Forwards Summary of Decommissioning Insp Plan for Remainder of CY98 for Plant,Units 1 & 2.Plan Will Be Updated Approx Twice Each Yr & May Be Revised at Any Time Based on Future Insp Findings,Events & Source Availability
ML20236M367
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 07/08/1998
From: Jorgensen B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Kingsley O
COMMONWEALTH EDISON CO.
References
NUDOCS 9807140044
Download: ML20236M367 (6)


Text

_ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ . -

i.

l

[ July 8, 1998 l

l l

)

l l Mr. Oliver D. Kingsley President, Nuclear Generation Group l

Commonwealth Edison Company

ATTN
Regulatory Services l Executive Towers West lll 1400 Opus Place, Suite 500 Downers Grove, IL 60515 .)

SUBJECT:

DECOMMISSIONING INSPECTION PLAN FOR ZION UNITS 1 AND 2

Dear Mr. Kingsley:

Enclosed for your information is a summary of our decommissioning inspection plan for the ,

I remainder of Calendar Year 1998 for the Zion Nuclear Station, Units 1 and 2. This plan will be {

updated approximately twice each year, and may be revised at any time based on future inspection findings, events, resource availability, etc. We will promptly inform you of any major changes to the enclosed inspection plan.

l- In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, and  !

i the enclosure will be placed in the NRC Public Document Room. If you have any questions, please contact Dr. John House at (630) 829-9824 or myself at (630) 829-9615.

Sincerely, Original Signed by l

! l Bruce L. Jorgensen, Chief Decommissioning Branch Docket Nos. 50-295; 50-304 License Nos. DPR-39; DPR-48

Enclosure:

As stated i

See Attached Distribution i

DOCUMENT NAME: G:\SEC\ ZION.MIP To receive e copy of tMe document, Indicate in the bos:"C" = Copy without enetosure "E"- Copy with enclosure"N"= No copy OFFICE Rll! ,g,, f$ Rlli n l G' l NAME House:ib M JorgeWen DATE 06A0/98 ~ 4BMV93 OFFICIAL RECORD COPY l l} O y 3,3 9807140044 980708 I0 /

PDR ADOCK 05000295 0 .. PDR m l

i _ _ -_ _ - - - _ _ _ _ _ - _ _ _ - - _ - _ - - _ -

r_ . _ , _ _ - _ _ _ _ _ _ _ _ . . - _ _ _ _ _ _ _ _ _ __-__

1 I O.' Kingsley l cc w/ encl: M. Wallace, Senior Vice President

! D. Helwig, Senior Vice President  !

l G. Stanley, PWR Vice President J. Perry, BWR Vice President D. Farrar, Regulatory Services Manager .

l. Johnson, Licensing Director l DCD - Licensing J. Brons, Site Vice President R. Starkey, Plant General Manager R. Godley, Regulatory Assurance Supervisor R. Hubbard N. Schloss, Economist Office of the Attorney General K. Nollenberger, County Administrator

' Mayor, City of Zion State Llaison Officer State Liaison Officer, Wisconsin ,

l Chairman, Illinois Commerce Commission i.

Distribution _D:

Docket File w/ cl PUBLIC4E w/enci Rlli PRR w/ encl i S. Weiss, NRR w/enci l M. Masnik, NRR w/enci SAR, NRR (e-mail)

LPM, NRR w/enci u C. J. Paperiello, Ritt w/enci J. L. Caldwell, Rill w/enci C. D. Pederson, Rill w/enci G. E. Grant, Rill w/enci l SRI, Zion w/enci

! TSS w/enci Greens w/o enci i

l l

i

  • L.

V MASTER INSPECTION PLAN Zion Nucisar Pow:r Plant Facility Manaaement and Control IP No, INSPECTION PROCEDURE TITLE Planned Date CORE INSPECTION 36801 Organization, Management & Cost Controls Ongoing-2 hr/mo at Permanently Shut Down Reactors 37801 Safety Reviews, Design Changes, and Mods Ongoing-1 hr/mo at Permanently Shut Down Reactors 40801 Self-Assessment, Auditing, Corrective Action Ongoing-2 hr/mo 71801 Decommissioning Performance and Status Review Sept 98 at Permanently Shut Down Reactors INITIATIVE INSPECTION 35701 Quality Assurance - Annual Review 36800 Organization 39701 Records Program 40500 Eval. Licensee Self-Assessment Capability 42700 Plant Procedures 90712 in-office Review, Written Reports of When Required Non-routine Events At Power Reactor Facilities

- 90713 In-Office Review, Periodic & Special Reports 90714 Non-routine Reporting Program 92700 Onsite Follow-up, Written Reports of Upon Receipt Non-routine Events At Power Reactor Facilities 92701 Follow-up Ongoing-10 hr/mo 92702 Follow-up Corrective Actions, Violations When Required

& Deviations 93001 OSHA Interface Activities When Required 93702 Prompt Onsite Response to Events When Required at Power Reactors issue Date: 06/26/98 2561 Appendix A I

1 i

I

MASTER INSPECTION PLAN Zion Nucl tr Powar Plant Decommissioning Support Activities IP No. INSPECTION PROCEDURE TITLE Planned Date CORE INSPECTION 62801 Maintenance and Surveillance at Permanently Ongoing-2 hr/mo Shut Down Reactors 71714 Cold Weather Preparations Oct 98 81XXX Physical Security Assessment at Permanently TBD Shut Down Reactors 81001* Independent Spent Fuel Storage Installations NA INITIATIVE INSPECTION 37700 Design Changes and Modifications July 98 Then bi-monthly 37001 Facility Modifications Nov 98 41500 Training and Qualification Effectiveness When Required 61726 Surveillance Observation Ongoing-2 hr/mo 62706 Maintenance Rule TBD 62707 Maintenance Observation Ongoing-4 hr/mo 71707 Operational Safety Verification Ongoing-4 hr/mo 81502 Fitness For Duty When Required 85102 Material Control and Accounting - Reactors When Required l

  • only if there is an ISFSI 1

1 issue Date 06/26/98 2561 Appendix A

MASTER INSPECTION PLAN Zion Nucirr Pow;r Pl nt Spent Fuel Safety IP No. INSPECTION PROCEDURE TITLE Planned Date CORE INSPECTION 60801 Spent Fuel Pool Safety at Permanently Shut Ongoing-2 hr/mo Down Reactors 60705* Preparation for Reactor Fuel Handling When Required 60710* Fuel Handling Activities When Required 60851* Design Control of ISFSI Components NA 60852* ISFSI Component Fabrication by Outside NA Fabricators -

60853* Onsite Fabrication of Components & During Fab /Const Construction of an ISFSI 60854* Preoperational Testing of an ISFSI NA 60855* Operation of an ISFSI NA 60856* Review of Licensee 72.212(b) Evaluations NA l

lNITIATIVE INSPECTION 86700 Spent Fuel Pool' Activities Ongoing-3 hr/mo

  • inspection will be done only if covered activity takes place during the inspection period I

Issue Date 06/26/98 2561 Appendix A i

t_____________ _ . _ _ . _ . . _ . _ _ _

MASTER INSPECTION PLAN Zion Nucl:ar Power Plant fladioloalcal Safety IP No, INSPECTION PROCEDURE TITLE Planned Date CORE INSPECTION 83750 Occupational Radiation Exposure Monthly 83801 Inspection of Final Surveys at Permanently Shut NA '

Down Reactors .

84750 Radwaste Treatment, Effluent & Environ Monitoring July 98 Then bi-monthly q l

86750 Solid Radwaste Management & Transportation of i Rad Mat'Is using Tl 2515/133, " implementation of When Required j Revised 49 CFR Parts 100-179 and 10 CFR Part 71" i INITIATIVE INSPECTION 80721 Radiological Environmental Monitoring Aug 98 83722 Radiation Protection, Plant Chem and Radwaste: When Required ,

Organization and Management Controls 1 83723 Training and Qualifications: General Employee When Required Training, Radiation Safety, Plant Chemistry, l Radwaste and Transportation 83724 Extemal Occupational Exposure Control When Required and Personal Dosimetry 83725 Intemal Exposure Control and Assessment July 98 83726 Control of Radioactive Materials and Contamination, Aug 98 Surveys and Monitoring 83727 Facilities and Equipment When Required l

. 1 83728 Maintaining Occupational Exposures ALARA July 98 7

83729 Occupational Rad Exposure During Extended June 98 Outages

. 84850 Radioactive Waste Management-Inspection of Waste Generator Requirements of 10 CFR Part 20 When Required and 10 CFR Part 61 i

Issue Date 06/26/98 2561 Appendix A ,

I