IR 05000457/1987044

From kanterella
Jump to navigation Jump to search
Forwards Proprietary Preoperational Safeguards Insp Rept 50-457/87-44 on 871116 & 18.No Violations Noted.W/O Encl
ML20236X897
Person / Time
Site: Braidwood Constellation icon.png
Issue date: 12/01/1987
From: Mallett B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
References
NUDOCS 8712100344
Download: ML20236X897 (2)


Text

- _ _ _ _ _ _ _ _ _ _ _ _ _ _. -.

D CD

%

JD

,>

'

DEC 01 1987 Docket No. 50-457 Commonwealth Edison Company ATTN:

Mr. Cordell Reed i

Senior Vice President Post Office Box 767

!

Chicago, IL 60690 l

Gentlemen:

l J

This refers to the preoperational safeguards inspection conducted by

Messrs. T. J. Madeda and D. E. Funk, Jr. of this office on November 16 and 18, 1987, of activities at the Braidwood Nuclear Power Plant, Unit 2, authorized by NRC Construction No. CPPR-133 and to the discussion of our findings with Mr. E. Fitzpatrick and other members of your staff at the conclusion of the inspection.

The enclosed copy nf our inspection report identifies areas examined during the inspection.

Within these areas, the inspection consisted of a selective examination of procedures and representative records, observations, and interviews with personnel.

No violations of NRC requirements were identified during the course of this inspection.

Areas examir.ed during the inspection concern a subject matter which is exempt from disclosure according to Section 2.790 of the NRC's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations.

Consequently, our report of this inspection will not be placed in the NRC Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

&ad/4/M)

Bruce S. Mallett, Ph.D., Chief Nuclear Materials Safety and Safeguards Branch Enclosure:

Inspection Report

No. 50-457/87044(DRSS)

(Ob

(PART 2.790(d) INFORMATION)

See Attached Distribution

RIII

RIII

R:

I

RIII

RI I

/

l>Se

i

a/jlr

F

d

P.allett

Porney

"h

"

DTCLOSURE CONTAINS

,W

8712100344 871201 _

10CFR2.790 INFORMATION

PDR

ADOCK 050

UPON SEPARATION THIS/

G

PAGE IS DECONTROLLED

_. _..

..

.

_ _ _ _ _ _

_

..----.-__________J

_

_

_

__

__

_ _.

_ _ _

.

j

..

!

-

.

l

~

Commonwealth E<iison Company

EC 01 1987.

I

Distribution

cc w/ enclosure:

T. J. Maiman, Vice President,

PWR Operations

D. Butterfield, Nuclear

Licensing Manager

M. Wallace, Manager of Projects

D. Shamblin, Project Manager

W. Vahle, Construction

!

Superintendent

E. E. Fitzpatrick, Station

,

Manager

j

P. L. Barnes, Regulatory

Assurance Supervisor

DCD/DCB (RIDS)

cc w/ enclosure, w/o PARY 2.790(d)

INFORMATION:

Licensing Fee Management Branch

Resident Inspector, RIII

Braidwood

Resident Inspector, RIII Byron

D. W. Cassel, Jr., Esq.

.

Richard Hubbard

l

J. W. McCaffrey, Chief, Public

Utilities Division

H. S. Taylor, Quality Assurance

Division

E. Chan, 0GC

G. Berry, 0GC

J. Stevens, NRR

The Honorable A. Dixon Callihan, ASLB

The Honorable Richard F. Cole, ASLB

The Honorable Ivan W. Smith, ASLB

The Honorable Gary J. Edles, /. SLAP

The Honorable Dr. W. Reed Johnson, ASLAP

The Honorable Christine N. Kohl, ASLAP

!

ENCLOSURE CONTAINS

10CFR2. 790 INFORMATION

UPON SEPARATION THIS

PAGE IS DECONTROLLED

'

- - - _ _ _