ML20236N584
| ML20236N584 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 03/25/1987 |
| From: | Hansel J, Zill R EVALUATION RESEARCH CORP. |
| To: | |
| Shared Package | |
| ML20236N530 | List:
|
| References | |
| CPP-011-03, CPP-11-3, NUDOCS 8708120021 | |
| Download: ML20236N584 (2) | |
Text
-_
6 Pegs 1 of 2 et (3
EVALUATION RESEARCH CORPORATION UF,00NTROLLED COPY COMANCHE PEAK RESPONSE TEAM PROJECT PROCEDURE FOR ALL QA/QC ISSUE-SPECIFIC ACTION PLANS
' CHANGE NOTICE: 003 4
PROCEDURE NO: CPP-011 REVISION:
2 ISSUE DATE: 03-25-87 e(
EVALUATIONS OF ADVERSE TREND ANALYSES, CONSTRUCTION DEFICIENCIES, 1
AND QA/QC PROGRAM DEFICIENCIES The CPP identified above is hereby changed as shown on the attached page of this notice.
3[3f!Ob Prepared by:
Date:
y i
I Approved by:
Date: 3~$k-h On-pteQARefredentative l
Approved by:
Date: 3 9'
P7
.c3 Qi,QgjmeviewTeamtvader
//
l p?AS2188M 85858143 A
PDR t..
<r
.Changa Notice 003 g
CPP-011 Revision:
2-L
[T
- d.-
1.
Change the last sentence.in the first paragraph of Section 5.1.1' to read:
.l "Accordingly, the-QA/QC Issue. Coordinator / Lead Discipline Engineer prepares an Adverse Trend Analysis in accordance with Attachment 6.1, or documents the. analysis in the Results Report."
- 2..
Change the second paragraph of Section 5.2.1 to read:
"The QA/QC Issue Coordinator / Lead Discipline Engineer. ensures that the result of the. root / contributing casue(s) and any generic implication analysis is-documented in accordance with Attachment i
6.3 or in the Easults Report."
V i
I
(-
2 Q____-__.___-