ML20236N563
| ML20236N563 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 01/16/1987 |
| From: | Zill R EVALUATION RESEARCH CORP. |
| To: | |
| Shared Package | |
| ML20236N530 | List:
|
| References | |
| CPP-010-03, CPP-10-3, NUDOCS 8708120014 | |
| Download: ML20236N563 (2) | |
Text
' g.
Paga 1 of 2 l ~ t,..
l
[Av-EVALUATION RESEARCH CORPORATION fiW*;n9 ?,7e?'* 1 i K3 C ",
C iu'd,a dbda4s b w.d b u ]d?!
d COMANCHE PEAK RESPONSE TEAM PROJECT PROCEDURE FOR QA/QC ISSUE-SPECIFIC ACTION PLANS CHANGE NOTICE: 003 PROCEDURE NO.: CPP-010 g
REVISION NO.:
7 ISSUE DATE: 01/16/87 O
PREPARATION OF DEVIATION REPORTS The CPP identified above is hereby changed as shown on the attached page of this notice.
Prepared by:
. j#
Date:
sp G 7
-y
/-' /I-77 Approved by:
Date:
On-31teg Representative
\\
/!/ af!f/$
-('
Approved by:
Date:
QA/QCReviewTeamLeaper
/
/
B708120014 870731 DR ADOCK 05000445 PDR
L Changs Notics 003.
4~
CPP-010-Revision: 07 L
^p l
,f ks/
1.
Change Section 3 of Change Notice 002..in part'to read:
... Also i,
.see paragraph 5.3.1.
For ISAP VII.t. 9 the QA/QC Engineer, after
+
obtaining the ISAP Issue Coordinators approval on the validated DR, will make a copy of the valid DR and send the~ copy.by way.of memorandum, to SSEG forfevaluation in accordance with reference 3.1.. The QA/QC Engineer will file the original DR and a copy of the memorandum sent to SSEG in the original VII.a.9 package.
l r
N I
l f
i 4
2
.,