Forwards Safety Insp Rept 50-457/87-13 on 870423,28 & 0505- 27.No Violations Noted
ML20214S975
Person / Time
Site: Braidwood Constellation icon.png
Issue date: 06/03/1987
From: Harrison J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20214S979 List:
References
NUDOCS 8706100074
Download: ML20214S975 (2)


See also: IR 05000457/1987013

Text

y

..

.

JUN

3 1987

Docket No. 50-457

Commonwealth Edison Company

ATTN: Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

'

Gentlemen:

This refers to the routine safety inspection conducted by Mr. K. D. Ward

of this office on April 23, 28, May 5, 12, 20-21, and 27, 1987, of activities

at Braidwood Station, Unit 2, authorized by NRC Construction Permit

No. CPPR-133 and to the discussion of our findings with Mr. P. Barnes and

others of your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No violations of NRC requirements were identified during the course of this

inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC

Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

caiginal Sign:d by J. J.11arrison

J. J. Harrison, Chief

Engineering Branch

Enclosure:

Inspection Report

No. 50-457/87013(DRS)

See Attached Distribution

]foY 6/ff7

jf('

RIII

RI I

RI

RI I Y

y

L']1

Ward /abl

0 1 1 son

Harrison

yb

Y3

Y

0

,

,

f

k bI

8706100074 870603

e

PDR

ADOCK 05000457

G

PDR

'

)p)

.

,

.y

Comonwealth Edison Company

2

JUN

3 1987

Distribution

cc w/ enclosure:

D. L. Farrar, Director

of Nuclear Licensing

M. Wallace, Project Manager

W. Vahle, Construction

Superintendent

E. E. Fitzpatrick, Station

Manager

P. L. Barnes, Regulatory

Assurance Su

DCS/RSB (RIDS)pervisor

Licensing Fee Management Branch

Resident Inspector, RIII

Braidwood

Resident Inspector, RIII Byron

D. W. Cassel , Jr. , Esq.

Richard Hubbard

J. W. McCaffrey, Chief, Public

Utilities Division

H. S. Taylor, Quality Assurance

Division

E. Chan, OGC

J. Moore, 0GC

G. Berry, OGC

J. Stevens, NRR

The Honorable Herbert Grossman, ASLB

The Honorable A. Dixon Callihan, ASLB

The Honorable Richard F. Cole, ASLB