Letter Sequence RAI |
---|
|
|
MONTHYEARML20248D1601998-05-28028 May 1998 Forwards RAI Re GL-96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions, Dtd 960930.Info to Be Submitted within 45 Days from Date of Receipt of Ltr Project stage: RAI ML20206U2041999-05-19019 May 1999 Informs That Attached Request for Addl Info Transmitted by Facsimile on 990519 to T Loomis of Licensee Staff.Review of RAI Would Allow Licensee to Determine & Agree Upon Schedule to Respond to RAI Project stage: RAI 1998-05-28
[Table View] |
|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217M6631999-10-19019 October 1999 Forwards Insp Rept 50-277/99-07 & 50-278/99-07 on 990920.No Violations Noted ML20217K9241999-10-14014 October 1999 Forwards Amend 234 to License DPR-56 & Se.Amend Consists of Changes to TS in Response to Application & Suppls ,1001 & 06,which Will Support PBAPS Mod P00507,which Will Install Digital Pr Neutron Mining Sys ML20217F7391999-10-14014 October 1999 Requests Addl Info Re Peach Bottom Atomic Power Station Units 2 & 3 Appendix R Exemption Requests ML20217F6841999-10-13013 October 1999 Forwards Senior Reactor Operator Initial Exam Repts 50-277/99-302(OL) & 50-278/99-302(OL) Conducted on 990913- 16.All Applicants Passed All Portions of Exam ML20217F3021999-10-12012 October 1999 Provides Written Confirmation That Thermo-Lag 330-1 Fire Barrier Corrective Actions at PBAPS Have Been Completed.Ltr Also Confirms Completion of Actions Required by Confirmatory Order Modifying Licenses, ML20217E7451999-10-0808 October 1999 Forwards Response to NRC 990820 RAI Concerning Proposed Alternatives Associated with Third ten-yr Interval ISI Program for Pbaps,Units 2 & 3 ML20217B7701999-10-0606 October 1999 Submits Corrected Info to NRC 980528 RAI Re Util Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions ML20217B9151999-10-0606 October 1999 Provides Clarifying Info to Enable NRC to Complete Review of License Change Request ECR 98-01802,re Changes Necessary to Support Installation of Digital Pr Neutron Monitoring & Incorporate long-term T/H Stability Solution Hardware ML20217C4141999-10-0606 October 1999 Forwards Response to NRC 981109 RAI Re Resolution of USI A-46 for Pbaps.Proprietary Excerpts from GIP-2,Ref 25 Results of BWR Trial Plant Review Section 8 Also Encl. Proprietary Excerpts Withheld ML20217B3181999-10-0505 October 1999 Advises That Info Submitted in 990712 Application,Which Contained Attachment Entitled, Addl Info Re Cycle Spec SLMCPR for Peach Bottom 3 Cycle 13,dtd 990609, with Affidavit,Will Be Withheld from Public Disclosure ML20217B4051999-10-0505 October 1999 Forwards Amend 233 to License DPR-56 & Safety Evaluation. Amend Changes Minimum Critical Power Ratio Safety Limit & Approved Methodologies Referenced in Core Operating Limits Report 05000278/LER-1999-004, Forwards LER 99-004-00 Re Multiple Unplanned ESF Actuations During Planned Mod Activities in Main Cr,Per Requirements 10CFR50.73(a)(2)(iv)1999-10-0101 October 1999 Forwards LER 99-004-00 Re Multiple Unplanned ESF Actuations During Planned Mod Activities in Main Cr,Per Requirements 10CFR50.73(a)(2)(iv) ML20217B8891999-10-0101 October 1999 Forwards Response to RAI Re Request to Install Digital Power Range Neutron Monitoring Sys & Incorporate long-term,thermal-hydraulic Stability Solution Hardware. Revised TS Table 3.3.2.1-1 Encl ML20217D5211999-09-30030 September 1999 Informs That Remediating 3D Monicore Sys at Pbaps,Units 2 & 3 & 3D Monicore/Plant Monitoring Sys at Lgs,Unit 2 Has Been Completed Ahead of Schedule ML20212J6851999-09-29029 September 1999 Informs of Completion of mid-cycle PPR of Peach Bottom Atomic Power Station on 990913.No Areas Identified in Which Licensee Performance Warranted Addl New Insps Beyond Core Insp Program.Historical Listing of Plant Issues Encl ML20216J3981999-09-29029 September 1999 Submits Comments for Lgs,Unit 1 & Pbaps,Units 2 & 3 Rvid,Rev 2,based on Review as Requested in GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity ML20212J5751999-09-28028 September 1999 Informs of Individual Exam Results for Applicants on Initial Exam Conducted on 990913-16 at Licensee Facility.Without Encls ML20216J0191999-09-27027 September 1999 Forwards Request for Addl Info Re Util 990301 Request to Support Installation of Digital Power Range Neutron Monitoring Sys & Incorporation of long-term thermal- Hydraulic Stability Solution Hardware,For Plant ML20212H6171999-09-24024 September 1999 Forwards Rev 2 to COLR for Pbaps,Unit 2,Reload 12,Cycle 13, IAW TS Section 5.6.5.d.Rept Incorporates Revised Single Loop Operation MAPLHGR Flow Multiplier ML20216H6451999-09-24024 September 1999 Forwards Notice of Withdrawal of Util 990806 Application for Amends to Fols DPR-44 & DPR-56.Proposed Change Would Have Involved Temporary Change to Increase Limit for Average Water Temp of Normal Heat Sink ML20212H5431999-09-24024 September 1999 Informs of Decision to Inspect H-3 & H-4 Shroud Welds During Upcoming 3R12 Outage Scheduled to Begin Late Sept 1999 ML20216H6751999-09-24024 September 1999 Forwards Amends 229 & 232 to Licenses DPR-44 & DPR-56, Respectively & Ser.Amends Will Delete SR Associated Only with Refueling Platform Fuel Grapple Fully Retracted Position Interlock Input,Currently Required by SR 3.9.1.1 ML20216F8811999-09-23023 September 1999 Withdraws 990806 Exigent License Change Application.Tech Spec Change to Allow Continued Power Operation with Elevated Cooling Water Temps During Potentially Extreme Weather Conditions No Longer Needed Due to Favorable Weather ML20212E8661999-09-22022 September 1999 Discusses GL 98-01 Y2K Readiness of Computer Sys at NPPs & Supplement 1 & PECO Response for PBAPS Dtd 990630. Understands That at Least One Sys or Component Listed May Have Potential to Cause Transient During Y2K Transition ML20212F5481999-09-20020 September 1999 Forwards Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing, for Pbaps,Units 2 & 3 & Lgs,Units 1 & 2 ML20212D1191999-09-17017 September 1999 Forwards SE Re Proposed Alternatives to ASME Section XI Requirements for Containment Inservice Insp Program at Plant,Units 2 & 3 ML20212A0091999-09-0909 September 1999 Provides Notification That Licenses SOP-11172 & SOP-11321, for SO Muntzenberger & Rh Wright,Respectively,Are No Longer Necessary as Result of Permanent Reassignment ML20211P2961999-09-0707 September 1999 Provides Authorization to Administer NRC Approved Initial Written Exams to Listed Applicants on 990913 at Peach Bottom Npp,Delta,Pennsylvania ML20211K7031999-08-30030 August 1999 Forwards Response to NRC 990826 RAI Re License Change Application ECR 99-01255,revising TSs 2.1.1.2 & 5.6.5 ML20211E6941999-08-26026 August 1999 Forwards Request for Addl Info Re Min Critical Power Ratio. Response Should Be Submitted within 30 Days of Ltr Receipt ML20211Q4491999-08-25025 August 1999 Responds to Re Changes to PBAPS Physical Security Plan,Safeguards Contingency Plan & Guard Training & Qualification Plan Identified as Revs 13,11 & 9, Respectively.No NRC Approval Is Required,Per 10CFR50.54(p) ML20211E9191999-08-24024 August 1999 Forwards fitness-for-duty Program Performance Data for Jan-June 1999 for PBAPS & LGS IAW 10CFR26.71(d).Data Includes Listed Info ML20211D5421999-08-23023 August 1999 Forwards Amends 228 & 231 to Licenses DPR-44 & DPR-56, Respectively & Se.Amends Revise TSs to Correct Typographical & Editorial Errors Introduced in TSs by Previous Amends ML20211A9721999-08-20020 August 1999 Forwards Request for Addl Info Re Third 10-year Interval Inservice (ISI) Insp Program Plan for Plant,Units 2 & 3 ML20210T5451999-08-12012 August 1999 Forwards Copy of Environ Assessment & Findings of No Significant Impact Re Licensee Request for Amends to Plant. Amends Consist of Changes to TS to Correct Typos & Editorial Errors Introduced in TS by Previous Amends ML20210P8321999-08-11011 August 1999 Responds to NRC 990715 Telcon Re Util 990217 Submittal of Proposed Alternatives to Requirements of 10CFR50.55a(g)(6)(ii)(B)(1) Re Containment Inservice Insp Program ML20210P8151999-08-11011 August 1999 Forwards Final Pages for Pbaps,Unit 2 & 3 OLs Re License Change Application ECR 99-01497,which Reflects Change in Corporate Structure at Pse&G ML20211B6521999-08-10010 August 1999 Informs That Dp Lewis,License SOP-11247,has Been Permanently Reassigned & No Longer Requires License,Per 10CFR50.74.Util Requests That Subject Individual Be Removed from List of License Holders ML20210P1561999-08-10010 August 1999 Submits Response to Requests for Addl Info Re GL 92-01,rev 1,Suppl 1, Rv Structural Integrity, for Pbap,Units 1 & 2. NRC Will Assume That Data Entered Into Rvid Are Acceptable for Plants,If Staff Does Not Receive Comments by 990901 ML20211B7881999-08-10010 August 1999 Transmits Summary of Two Meetings with Risk-Informed TS Task Force in Rockville,Md on 990514 & 0714 ML20210N7831999-08-0909 August 1999 Forwards Copy of Notice of Consideration of Issuance of Amends to Fols,Proposed NSHC Determination & Opportunity for Hearing, Re 990806 Request for License Amends.Amends Incorporate Note Into PBAPS TS to Permit One Time Exemption ML20210P0801999-08-0404 August 1999 Forwards Initial Exam Repts 50-277/99-301 & 50-278/99-301 on 990702-14 (Administration) & 990715-22 (Grading).Six of Limited SRO Applicants Passed All Portion of Exam ML20210M7571999-08-0404 August 1999 Forwards Response to Requesting Addl Info Re Status of Decommissioning Funding for Lgs,Pbaps & Sngs. Attachment Provides Restatement of Questions Followed by Response NUREG-1092, Informs J Armstrong of Individual Exam Results for Applicants on Initial Exam Conducted on 990702 & 990712-14 at Facility.All Six Individuals Who Were Administered Exam, Passed Exam.Without Encls1999-08-0303 August 1999 Informs J Armstrong of Individual Exam Results for Applicants on Initial Exam Conducted on 990702 & 990712-14 at Facility.All Six Individuals Who Were Administered Exam, Passed Exam.Without Encls ML20210J0161999-07-30030 July 1999 Forwards Copy of Notice of Consideration of Approval of Transfer of FOL & Issuance of Conforming Amends Re 990723 Application ML20210H5341999-07-27027 July 1999 Forwards Insp Repts 50-277/99-05 & 50-278/99-05 on 990518- 0628.NRC Determined That Two Severity Level IV Violations of NRC Requirements Occurred & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20210F3731999-07-23023 July 1999 Submits Confirmation That,Iaw 10CFR50.80,PSE&G Is Requesting NRC Approval of Transfer of Ownership Interests in PBAPS, Units to New Affiliated Nuclear Generating Company,Pseg Nuclear LLC ML20210E6211999-07-22022 July 1999 Submits Rev to non-limiting Licensing Basis LOCA Peak Clad Temps (Pcts) for Limerick Generating Station (Lgs),Units 1 & 2 & Pbaps,Units 2 & 3 ML20210E5811999-07-21021 July 1999 Forwards Final Tech Specs Pages for License Change Application.Proposed Change Will Revise Tech Specs to Delete Requirement for Refuel Platform Fuel Grapple Fully Retracted Position Interlock Currently Required by TS ML20216D8041999-07-19019 July 1999 Submits Summary of Final PECO Nuclear Actions Taken to Resolve Scram Solenoid Pilot Valve Issues Identified in Info Notice 96-007 1999-09-09
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20217M6631999-10-19019 October 1999 Forwards Insp Rept 50-277/99-07 & 50-278/99-07 on 990920.No Violations Noted ML20217K9241999-10-14014 October 1999 Forwards Amend 234 to License DPR-56 & Se.Amend Consists of Changes to TS in Response to Application & Suppls ,1001 & 06,which Will Support PBAPS Mod P00507,which Will Install Digital Pr Neutron Mining Sys ML20217F7391999-10-14014 October 1999 Requests Addl Info Re Peach Bottom Atomic Power Station Units 2 & 3 Appendix R Exemption Requests ML20217F6841999-10-13013 October 1999 Forwards Senior Reactor Operator Initial Exam Repts 50-277/99-302(OL) & 50-278/99-302(OL) Conducted on 990913- 16.All Applicants Passed All Portions of Exam ML20217B4051999-10-0505 October 1999 Forwards Amend 233 to License DPR-56 & Safety Evaluation. Amend Changes Minimum Critical Power Ratio Safety Limit & Approved Methodologies Referenced in Core Operating Limits Report ML20217B3181999-10-0505 October 1999 Advises That Info Submitted in 990712 Application,Which Contained Attachment Entitled, Addl Info Re Cycle Spec SLMCPR for Peach Bottom 3 Cycle 13,dtd 990609, with Affidavit,Will Be Withheld from Public Disclosure ML20212J6851999-09-29029 September 1999 Informs of Completion of mid-cycle PPR of Peach Bottom Atomic Power Station on 990913.No Areas Identified in Which Licensee Performance Warranted Addl New Insps Beyond Core Insp Program.Historical Listing of Plant Issues Encl ML20212J5751999-09-28028 September 1999 Informs of Individual Exam Results for Applicants on Initial Exam Conducted on 990913-16 at Licensee Facility.Without Encls ML20216J0191999-09-27027 September 1999 Forwards Request for Addl Info Re Util 990301 Request to Support Installation of Digital Power Range Neutron Monitoring Sys & Incorporation of long-term thermal- Hydraulic Stability Solution Hardware,For Plant ML20216H6751999-09-24024 September 1999 Forwards Amends 229 & 232 to Licenses DPR-44 & DPR-56, Respectively & Ser.Amends Will Delete SR Associated Only with Refueling Platform Fuel Grapple Fully Retracted Position Interlock Input,Currently Required by SR 3.9.1.1 ML20216H6451999-09-24024 September 1999 Forwards Notice of Withdrawal of Util 990806 Application for Amends to Fols DPR-44 & DPR-56.Proposed Change Would Have Involved Temporary Change to Increase Limit for Average Water Temp of Normal Heat Sink ML20212E8661999-09-22022 September 1999 Discusses GL 98-01 Y2K Readiness of Computer Sys at NPPs & Supplement 1 & PECO Response for PBAPS Dtd 990630. Understands That at Least One Sys or Component Listed May Have Potential to Cause Transient During Y2K Transition ML20212D1191999-09-17017 September 1999 Forwards SE Re Proposed Alternatives to ASME Section XI Requirements for Containment Inservice Insp Program at Plant,Units 2 & 3 ML20211P2961999-09-0707 September 1999 Provides Authorization to Administer NRC Approved Initial Written Exams to Listed Applicants on 990913 at Peach Bottom Npp,Delta,Pennsylvania ML20211E6941999-08-26026 August 1999 Forwards Request for Addl Info Re Min Critical Power Ratio. Response Should Be Submitted within 30 Days of Ltr Receipt ML20211Q4491999-08-25025 August 1999 Responds to Re Changes to PBAPS Physical Security Plan,Safeguards Contingency Plan & Guard Training & Qualification Plan Identified as Revs 13,11 & 9, Respectively.No NRC Approval Is Required,Per 10CFR50.54(p) ML20211D5421999-08-23023 August 1999 Forwards Amends 228 & 231 to Licenses DPR-44 & DPR-56, Respectively & Se.Amends Revise TSs to Correct Typographical & Editorial Errors Introduced in TSs by Previous Amends ML20211A9721999-08-20020 August 1999 Forwards Request for Addl Info Re Third 10-year Interval Inservice (ISI) Insp Program Plan for Plant,Units 2 & 3 ML20210T5451999-08-12012 August 1999 Forwards Copy of Environ Assessment & Findings of No Significant Impact Re Licensee Request for Amends to Plant. Amends Consist of Changes to TS to Correct Typos & Editorial Errors Introduced in TS by Previous Amends ML20210P1561999-08-10010 August 1999 Submits Response to Requests for Addl Info Re GL 92-01,rev 1,Suppl 1, Rv Structural Integrity, for Pbap,Units 1 & 2. NRC Will Assume That Data Entered Into Rvid Are Acceptable for Plants,If Staff Does Not Receive Comments by 990901 ML20211B7881999-08-10010 August 1999 Transmits Summary of Two Meetings with Risk-Informed TS Task Force in Rockville,Md on 990514 & 0714 ML20210N7831999-08-0909 August 1999 Forwards Copy of Notice of Consideration of Issuance of Amends to Fols,Proposed NSHC Determination & Opportunity for Hearing, Re 990806 Request for License Amends.Amends Incorporate Note Into PBAPS TS to Permit One Time Exemption ML20210P0801999-08-0404 August 1999 Forwards Initial Exam Repts 50-277/99-301 & 50-278/99-301 on 990702-14 (Administration) & 990715-22 (Grading).Six of Limited SRO Applicants Passed All Portion of Exam NUREG-1092, Informs J Armstrong of Individual Exam Results for Applicants on Initial Exam Conducted on 990702 & 990712-14 at Facility.All Six Individuals Who Were Administered Exam, Passed Exam.Without Encls1999-08-0303 August 1999 Informs J Armstrong of Individual Exam Results for Applicants on Initial Exam Conducted on 990702 & 990712-14 at Facility.All Six Individuals Who Were Administered Exam, Passed Exam.Without Encls ML20210J0161999-07-30030 July 1999 Forwards Copy of Notice of Consideration of Approval of Transfer of FOL & Issuance of Conforming Amends Re 990723 Application ML20210H5341999-07-27027 July 1999 Forwards Insp Repts 50-277/99-05 & 50-278/99-05 on 990518- 0628.NRC Determined That Two Severity Level IV Violations of NRC Requirements Occurred & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20209F2461999-07-15015 July 1999 Request Addl Info Re Relief Request CRR-01 Through CRR-11 for Plant,Units 2 & 3.RAI Undtd ML20196J6301999-07-0101 July 1999 Requests Addl Info Re Status of Decommissioning Funding for Limerick Generating Station,Units 1 & 2,Peach Bottom Atomic Power Station,Units 1,2 & 3 & Salem Nuclear Generating Station,Units 1 & 2 ML20212J0541999-06-17017 June 1999 Responds to Requesting That NRC Staff ...Allow BWR Plants Identified to Defer Weld Overlay Exams Until March 2001 or Until Completion of NRC Staff Review & Approval of Proposed Generic Rept,Whichever Comes First ML20195K2251999-06-11011 June 1999 Forwards Insp Repts 50-277/99-04 & 50-278/99-04 on 990405- 0517.One Severity Level IV Violation of NRC Requirements Identified & Being Treated as non-cited Violation,Consistent with App C of Enforcement Policy ML20207G2051999-06-0707 June 1999 Informs of Reorganization in NRR Ofc,Effective 990328. Reorganization Chart Encl ML20207B8381999-05-24024 May 1999 Forwards FEMA Final Exercise Rept for Peach Bottom Atomic Power Station Plume Exposure Pathway Exercise Conducted on 981117.One Deficiency & 27 Areas Requiring Corrective Actions Identified ML20207A0541999-05-17017 May 1999 Acks 990512 & 14 Telcons with Licensee Re Util Request That Rev 8 of NUREG-1021, OL Exam Stds for Power Reactors Be Followed Rather than Interim Rev 8 for Exams in Sept 1999. Request Acceptable ML20206K2231999-05-0606 May 1999 Informs That Author Authorized to Exercise Discretion & Not Issue NOV or Civil Penalty Re Violation Util Identified Involving Unit 2 Rod Block Monitoring Sys Being Inoperable for 29 of 185 Control Rods ML20206K1921999-05-0606 May 1999 Discusses 990503 Telcon Between J Williams & B Bierly Re Arrangements Made for Administration of Licensing Exam at Peach Bottom Facility During Week of 990913 ML20206A1511999-04-20020 April 1999 Forwards Request for Addl Info Re Util 980514 Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-operated Valves. Response Requested within 90 Days of Ltr Receipt ML20206A2801999-04-20020 April 1999 Discusses Proposed Changes Submitted by PECO on 980416, 981116,990122 & 990211 to Plant Emergency Action Levels (Eals).Eals Incorporate Guidance in NUMARC/NESP-007,Rev 2. SE Supporting Proposed EALs Encl ML20205N1961999-04-0909 April 1999 Informs of NRC Planned Insp Effort Resulting from Peach Bottom Atomic Power Station Plant Performance Review Conducted for Period April 1998 to 990115.Historical Listing of Plant Issues & Insp Plans Through Jan 2000 Encl ML20205K7321999-04-0707 April 1999 Forwards Amends 227 & 230 to FOLs DPR-44 & DPR-56, Respectively.Amends Consist of Changes to TS SRs Re Secondary Containment Doors,In Response to 980204 Application,As Revised by ML20205J0531999-04-0101 April 1999 Ack Receipt of 990326 Notice of Enforcement Discretion Request & Documents Resolution.Notes That E3 EDG Returned to Operable Status on 990327,within 14 Day Completion Time Required by Ts.No Enforcement Discretion Necessary ML20205B9891999-03-25025 March 1999 Forwards Insp Repts 50-277/99-01 & 50-278/99-01 on 990105-0215.Violation Noted & Being Treated as non-cited Violation.Nrc Concluded That Staff Maintained Effective Influents Controls & Effective Security Program ML20203H8101999-02-12012 February 1999 Discusses Completion of Licensing Action for Bulletin 96-003, Potential Plugging of ECC Suction Strainers by Debris in BWR, ML20203H7751999-02-12012 February 1999 Discusses Completion of Licensing Action for GL 92-08, Thermo-Lag 330-1 Fire Barriers, for Peach Bottom Atomic Power Station ML20202J5251999-02-0101 February 1999 Forwards Insp Repts 50-277/98-11 & 50-278/98-11 on 981110- 990104 & Notice of Violation Re Failure to Complete Facility Licensed Operator Requalification Program ML20202J8081999-02-0101 February 1999 Forwards Insp Repts 50-277/98-09 & 50-278/98-09 & Notice of Violation.Insp Focused on Reactor Core Isolation Cooling & 4kV Electrical Distribution Sys Operation Under Normal & Emergency Operation Conditions ML20203A6111999-01-22022 January 1999 Confirms 990115 Conversation Between Mj Williams & P Orphanos Re Arrangements Made for Administration of Licensing Exam at Limerrick Generating Station & Peach Bottom Atomic Power Station During Week of 990705 ML20198P1761998-12-30030 December 1998 Forwards from R Calvan Transmitting FEMA Rept for Spring 1998 Peach Bottom Atomic Power Station Ingestion Exposure Pathway Exercise.No Deficiencies Identified During Exercise Conducted on 980407-09,980506 & 980519-21 ML20198K5911998-12-24024 December 1998 Forwards Emergency Response Data Sys Implementation Documents Which Include Data Point Library Updates for Fermi (Number 268),Peach Bottom (Number 269) & Beaver Valley (Number 270).Without Encls IR 05000277/19980081998-12-21021 December 1998 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-277/98-08 & 50-278/98-08 Issued on 981028 ML20198D4071998-12-16016 December 1998 Forwards Emergency Preparedness Insp Repts 50-277/98-12 & 50-278/98-12 on 981116-19.No Exercise Weaknesses,Safety Concerns or Violations of NRC Requirements Identified 1999-09-07
[Table view] |
Text
_ _ _ _ _ _ _ .-_
8 May 28, 1998 Mr. Garrett D. Edwards Director- Licensing, MC 62A-1 PECO Energy Company Nuclear Group Headquarters Correspondence Control Desk P.O. Box No. 195 Wayne, PA 19085-0195
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION (RAl) FOR PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3, GENERIC LETTER (GL) 96-06 (TAC NOS. M96848 AND M96849)
Dear Mr. Edwards:
GL 96-06, " Assurance of Equipment Operability and Containment integrity Duiing Design Basis Accident Conditions," dated September 30,1996, included a request for licensees to evaluate potential waterhammer and two-phase flow conditions in cooling water systems that serve containment air coolers. By letters dated January 28 and February 10,1997, PECO Energy Company (the licensee) provided its assessment of water hammer and two-phase flow conditions for cooling water systems that serve containment air coolers at Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3.
The Commission's technical staff, in reviewing the licensee's responses, has concluded that additional information as outlined in the enclosure is required to facilitate closure of the issues .
raised in GL 96 06.
We request that the licensee provide its response to the enclosed RAI within 45 days from the date of the receipt of this letter to support a timely completion of the staffs actions on the issues raised by GL 96-06.
Sincerely,
/S/
Mohan C. Thadani, Senior Project Manager i Project Directorate 1-2 !
Division of Reactor Projects -1/11 Office of Nuclear Reactor Regulation Docket Nos. 50-277 l and 50-278 I
Enclosure:
As stated , g
'f cc w/ encl: See next page i
DISTRIBUTION l Docket File RCapra ACRS PUBLIC MO'Brien CAnderson, RGN l PDl-2 Reading /MThadani JZwolinski /1/ OGC OFFICE MM PDl4/ LAG PDl-2/D NAME [lbhadani:mw MO'BrhiIrh RCapra W DATE fI /2h8 $/71/98 5 /28/98 OFFICIAL RECORD COPY ,a
~U DOCUMENT NAME: A:bl96-06.RAI .
W pb)UU P JP ? pbqueNID 9906020329 990529 PDR ADOCK 05000277 t_ _
[* %
} ,y 1 UNITED STATE 8 s* 1' NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 3000641001 May 28,1998 Mr. Garrett D. Edwards Director- Lloonsing, MC 62A-1 PECO Energy Company Nuclear Group Headquarters Correspondence Control Desk P.O. Box No.195 Wayne, PA 19085 0195
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION (RAl) FOR PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3, GENERIC LETTER (GL) 96-06 (TAC NOS. M96848 AND M96849)
Dear Mr. Edwards:
GL 96-06, " Assurance of Equipment Operability and Containment Integrity During Design Basis Accident Conditions," dated September 30,1996, included a request for licensees to evaluate potential waterhammer and two-phase flow conditions in cooling water systems that serve containment air coolers. By letters dated January 28 and February 10,1997, PECO Energy Company (the licensee) provided its assessment of water hammer and two-phase flow conditions for cooling water systems that serve containment air coolers at Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3.
The Commission's technical staff, in reviewing the licensee's responses, has concluded that additional information as outlined in the enclosure is required to facilitate closure of the issues raised in GL 96-06.
We request that the licensee provide its response to the enclosed RAI within 45 days from the date of the receipt of this letter to support a timely completion of the staff's actions on the issues raised by GL 96-06.
Sincerely, ha ro nager Project Directorate 1-2 Division of Reactor Projects - t/il Office of Nuclear Reactor Regulation
! Docket Nos. 50-277 and 50-278
Enclosure:
As stated cc w/ encl: See next page i
. I
= i
? i i !
Mr. Garrett D. Edwards Peach Bottom Atomic Power Station, !
PECO Energy Company Units 2 ard 3 oc:
J. W. Durham, Sr., Esquire Chief-Division of Nuclear Safety
, Sr. V.P. & General Counsel PA Dept. of PECO Energy Company Environmental Resources 2301 Market Street,626-1 P.O. Box 6469 Philadelphia, PA 19101 Harrisburg, PA 17105 846g PECO Energy Company ATTN: Mr. T. N. Mitchell, Vice President Board of Supervisors i I
Peach Bottom Atomic Power Station Peach Bottom Township 1848 Lay Road R.D.#1 )
Delta, PA 17314 Delta, PA 17314 ;
PECO Energy Company Public Service Commission of Maryland ATTN: Regulatory Engineer, A4-5S Engineering Division Peach Bottom Atomic Power Station Chief Engineer 1848 Lay Road 6 St. Paul Centre Delta, PA 17314 Baltimore, MD 21202-6806 {
Resident inspector Mr. Richard McLean j U.S. Nuclear Regulatory Commission Power Plant and Environmental l Peach Bottom Atomic Power Station Review Division !
P.O. Box 399 Department of Natural Resources Delta, PA 17314 B-3, Tawes State Office Building Annapolis, MD 21401 i Regional Administrator, Region i U.S. Nuclear Regulatory Commission Dr. Judith Johnsrud 475 Allendale Road National Energy Committee -
King of Prussia, PA 19406 Sierra Club 433 Orlando Avenue Mr. Roland Fletcher State College, PA 16803 Department of Environment i 201 West Preston Street Manager-Financial Control & Co-Owner i Baltimore, MD 21201 Affairs !
Public Service Electric and Gas A. F. Kirtiy, lll Company Extemal Operations - Nuclear P.O. Box 236 !
Hancocks Bridge, NJ 08038-0236 Delmarva Power & Light Company P.O. Box 231 Wilmington, DE 19899 Manager-Peach Bottom Licensing PECO Energy Company PECO Energy Company Nuclear Group Headquarters j Plant Manager Conospondence Control Desk l Peach Bottom Atomic Power Station P.O. Box No.19:i 1848 Lay Road Wayne, PA 19087-0195 Delta, PA 17314 i
?
i REQUEST FOR ADDITIONAL INFORMATION FOR RESOLUTION OF GL 96-06 ISSUES AT PEACH BOTTOM 2 & 3 (TAC NOS M96848 AND M96849)
Generic Letter (GL) 96-06, " Assurance of Equipment Operability and Containment integrity During Design-Basis Accident Conditions," dated September 30,1996, included a request for licensees to evaluate cooling water systems that serve containment air coolers to assure that I they are not vulnerable to waterhammer and two phase flow conditions. PECO Energy Company (the licensee) provided its assessment of the waterhammer and two-phase flow issues for Peach Bottom 2 & 3 in letters dated January 28, and February 10,1997. The licensee indicated that ,
cooling water to the containment air coolers is provided by the non-safety related Drywell Chilled )
Water-System (DCWS), a closed-loop system, or (during a loss of power), by the reactor building closed-cooling-water (RBCCW) system. The licensee determined thet the elevated head tank in the RBCCW system and pressure in the DCWS expansion tank would prevent the formation of steam bubbles such that waterhammer is not a possibility. Also, since the containment air coolers do not perform a safety-related heat removal function, the licensee concluded that two-phase flow was not a concem. In order to assess the licensee's resolution of these issues, the following additional information is requested:
- 1. Discuss specific system parameter requirements that must be maintained to assure that waterhammer will not occur (e.g., RBCCW head tank and DCWS expansion tank level, temperature, pressure), and state the minimum margin to boiling that exists, including ,
consideration of measurement and analytical uncertainties. Describe and justify reliance of any non-safety-related instrumentation and controls for assuring that waterhammer will not occur, and explain why it would not be appropriate to establish Technical Specification requirements for maintaining these parameters.
- 2. The GL' 96-06 response indicated that for small break LOCAs, operators will re-establish drywell cooling using existing emergency procedures before containment temperatures reach a point where steam generation could occur. Describe in detail the actions required by EOPs for this situation, operator response and the timing involved, and the minimum margin to boiling that will exist, including consideration of inherent uncertainties.
- 3. In order to more fully address the two phase flow concem, provide the following information:
- a. Provide a detailed description of the " worst case" scenario for two-phase flow, l taking into consideration the complete range of event possibilities, system l configurations, and parameters. For example, temperatures, pressures, flow l rates, load combinations, and pctential component failures should be considered.
l Additional examples include:
. the consequences of steam formation, transport, and accumulation;
. cavitation, resonance, and fatigue effects; and 1
. erosion considerations.
Enclosure
6
{
2-Licensees may find NUREG/CR-6031, " Cavitation Guide for Control Valves,"
helpfulin addressing some aspects of the two-phase flow analyses. (Note: it is important for licensees to realize that in addition to heat transfer considerations,
' two-phase flow also involves structural and system integrity concems that must be addressed).
I
- b. Identify any computer codes that were used in the two-phase flow analysis and describe the methods used to benchmark the codes for the specific loading conditions involved (see Standard Review Plan Section 3.g.1).
- c. Describe and justify all assumptions and input parameters (including those used in any computer codes), and explain why the values selected give conservative results. Also, provide justification for omitting any effects that may be relevant to the analysis (e.g., flow-induced vibration, erosion).
l d. Determine the uncertainty in the two-phase flow analysis, explain hcw the uncertainty was determined, and how it was accounted for in the analysis to assure conservative results.
- e. Confirm that the two-phase flow loading conditions do not exceed any design specifications or recommended service conditions for the piping system and components, including those stated by equipment vendors; and confirm that the system will continue to perform its design-basis functior.s as assumed in the safety analysis report for the facility, and that the containment isolation valves will remain operable.
- 4. Confirm that the waterhammer and two-phase flow analyses included a complete failure modes and effects analysis (FMEA) for all components (including electrical and pneumatic failures) that could impact performance of the cooling water system and confirm that the FMEA is documented and available for review, or explain why a complete and fully documented FMEA was not performed.
- 5. Explain and justify all uses of "engineeririg judgement."
- 6. Provide a simplified diagram of the affected systems, showing major components, active components, relative elevations, lengths of piping runs, and the location of any offices and flow restrictions.
- 7. Describe in detail any modifications that have been made (or will be made) to system design or operating requirements to resolve the waterhammer and two-phase flow issues.
6 1