EVALUATION RESEARCH CORPORATION C0HANCHE FEAK RESPONSE TEAM QUALITY INSTRUCTION FOR ISSUE-SPECIFIC ACTION PLAN VII.c i
l 1
CHANGE NOTICE: 003 INSTRUCTION NO: QI-008 REVISION: 4 EFFECTIVE DATE: 03-17-87
%3CITRDLLED copy REINSPECTION OF CONDUIT /I-E-CDUT Prepared by:
w%
Date:
f"df-[7 r
Approved by:
Date: 3-6-47 Issgt Coordinator V Approved by:
Date: 3-l8 -t 7 On' Site QA Representative 3[tO!84 Approved by:
bl Date:
QA/QC Review feam Leader
//
O 8708120086 870731 PDR ADOCK 0500 5
-- ^
.4.
r>
'Chengs Notics.003' QI-008 Rev. 4 f'V 1.
Change Paragraph 10.a to read as follows:
-Verify one. inch' air clearance between conduit'(including SBM or thermolag over the conduit) and pipe with an operating temperature of:200*F or greater. For clearance of conduit to pipe with an operating temperature of less than 200'F, an air gap is required.
The pipe insulation may-be notched to obtain the required i-clearances. Flexible conduit may touch the pipe or insulation as
. long as it. can be moved at least. 2 inches away from them.