Change Notice 004 to Rev 7 to Procedure CPP-010, Preparation of Deviation Repts
ML20236N573
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 04/28/1987
From: Zill R
EVALUATION RESEARCH CORP.
To:
Shared Package
ML20236N530 List: ... further results
References
CPP-010-04, CPP-10-4, NUDOCS 8708120017
Download: ML20236N573 (2)


Text

.=

I.'

Page l' of 2

,y L (my

'd EVALUATION RESEARCH CORPORATION UNCONTROLLED. COPY COMANCHE PEAK RESPONSE TEAM l

PROJECT PROCEDURE FOR QA/QC ISSUE-SPECIFIC ACTION PLANS CHANGE NOTICE:

004 1

PROCEDURE NO.:

CPP-010 REVISION NO.:

7 ISSUE DATE: 04/28/87 l

PREPARATION OF DEVIATION REPORTS The CPP identified above is hereby changed as

/

shown on the attached page of this notice.

k l

)

l I

i Prepared by:

fd /$

Date:

  1. ->p-D

)

Approved by:

Date: 2/-j7 fi7 On-Site QA R y esentative G

he

/b i

Approved by:

/N Date:

QA/QCReviewTeamL{hder l

G708120017 0 80 445 PDR ADOCK PDR A

_________a

~

=-

Ei CPP-010 1

Rev. 7

[- '

Page 2 of 2 1.
Add as paragraph 4.4.4 as follows

f^\\l fy '

4.4.4 (Manufa:turing) Deviations

-)

Any' identified discrepancy related to the manufacture of safety-related equipment and/or material that has-been determined to constitute a verified failure to manufacture safety-related equipment and/or material in accordance with procurement and/or design requirements specified by TUGC0 and/or the vondcr.

2..

Revise paragraph 5.1 to read:

L 5.1 Initiation Should responsible QA/QC Review Team personnel (Refer to Table 4.1-1) determine that a (construction) (manufacturing) 3 deviation exists, or there appears to be a deviation common to the population or work activity, they shall initiate a DR in accordance with Attachment 6.1.

Inspectors she.11 identify'the the hardware associated with each (construction) deviation by attaching a tag-in a conspicuous location. Tags shall, as a minimum indicate:

DR NO:

Number

((

ID:

Item Number ERC:

Sig, nature of Inspector and Date It is unnecessary to tag any.of the hardware which compr1ses the population or work activity associated with a common deviation.

However, should a common (construction)/(Manufacturing) DR be issued that, in effect supercedes any (construction)/(manufacturing) DRs, any tags attached previously to the deviating hardware may remain intact.

Upon completion of DRs in accordance with Attachment 6.1, originators forward them to tne first reviewer.