I' EVALUATION RESEARCH CORPORATION
)
bi FORINFORMATION ONLY COMANCHE PEAK RESPONSE TEAM PROJECT PROCEDURE FOR QA/QC ISSUE-SPECIFIC ACTION PLAN CHANGE NOTICE NO.:
003 PROCEDURE NO: CPP-016 REVISION:
5 ISSUE DATE:
6-
-87 (3
SAFETY SIGNIFICANCE EVALUATIONS OF DEVIATION REPORTS Prepared by:
FM.
t/22 /e7 Date:
Approved by:
Date:
4-2347 On-Site QA l@ preventative 3!'E7 Approved by:
,/[
Date:
S
/QC Rev.'ew Team Leader
/
/
O 8708120032 870731 PDR ADOCK 0500 5
. l.
?G Chrugs Notica 003
- t
- CPP-016 r
c Revisions. 5 p
.1.
Section 4.2; revise the second parah:sph to :
~
Should an' activity be designated ae' the responsibility of a Lead
,i Discipline Engineer, or higher, it may be delegated by that engineer or by the SSEG Supervisor to another individual.
2.
Section 5.2.5.2; revise the first paragraph to-:
Deviation types.cciered by corrective' action programs - will be.
censidered similar to unc1*nified DRs, whereas a hardware performance evaluation iflnot rcquind for deviation types already i
addressed by a TU Electric corrective'setion program. No conclusion shall be made on the, ability of the affected item to perform its intended safety related. function without taking into account the referenced corrottive action, c
s 4