violation involved the failure to provide a QA program to control activities I
consistent with their importance to_ safety. As a result'of this. failure to t
adequately ensure that the final copies of Emergency.0perating Procedures (EOPs) were accurate, the poten.tial existed for safety significant errors to occur. While we cited only two examples in our.NOV, our review was of only a -
'3 small sample of your E0Ps. Your additional reviews confirmed that. these
examples were not isolated cases. Therefore, we consider that our inspection i
report identified,a basic problem wnich provided the potential.for highly l
significant errors to go undetected, j
l
Sincerely,
)
Original Ci sud By-H. J. Miller,
'1 t
.
Hubert J. Miller,- Director Division of Reactor. Safety y
R
_See Attached Distribution
-
"
,
8
-
8711060185 871030
'
,
h PDRADOCK 05000454.
G PDR
,, -
't
\\
,
l II Rill-
- RI I,
RIIb
.
,
RIII 111..
'
kec ske ps
-
mgo
%
- 'W it Miller-
/mc o
ns
-
+
,
i
.
.;gWl.
~
.
_ -. - -
.Y
,
..v
.
,
,
.
.
~
-
-_
__
.
.
,
.
OCT 8 01ss?
'
Commonwealth Edison Company
D_ distribution cc w/ enclosure T. J. Maiman, Vice President, PWR Operations D. Butterfield, Nuclear Licensing Manager M. Wallace, Manager of Projects D. Shamblin, Project Manager
~
W. Vahle, Construction Superintendent E. E. Fitzpatrick, Station Manager P. L. Barnes, Regulatory Assurance Supervisor V. Schlosser, Project Manager Gunner Sorensen, Site Project Superintendent R. E. Querio, Plant Manager Utilities Division DCD/DCB(RIDS)
Licensing Fee Management Branch Resident Inspector, RIII Braidwood Resident Inspector, RIII Byron D. W. Cassel, Jr., Esq.
Richard Hubbard J. W. McCaffrey, Chief, Public Utilities Division H. S. Taylor, Quality Assurance Division Diane Chavez, DAARE/ SAFE L. Olshan, NRR, LPM E. Chan, OGC.
G. Berry, 0GC J. Stevens, HRR The Honorable A. Dixon Callihan, ASLB The Honorable Richard F. Cole, ASLB The Honorable.Ivan W. Smith, ASLB The Honorable Gary J. Edles, ASLAP-The Honorable Dr. W. Reed Johnson, ASLAP The Honorable Christine N. Kohl, ASLAP
'1
. >.
.
F.
t y
- '. j
_ _ _ _.. _ _ _