Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-457/87-36.Item 457/87-36-02b of Notice of Violation Example of Noncompliance
ML20155J201
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 06/10/1988
From: Harrison J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20155J204 List:
References
NUDOCS 8806200457
Download: ML20155J201 (2)


Text

,~

..

.;

. .

o JUN 101988 Docket No. 50-456 Docket No. 50-457 Commonwealth Edison Company ATTN: Mr. Cordell Reed l

Senior Vice President Post Office Box 767 Chicago, IL 60690 l Gentlemen:

Thank you for your letter dated April 28, 1988, informing us of the steps you have taken to correct the items of noncompliance which we brought to your attention in our letter dated March 18, 198 Regarding your response to Item 457/87036-02b of the Notice of Violation, we have reviewed the information in your response and still believe this is an example of noncompliance. Cable termination cards are required by L. Comstock procedure 4.3.9, "Cable Termination Installation". In addition, L. K. Comstock Work Instruction WI-4.3.9-01, "Work Instruction for Termination Cards", in Section 4.1 states that "To have records that reflect the actual installed condition of cable, all types of cable termination cards must be filled out accurately end consistently". Finally, the statement in your response that termination cards do not determine the acceptability of the installation is contradicted by the statement in your response to item 457/87036-02c which indicates that the Quality Control inspector utilized the determination card to determine that cable 2VA720 was correctly installed. Since your response indicates that the subject cables have now been correctly terminated, no further response to this noncompliance is require Regarding your response to Item 457/87036-04c of the Notice of Violation, your response failed to clearly acknowledge the scope of the inspector's concer In addition to the loose bolts acknowledged in your response, the inspector identified 25 missing bolts. However, the corrective actions identified in your response are acceptable and no further response to this noncompliance is require We will examine these matters during a future inspectio

Sincerely, c7 -jd C;;=3 by J. J. IhffId

-

' J. J. Harrison, Chief Engineering Branch See Attached Distribution RIII RIII RIII RI vits/j k Hin Ga ner Harrison 06/09/88 06/o9/88 06/oj/88 06//0 /88 \\

yet 8806200457 880610 PDR ADOCK 050003 6 -. .k

_ _ _ - _ _ - - _

. . . .-. . - _ _ _ . _ _ _ _ _

..

-

.

.. .

'

WUN 101988 Coninonwealth Edison Company 2 Distribution cc: T. J. Maiman,-Vice President, PWR Operations H. Bliss, Nuclear Licensing Manager S. Hunsader, Manager of Projects M. Lohmann, Project Construction and Startup Superintendent W. Vahle, Construction

,

Superintendent R. E. Querio, Station Manager P. L. Barnes, Regulatory Assurance Supervisor cc w/ ltr dtd 4/28/88: ~

DCD/DCB (RIDS)

Licensing Fee Management Branch Resident Inspector, RIII Braidwood Resident Inspector, RIII Byron D. W. Cassel, Jr. , Es Richard Hubbard J. W. McCaffrey, Chief, Public Utilities Division i

H. S. Taylor, Quality Assurance Division E. Chan, 0GC

>

G. Berry, OGC Stephen P. Sands, NRR The Honorable A. Dixon Callihan, ASLB The Honorable Richard F. Cole, ASLB t The Honorable Ivan W. Smith, ASLB l The Honorable Gary J. Edles, ASLAP 4- The Honorable Dr. W. Reed Johnson, ASLAP The Honorable Christine N. Kohl, ASLAP

!

l l