ML20236N563

From kanterella
Revision as of 01:15, 21 February 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Change Notice 003 to Rev 7 to Procedure CPP-010, Preparation of Deviation Repts
ML20236N563
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 01/16/1987
From: Zill R
EVALUATION RESEARCH CORP.
To:
Shared Package
ML20236N530 List: ... further results
References
CPP-010-03, CPP-10-3, NUDOCS 8708120014
Download: ML20236N563 (2)


Text

' g .

Paga 1 of 2 l ~ t,. .

l [

Av- EVALUATION RESEARCH CORPORATION fiW*;n9 C iu'd,a ?,7e?'*

dbda4s 1b iw.d K3 C b u",]d?!

d  ;

COMANCHE PEAK RESPONSE TEAM PROJECT PROCEDURE FOR QA/QC ISSUE-SPECIFIC ACTION PLANS CHANGE NOTICE: 003 PROCEDURE NO.: CPP-010 g REVISION NO.: 7 ISSUE DATE: 01/16/87 O PREPARATION OF DEVIATION REPORTS The CPP identified above is hereby changed as shown on the attached page of this notice.

Prepared by: . j# - Date: sp G 7

-y , ,

Approved by: .

On-31teg Representative Date: /-' /I- 77

-(' \ Approved by: .

Date: /!/ af!f/$

QA/QCReviewTeamLeaper / /

B708120014 DR 870731 ADOCK 05000445 PDR

Changs Notics 003.

L

4~ CPP-010-Revision: 07 L

l

,f ^p ks/ 1.

i, Change Section 3 of Change Notice 002..in part'to read: " ... Also For ISAP VII.t. 9 the QA/QC Engineer, after

+

.see paragraph 5.3.1.

obtaining the ISAP Issue Coordinators approval on the validated DR, will make a copy of the valid DR and send the~ copy .by way.of memorandum, to SSEG forfevaluation in accordance with reference 3.1. . The QA/QC Engineer will file the original DR and a copy of the memorandum sent to SSEG in the original VII.a.9 package.

l r

N I

l f

i 4

2

.,