Advises That Info Submitted in 990712 Application,Which Contained Attachment Entitled, Addl Info Re Cycle Spec SLMCPR for Peach Bottom 3 Cycle 13,dtd 990609, with Affidavit,Will Be Withheld from Public Disclosure
ML20217B318
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 10/05/1999
From: Buckley B
NRC (Affiliation Not Assigned)
To: Kipp C
GENERAL ELECTRIC CO.
References
TAC-MA6053, NUDOCS 9910120206
Download: ML20217B318 (4)


Text

m y -

'% y "% une s s:U D I Al t:D

l j 2

NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 2065H001 October 5, 1999 Mr. Craig P. Kipp General Manager-Nuclear Fuel General Electric Company P.O. Box 780, M/C A20 Wilmington, NC 28402

SUBJECT:

REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE, PEACH BOTTOM ATOMIC POWER STATION, UNIT 3 (TAC NOS. MA6053)

Dear Mr. Kipp:

i PECO Energy Company's July 12,1999, application contained an attachment entitled, J

" Additional Information Regarding the Cycle Specificatica SLMCPR for Peach Bottom 3 Cycle 13, dated June 9,1999," which included an affidavit requesting that the attachment be withheld from public disclosure pursuant to 10 CFR 2.790. A nonproprietary version was submitted for ,

placement in the Nuclear Regulatory Commission's (NRC) public document room. l The affidavit stated that the submitted proprietary information should be considered exempt from mandatory public disclosure for the following reasons:

l i 1. . information that discioses a process, method, or apparatus, including supporting L ' data and analyses, where prevention of its use by General Electric's competitors without license from General Electric constitutes a competitive economic l advantage over other companies. '

2. Information which, if used by a competitor, would reduce his expenditure of l resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product.

t

3. The information identified is classified as proprietary because it contains details

! of GE's Safety Limit MCPR analysis and the corresponding results which GE has applied to this specific plant and cycle's actual core design with GE's fuel.  ;

The development of the methods used in these analys[e)s, along with the testing, development and approval of the supporting critical power correlation was achieved at a significant cost, on the order of several million dollars, to GE.

We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.790 and, on the basis of your statements, have determined that the submitted information 9910120206 991005 PDR ADOCK 05000278 P PDR 4

0 4

C. Kipp sought to be withheld contains proprietary commercialinformation and should be withheld from public disclosure.

Therefore, the version of the submitted information marked as proprietary will be withheld from pubiic disclosure pursuant to 10 CFR 2.790(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.

Withholding frorn public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.

If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example,if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination l' adverse to the above, you will be notified in advance of any public disclosure.

If you have any questions regarding this matter, I may be reached at (301) 415-1483.

Sincerely, i C;,)Lds-w C LUM Bartholomew C. Buckley, Sr. Project Manager, Section 2

, Project Directorate l l Division of Licensing Project Management Office of Nuclear Reactor Regulation l

Docket No. 50-278 i cc: See next page l

I l

F, \

October 5, 1999 C. Kipp

~

J l

sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.

l Therefore, the version of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.790(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.

Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copNs of this information to our consultants working in this area. We will, of course, ensure that the l consultants have signed the appropriate agreements for handling proprietary information.

If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of information Act request includes your i,1 formation. In all review situations, if the NRC makes a determination j adverse to the above, you will be notified in advance of any public disclosure.  !

If you have any questions regarding this matter, I may be reached at (301) 415-1483.

Sincerely, l

Original signed by: l Bartholomew C. Buckley, Sr. Project Manager, Section 2 Project Directorate l Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-278 lI cc: See next page DISTRIBUTION:

Docket File MO'Brien MOpendek, RGN-l BBuckley PUBLIC MFerdas PDI-2 Reading MPSiemien, Ocyt.

JClifford EAdensam(Em;il)

DOCUMENT NAME: G:\PDI-2\PeachBottom\PRC6053.WPD To receive a copy of this document, indicate la the box: "C" = Copy without attachment / enclosure "E" = Copy with attachment / enclosure "N" = No copy, f ,

OFFICE PM:PDI 2 Qfd l E LA:PDIh?/// / // l SC:SRXB/BC ,9 ,// l OGC ,, [ l/ , SC:/by2 l NAME B8ucktey _1/ ^1T' M0'Sti46 6 _ JWermi f 1 M V// M , MP Siem- en ( 'l M JCLIffgrd_

DATE 'IjZy'lQ 4 (d /m j//}i/ '//fLYf'{ Y Q D; Q9 /d/ t//h gg '[/ '/ ' ' Official VecoM Copy V ' '8 I ,'. I O d .j

., i o -

,, I pn i C. Kipp sought to be withheld contains proprietary commercial information and should be withheld from ,

public disclosure.  !

Therefore, the version of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.790(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.

Withholding from public inspection shall not affect the right, if any, of persons properly and

' directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.

If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act I request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure. ,

i If you have any questions regarding this matter, I may be reached at (301) 415-1483. j l

Sincerely, j 1

Original signed by:  ;

i Bartholomew C. Buckley, Sr. Project Manager, Section 2 Project Directorate i Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50,-278 cc: See next page DISTRIBUTION:

Docket File MO 3rien MOpendek, RGN-l BBuckley PUBLIC MFerdas PDI-2 Reading MPSiemien, OC-c_

JClifford EAdensam(Email)

DOCUMENT NAME
G:\PDI-2\PeachBottom\ PRO 6053.WPD
To receive a copy of this document, Indicate in the box: "C" = Copy without attachment / enclosure "E" = Copy l with attachment / enclosure "N" = No copy + l ,

OFFIC8 PM:PDI 2 TQf"d 1 E LA:PDIM/ // // l/ SC:SRXB/BC,-y ,f/] OGC ,, M l/ . SC:/%pf l NAME BBuckley _I/~ T , M0'8df6 @ _ JWermif tzF#//dt, MP Stem en Vrj / JCtTfford_

our '/ /W'l 9 '1 a /,r///F/ WiV/Y Y G MI 19 ///t// M

' 'i

'/' '/ ' ' Official Wecor% Copy U

( f f, ,k.-j l

[