Text
.=
I.'
Page l' of 2
,y L (my
'd EVALUATION RESEARCH CORPORATION UNCONTROLLED. COPY COMANCHE PEAK RESPONSE TEAM l
PROJECT PROCEDURE FOR QA/QC ISSUE-SPECIFIC ACTION PLANS CHANGE NOTICE:
004 1
PROCEDURE NO.:
CPP-010 REVISION NO.:
7 ISSUE DATE: 04/28/87 l
PREPARATION OF DEVIATION REPORTS The CPP identified above is hereby changed as
/
shown on the attached page of this notice.
k l
)
l I
i Prepared by:
fd /$
Date:
- ->p-D
)
Approved by:
Date: 2/-j7 fi7 On-Site QA R y esentative G
he
/b i
Approved by:
/N Date:
QA/QCReviewTeamL{hder l
G708120017 0 80 445 PDR ADOCK PDR A
_________a
~
=-
Ei CPP-010 1
Rev. 7
[- '
- Page 2 of 2 1.
- Add as paragraph 4.4.4 as follows
f^\\l fy '
4.4.4 (Manufa:turing) Deviations
-)
Any' identified discrepancy related to the manufacture of safety-related equipment and/or material that has-been determined to constitute a verified failure to manufacture safety-related equipment and/or material in accordance with procurement and/or design requirements specified by TUGC0 and/or the vondcr.
- 2..
Revise paragraph 5.1 to read:
L 5.1 Initiation Should responsible QA/QC Review Team personnel (Refer to Table 4.1-1) determine that a (construction) (manufacturing) 3 deviation exists, or there appears to be a deviation common to the population or work activity, they shall initiate a DR in accordance with Attachment 6.1.
Inspectors she.11 identify'the the hardware associated with each (construction) deviation by attaching a tag-in a conspicuous location. Tags shall, as a minimum indicate:
DR NO:
Number
((
ID:
Item Number ERC:
Sig, nature of Inspector and Date It is unnecessary to tag any.of the hardware which compr1ses the population or work activity associated with a common deviation.
However, should a common (construction)/(Manufacturing) DR be issued that, in effect supercedes any (construction)/(manufacturing) DRs, any tags attached previously to the deviating hardware may remain intact.
Upon completion of DRs in accordance with Attachment 6.1, originators forward them to tne first reviewer.
f(
e-_-_____----___