ML20236N563

From kanterella
Jump to navigation Jump to search
Change Notice 003 to Rev 7 to Procedure CPP-010, Preparation of Deviation Repts
ML20236N563
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 01/16/1987
From: Zill R
EVALUATION RESEARCH CORP.
To:
Shared Package
ML20236N530 List: ... further results
References
CPP-010-03, CPP-10-3, NUDOCS 8708120014
Download: ML20236N563 (2)


Text

' g.

Paga 1 of 2 l ~ t,..

l

[Av-EVALUATION RESEARCH CORPORATION fiW*;n9 ?,7e?'* 1 i K3 C ",

C iu'd,a dbda4s b w.d b u ]d?!

d COMANCHE PEAK RESPONSE TEAM PROJECT PROCEDURE FOR QA/QC ISSUE-SPECIFIC ACTION PLANS CHANGE NOTICE: 003 PROCEDURE NO.: CPP-010 g

REVISION NO.:

7 ISSUE DATE: 01/16/87 O

PREPARATION OF DEVIATION REPORTS The CPP identified above is hereby changed as shown on the attached page of this notice.

Prepared by:

. j#

Date:

sp G 7

-y

/-' /I-77 Approved by:

Date:

On-31teg Representative

\\

/!/ af!f/$

-('

Approved by:

Date:

QA/QCReviewTeamLeaper

/

/

B708120014 870731 DR ADOCK 05000445 PDR

L Changs Notics 003.

4~

CPP-010-Revision: 07 L

^p l

,f ks/

1.

Change Section 3 of Change Notice 002..in part'to read:

... Also i,

.see paragraph 5.3.1.

For ISAP VII.t. 9 the QA/QC Engineer, after

+

obtaining the ISAP Issue Coordinators approval on the validated DR, will make a copy of the valid DR and send the~ copy.by way.of memorandum, to SSEG forfevaluation in accordance with reference 3.1.. The QA/QC Engineer will file the original DR and a copy of the memorandum sent to SSEG in the original VII.a.9 package.

l r

N I

l f

i 4

2

.,