Change Notice 003 to Rev 4 to Quality Instruction QI-008, Reinsp of Conduit/I-E-CDUT
ML20236N743
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 03/17/1987
From: Zill R
EVALUATION RESEARCH CORP.
To:
Shared Package
ML20236N530 List: ... further results
References
QI-008-03, QI-8-3, NUDOCS 8708120086
Download: ML20236N743 (2)


Text

_ _ _ _ _ _ - -.

i i

Page 1 of 2 C

EVALUATION RESEARCH CORPORATION C0HANCHE FEAK RESPONSE TEAM QUALITY INSTRUCTION FOR ISSUE-SPECIFIC ACTION PLAN VII.c i

l 1

CHANGE NOTICE: 003 INSTRUCTION NO: QI-008 REVISION: 4 EFFECTIVE DATE: 03-17-87

%3CITRDLLED copy REINSPECTION OF CONDUIT /I-E-CDUT Prepared by:

w%

Date:

f"df-[7 r

Approved by:

Date: 3-6-47 Issgt Coordinator V Approved by:

Date: 3-l8 -t 7 On' Site QA Representative 3[tO!84 Approved by:

bl Date:

QA/QC Review feam Leader

//

O 8708120086 870731 PDR ADOCK 0500 5

-- ^

.4.

r>

'Chengs Notics.003' QI-008 Rev. 4 f'V 1.

Change Paragraph 10.a to read as follows:

-Verify one. inch' air clearance between conduit'(including SBM or thermolag over the conduit) and pipe with an operating temperature of:200*F or greater. For clearance of conduit to pipe with an operating temperature of less than 200'F, an air gap is required.

The pipe insulation may-be notched to obtain the required i-clearances. Flexible conduit may touch the pipe or insulation as

. long as it. can be moved at least. 2 inches away from them.