ML20236N934

From kanterella
Jump to navigation Jump to search
Addendum 2 to Rev 2 to Design Adequacy Procedure DAP-DI-M-001, Mechanical Discipline Walkdown Instruction
ML20236N934
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 01/30/1987
From:
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
Shared Package
ML20236N530 List: ... further results
References
DAP-DI-M-001-AD, DAP-DI-M-1-AD, NUDOCS 8708120158
Download: ML20236N934 (1)


Text

_ _ _

COMANCHE PEAK RESPONSE TEAM DESIGN ADEQUACY PROCEDURE ADDENDUM f

Procedure:

DAP-DI-M-001

'v Revision:

0 Addendem:

2

Title:

MECHANICAL DISCIPLINE WALKDOWN INSTRUCTION PURPOSE' This addendum changes " Attachment I" of Dl-M-001 to " Attachment A" to bring

. this discipline instruction in compliance with DAP-10.

SCOPE Revise Section 3.2.2 (pg. 2) to read:

"The Discipline Coordinator is responsible for opproving the Walkdown Checklist, Attachment A...".

Revise Section 4.1.1, Sentence 2 (pg. 3) to read:

L-

"Walkdown checklists shall be prepared in occordance t

with the format of Attachment A Revise header of Attachment I and lis continuation sheet to read:

" ATTACHMENT A".

INSTRUCTION This addendum _is effective upon opproval and shall remain in effect until opproval of the next revision of DAP-DI M-001.

This addendum shall be securely attached to each controlled copy of DAP.DI-M-001.

L Prepared by:

D E MCD

(-

Date:

1/1.9/87 Reviewed by:

Date:

/hhf?

Approved by IT Date:

/

( bhk i

7 -

my jgu.a.u u".

r. ~ n O

\\

DC-86-365 870B120158 870731 PDR ADOCK 05000445 A.

PDR

_