Change Notice 003 to Rev 2 to Procedure CPP-001, Preparation of Project Procedures & Quality Instructions
ML20236N533
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 05/20/1987
From: Hansel J, Zill R
EVALUATION RESEARCH CORP.
To:
Shared Package
ML20236N530 List: ... further results
References
CPP-001-02, CPP-1-2, NUDOCS 8708120002
Download: ML20236N533 (2)


Text

,

'h.

Paga 1 of 2

$1's-EVALUATION RESEARCH CORPORATION

'wI COMANCHE PEAK RESPONSE TEAM PROJECT PROCEDURE FOR QA/QC ISSUE-SPECIFIC ACTION PLANS i

CHANGE NOTICE NO: 003 PROCEDURE NO:

CPP-001 UNCONTROLLED COPY

.Ev1SION NO:

2 ISSUE DATE:

05-21-87 pb PREPARATION OF PROJECT PROCEDURES AND QUALITY INSTRUCTIONS i

The CPP identified above is hereby changed as shown on the attached page of this notice.

l l

Prepared by:

Date: T 5 8 ['] 1 $/rpS7 Approved by:

Date: 8e74-87 Dn-Sifp'QA Representative

}

Approved by:

Q n/

Date:

3 20 87 A/QC Review Tealn Leader

/

/

bG i

\\

1 8708120002 870731 PDR ADOCK 0500 5

I t--

.-----_-__o

i

. p_

Changs.Notica 003' f

CPP-001 Revision 2

'1.

Add the following to Paragraph 5.3.1:

O-

"All 'contro11ed' manual holders are required to return their receipt acknowledgements within two-(2) weeks. FAILURE to respond within the two.(2) week time period will result in removal from

'contro11ed'. distribution and recall of the manual."-

O i

2 g

.-