.. -,y
..\\
COMANCHE PEAK RESPONSE TEAM PROJECT PROCEDURE ICR QA/QC ISSUE-SPECIFIC ACTION PLANS CHANGE NOTICE: 001 PROCEDURE NO: CPP-025 REVISION: 0 ISSUE DATE: 10-08-86 G
i V
~
QC INSPECTOR QUALIFICATION EVALUATION The CPP identified above is hereby changed as shown on the attached page of this notice.
l
/8[8[80 Prepared.by:
Date:
Approved by:
'Date: /d 8' Ed On-SiteyRepresentative
/
Approved by:
L Date: /d 8$
' Review Tea'm Leader
/I 87081 N 066 870731 PDR ADOCK 0500 5
A
._____-______-_D
Chtngs Notica 001 CPP-025 Revision: 0 1.
Change the NOTE in Section 5.1 to read:
t0 "Should a DR be invalid, the Coordinator' records reasonable justification which supports the conclusion on the form, enters "N/A" to indicate "not applicable" in the spaces provided for the signatures of the first reviewers and originator, then signs and dates it.
The Coordinator ensures that any information used in the validation process is traceable to an seceptable source document and is referenced on the form. Any attachments are indicated on the form.
Due to the extensive reviews required to be conducted by the ISAP I.d.1 Coordinator to determine the validity of the DRs, the Coordinator is responsible for their disposition.
Therefore, the signature concurrence of the originator and/or the first reviewers in validity determinations of DRs relative to QC Inspector certification is unnecessary."
l O