Change Notice 004 to Rev 7 to Procedure CPP-010, Preparation of Deviation Repts
ML20236N573
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 04/28/1987
From: Zill R
EVALUATION RESEARCH CORP.
To:
Shared Package
ML20236N530 List: ... further results
References
CPP-010-04, CPP-10-4, NUDOCS 8708120017
Download: ML20236N573 (2)


Text

.=,.

I.' ,

, Page l' of 2 y .

L

, (my

'd EVALUATION RESEARCH CORPORATION UNCONTROLLED. COPY COMANCHE PEAK RESPONSE TEAM l PROJECT PROCEDURE FOR QA/QC ISSUE-SPECIFIC ACTION PLANS CHANGE NOTICE: 004 1

PROCEDURE NO.: CPP-010 REVISION NO.: 7 ISSUE DATE: 04/28/87 l

PREPARATION OF DEVIATION REPORTS The CPP identified above is hereby changed as

/ shown on the attached page of this notice.

k l

)

l I

i Prepared by: fd /$ . Date: #->p- D _

)

Approved by: # Date: 2/-j7 fi7 On-Site QA R y esentative G .

i Approved by: /N Date: he ' /b

' l QA/QCReviewTeamL{hder G708120017 ADOCK 0 80 445 PDR PDR A

_________a

, _ _ _ _ _ _ _ - - _ - _ - - - - - - - - - - - - ~ =-

Ei CPP-010 1 Rev. 7

[- ' :Page 2 of 2

1.  ; Add as paragraph 4.4.4 as follows:

f^\

fy ' l 4.4.4 (Manufa:turing) Deviations

-) ,

Any' identified discrepancy related to the manufacture '

of safety-related equipment and/or material that has-been determined to constitute a verified failure to manufacture safety-related equipment and/or material in accordance with procurement and/or design requirements specified by TUGC0 and/or the vondcr.

2. . Revise paragraph 5.1 to read:

L 5.1 Initiation Should responsible QA/QC Review Team personnel (Refer to Table 4.1-1) determine that a (construction) (manufacturing) deviation exists, or there appears to be a deviation common to 3 the population or work activity, they shall initiate a DR in accordance with Attachment 6.1.

Inspectors she.11 identify'the the hardware associated with each (construction) deviation by attaching a tag-in a conspicuous location. Tags shall, as a minimum indicate:

DR NO: Number

((  %

ID:

ERC:

Item Number Sig, nature of Inspector and Date It is unnecessary to tag any.of the hardware which compr1ses the population or work activity associated with a common deviation. However, should a common (construction)/(Manufacturing) DR be issued that, in effect supercedes any (construction)/(manufacturing) DRs, any tags attached previously to the deviating hardware may remain intact.

Upon completion of DRs in accordance with Attachment 6.1, originators forward them to tne first reviewer.

f

(

e-_-_____----___ - - _ - -