MONTHYEARML20211Q4981999-09-10010 September 1999 Proposed Tech Specs Clarifying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits & Adding Ref to Caldon TR for LEFM ML20211G3221999-08-26026 August 1999 Proposed Tech Specs 4.0.6 Re SG Surveillance Requirements ML20212H0771999-08-20020 August 1999 Rev 6 to CPSES Glen Rose,Tx ASME Section XI ISI Program Plan for 1st Interval on 990820. Page 119 in Unit 1 ASME Section XI of Incoming Submittal Not Included ML20212G0821999-08-20020 August 1999 Rev 4 to Augmented Inservice Insp Plan for Cpses,Unit 1 ML20210R7091999-08-13013 August 1999 Revised Proposed Tech Specs for LAR 98-010,proposing Rev to TS Table 3.3.1-1, Rt Sys Instrumentation & TS Table B 3.3.1-1, Rt Sys Setpoints ML20211M0041999-08-0505 August 1999 Rev 31 to Technical Requirements Manual ML20211G7401999-07-27027 July 1999 Revs 29 & 30 to Technical Requirements Manual (TRM) for Cpses,Units 1 & 2 ML20209E1861999-07-0909 July 1999 Proposed Tech Specs,Adding Reactor Core Safety Limit Figures to Section 5.6.5 of Ts,Clarifying That Overpower N-16 Setpoint Remains in TS & Reflecting NRC Approval of TRs Used to Determine Core Operating Limits Presented in COLR ML20212J4251999-06-23023 June 1999 Proposed Tech Specs,Revising EDG Start Be Emergency Start Instead of Normal Start Following Loss of Offsite Power ML20195E5401999-06-0404 June 1999 Proposed Tech Specs Pages 3.2-6,3.4-24,3.4-25,3.7-23,3.7-30, 3.8-25,3.9-9,3.9-10 & 4.0-2,provided as Addl Aditorial Changes Supplementing LAR 99-001 ML20195B6461999-05-27027 May 1999 Marked-up TS Pages Re LAR 99-004,changing Plant Battery Surveillance ML20195B6771999-05-24024 May 1999 Proposed Tech Specs Relocating Parameter Limits Allows for Available Operating & Analytical Margins to Be Used in Most Efficient Manner ML20206G7111999-05-0404 May 1999 Proposed Tech Specs Revising Surveillances Associated with Plant Battery & EDGs & Miscellaneous Editorial Corrections ML20206Q0311999-04-16016 April 1999 Rev 28 to CPSES Technical Requirements Manual ML20205Q1681999-04-14014 April 1999 Rev 27 to CPSES Technical Requirements Manual ML20207F3511999-02-25025 February 1999 Fire Endurance Test to Qualify Protective Envelope for Class IE Electrical Circuits ML20203B0011999-01-25025 January 1999 Rev 10 to Security Training & Qualification Plan ML20211C1071999-01-15015 January 1999 Rev 3 to ASME Section XI ISI Program Plan,Unit 2 - 1st Interval ML20198J3171998-12-21021 December 1998 Proposed Tech Specs,Proposing Changes Administratively for Unit 1 & Increasing Licensed Power for Operation of Unit 2 to 3445 Mwt ML20198J2541998-12-18018 December 1998 Proposed Tech Specs Sections 1.0,3.1,3.3,3.4,3.6,3.7,3.9 & 5.0,converting to ITS ML20198J5211998-12-17017 December 1998 Corrected Tech Specs Pages for Section 3.8 to 971211 Submittal Re TS Conversion Application ML20197K0491998-12-11011 December 1998 Proposed Tech Specs Section 3.8, Electrical Power Systems, Converting to ITS ML20196C5361998-11-20020 November 1998 Proposed TS Converting to ITS Sections 4.0,3.4 & 3.6 ML20195F1751998-11-13013 November 1998 Proposed Tech Specs,Revising Administrative Controls Section to Include Configuration Risk Mgt Program Into CPSES TS ML20195F5291998-11-11011 November 1998 Proposed Tech Specs Revising Core Safety Limit Curves & Overtemperature N-16 Reactor Trip Setpoints for Unit 2 Cycle 5 ML20196B8811998-10-30030 October 1998 Proposed Tech Specs Section 3.3 Re Instrumentation ML20154R7861998-10-21021 October 1998 Proposed Tech Specs Section 3.7, Plant Systems ML20154S2901998-10-14014 October 1998 Proposed Tech Specs Sections 3.1,3.2,3.4,3.5 & 5.0 Re Reactivity Control Sys,Power Distribution Sys,Rcs,Eccs & Administrative Control,Respectively ML20154C9101998-10-0202 October 1998 Proposed Tech Specs 4.0.6, SG SR, Adding Definitions Required for F* Alternate Plugging Criterion & Identifies Portion of Tube Subject to Criteria ML20153E2661998-09-24024 September 1998 Proposed Improved Tech Specs Sections 3.4, RCS & 5.0, Administrative Controls ML20237E8461998-08-28028 August 1998 Proposed Tech Specs Pages Re Sections 1.0,2.0 & 3.0 of Proposed TS Changes in 980707 & s,In Response to NRC RAI ML20154C4511998-07-20020 July 1998 Interim Change Request ISI-1R5-01, Unit 1 ISI Plan,Rev 5 ML20236T9931998-07-20020 July 1998 1RF06 ISI Summary Rept First Interval,Third Period,First Outage for CPSES Unit 1, Commerical Operating Date 900830 ML20236J3131998-07-0101 July 1998 Revised Proposed Tech Specs Pages Re Safety Injection Signal & Blackout Signal ML20249C6101998-06-22022 June 1998 Proposed Tech Specs Section 3.6 Re Conversion Application ML20216B2811998-04-24024 April 1998 Rev 13 to Cpses,Units 1 & 2,IST Plan for Pumps & Valves First Interval ML20216E6291998-04-0909 April 1998 Marked-up TS Pages,Reflecting Proposed Changes in Amends to Licenses NPF-87 & NPF-89 ML20216B1471998-04-0606 April 1998 Proposed Tech Specs,Allowing Plant to Continue to Operate W/O Having to Perform Portions of SRs ML20217A3901998-03-18018 March 1998 Proposed Tech Specs Surveillance Requirements 4.8.1.1.2f.4)a) & 4.8.1.1.2f.6)a) at Power Re Enforcement Discretion ML20216H1361998-03-13013 March 1998 Proposed Tech Specs Re Electrical Systems Surveillance Requirements ML20248L3191998-03-12012 March 1998 Proposed Tech Specs TS 4.8.1.1.2f.4)b) & TS 4.8.1.1.2f.6)b) Re Request for Enforcement Discretion ML20216D6021998-03-0909 March 1998 Proposed Tech Specs Temporarily Removing Requirement to Demonstrate Load Shedding Feature of MCC XEB4-3 as Part of SRs 4.8.1.1.2f.4)a) & 4.8.1.1.2f.6)a),for Unit 2 Only ML20203K8621998-02-27027 February 1998 Proposed Tech Specs,Increasing RWST low-low Level Setpoint ML20203J5211998-02-25025 February 1998 Proposed Tech Specs Page to Remove Requirement to Demonstrate Load Shedding Feature of MCC XEB4-3 as Part of Surveillance Requirements 4.8.1.1.2f.4(a) & 4.8.1.1.2f.7(a) Until Plant Startup Subsequent to Next Refueling Outage ML20203J6151998-02-24024 February 1998 Rev 26 to Technical Requirements Manual ML20217P1531998-02-12012 February 1998 Rev 2 to ISI-2R2-01, Unit 2 ISI Plan ML20202B1641998-02-0505 February 1998 Proposed Tech Specs Bases 3/4.7.1.5 Re Main Steam Line Isolation Valves ML20217P2961998-01-30030 January 1998 Rev 5 to Unit 1 ISI Program Plan ML20202E5981997-11-25025 November 1997 Rev 12 to CPSES Units 1 & 2 IST Testing Plan for Pumps & Valves,First Interval ML20212C3881997-10-24024 October 1997 Proposed Tech Specs Re Revised Core Safety Limit Curves & Revised Overtemperature N-16 Reactor Trip Setpoints 1999-09-10
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20212H0771999-08-20020 August 1999 Rev 6 to CPSES Glen Rose,Tx ASME Section XI ISI Program Plan for 1st Interval on 990820. Page 119 in Unit 1 ASME Section XI of Incoming Submittal Not Included ML20212G0821999-08-20020 August 1999 Rev 4 to Augmented Inservice Insp Plan for Cpses,Unit 1 ML20211M0041999-08-0505 August 1999 Rev 31 to Technical Requirements Manual ML20211G7401999-07-27027 July 1999 Revs 29 & 30 to Technical Requirements Manual (TRM) for Cpses,Units 1 & 2 ML20206Q0311999-04-16016 April 1999 Rev 28 to CPSES Technical Requirements Manual ML20205Q1681999-04-14014 April 1999 Rev 27 to CPSES Technical Requirements Manual ML20203B0011999-01-25025 January 1999 Rev 10 to Security Training & Qualification Plan ML20211C1071999-01-15015 January 1999 Rev 3 to ASME Section XI ISI Program Plan,Unit 2 - 1st Interval ML20154C4511998-07-20020 July 1998 Interim Change Request ISI-1R5-01, Unit 1 ISI Plan,Rev 5 ML20236T9931998-07-20020 July 1998 1RF06 ISI Summary Rept First Interval,Third Period,First Outage for CPSES Unit 1, Commerical Operating Date 900830 ML20216B2811998-04-24024 April 1998 Rev 13 to Cpses,Units 1 & 2,IST Plan for Pumps & Valves First Interval ML20203J6151998-02-24024 February 1998 Rev 26 to Technical Requirements Manual ML20217P1531998-02-12012 February 1998 Rev 2 to ISI-2R2-01, Unit 2 ISI Plan ML20217P2961998-01-30030 January 1998 Rev 5 to Unit 1 ISI Program Plan ML20202E5981997-11-25025 November 1997 Rev 12 to CPSES Units 1 & 2 IST Testing Plan for Pumps & Valves,First Interval ML20212E9811997-10-0606 October 1997 Rev 11 to CPSES Units 1 & 2 IST Plan for Pumps & Valves First Interval ML20210S3911997-09-0303 September 1997 Rev 10 to CPSES Units 1 & 2 Inservice Testing Plan for Pumps & Valves in First Interval ML20151L1391997-07-31031 July 1997 5 to Technical Requirements Manual, for Plant ML20141E6201997-06-26026 June 1997 Rev 24 of CPSES Units 1 & 2 Technical Requirements Manual ML20141F8471997-06-26026 June 1997 Rev 9 to IST Plan for Pumps & Valves First Interval ML20136G4361997-03-13013 March 1997 Rev 23 to CPSES Units 1 & 2 Technical Requirements Manual ML20135A8241997-02-24024 February 1997 Rev 22 to CPSES Units 1 & 2 Technical Requirements Manual ML20134C6831997-01-31031 January 1997 Rev 8 to Comanche Peak Steam Electric Station Units 1 & 2 Inservice Testing Plan for Pumps & Valves First Interval ML20134M4371996-11-13013 November 1996 Self Assessment Guide Program Guidelines ML20129A5991996-10-16016 October 1996 Rev 7 to CPSES Unit 1 & 2 IST Plan for Pumps & Valves First Interval ML20128G7661996-10-0202 October 1996 CPSES Unit 1 & 2 Inservice Testing Plan for Pumps & Valves First Interval ML20138B5181996-10-0101 October 1996 Rev 14 to ODCM for TU Electric CPSES Units 1 & 2 ML20117C8461996-07-19019 July 1996 Glen Rose,Tx ASME Section XI ISI Program Plan,Unit 1 - 1st Interval Rev 4 ML20217M1691996-05-24024 May 1996 Rev 3 to STA-750, Check Valve Reliability Program ML20117C6181996-05-0303 May 1996 Rev 1 to Unit 2 ISI Plan ML20117C6141996-04-14014 April 1996 Rev 1 to Unit 2 ISI Plan ML20107J0941996-04-0202 April 1996 Rev 1 to Interim Change Request ISI-2, CPSES Unit 2 ASME Section XI ISI Program Plan ML20107E4471996-02-0909 February 1996 Rev 1 of CPSES ASME XI ISI Program Plan Unit 2 ML20100B9471996-01-24024 January 1996 Rev 21 of CPSES Units 1 & 2 Technical Requirements Manual ML20086C5491995-06-30030 June 1995 Rev 20 to Technical Requirements Manual ML20091L1941995-03-29029 March 1995 Interim Change Request ISI-IR3-003, Unit 1 ISI Plan ML20081F1131995-03-12012 March 1995 Interim Change Request ISI-1R3-02 to Rev 3 to Unit 1 ISI Plan ML20080Q3351995-02-24024 February 1995 Rev 17 to CPSES Technical Requirements Manual ML20078R6371995-02-15015 February 1995 Rev 5 to CPSES Unit 1 & 2 IST Plan for Pumps & Valves First Interval ML20078H8501994-11-30030 November 1994 CPSES Odmc Rev Change Sheet ML20073L6591994-10-0606 October 1994 Rev 4 to CPSES Unit 1 & 2 IST Plan for Pumps & Valves First Interval ML20072C7081994-07-24024 July 1994 Rev 16 to Simulator Operations/Maint Instruction - 010, Simulator Certification Testing ML20069E5171994-05-17017 May 1994 Interim Change Request ISI-2RO-001, Comanche Peak Ses Unit 2 ISI Program Plan ML20029D0711994-05-11011 May 1994 Rev 16 to Technical Requirements Manual. ML20065K1721994-04-15015 April 1994 Rev 15 to CPSES Units 1 & 2 Technical Requirements Manual ML20058E3841993-11-30030 November 1993 Rev 14 to Technical Requirements Manual, Page 2-27, Clarifying Discussion in Table 2.1.1 Notations for Local Test Connections,Vent & Drain Valves & Revising List of Effective Pages EPL-1 Through EPL-4 ML20058C4441993-11-23023 November 1993 IST Plan for Pumps & Valves First Interval, Rev 3 ML20058B5791993-11-19019 November 1993 Rev 14 to Comanche Peak Steam Electric Station Technical Requirements Manual ML20058J9711993-11-19019 November 1993 Interim Change Request ISI-1R2-005 to Rev 2 to Unit 1 ISI Plan ML20056D8161993-08-11011 August 1993 Salp,Directive 8.6 1999-08-05
[Table view] |
Text
- _ _ _ - -
Page 1 of 3 l^
l' s EVALUATION RESEARCH CORPORATION I,
%d UNCONTROLLED COPY COMANCHE PEAK RESPONSE TEAM PROJECT PROCEDURE FOR QA/QC ISSUE-SPECIFIC ACTION PLANS CHANGE NOTICE NO: 003 PROCEDURE NO: CPP-027 REVISION NO: 1 l
ISSUE DATE: 03-04-87 l
0 REINSPECTION / DOCUMENTATION REVIEW OF PURCHASED SAFETY-RELATED MATERIAL AND EQUIPMENT Prepared by:
/_p/ Date: Ma f f>
Approved by: Date: Y- Y- 72 On-Site QA g esentative Approved by: k' b Date: 9// / 84 QAMC Kevieit Tea $ Leader
's 8708120001 070731 PDR ADOCK 05000445
, A PDR t._________.. ._. - - - - - - - -
9!
Pega 2 of'3
(
1.. Delete'"For non-substantive changes. the'QA/QC Engineer shall obtain the concurrence of the ISAP Issue Coordina*or and the QOC Deputy Program Manager, line.througa, initial, and date the item to be changed and enter the change accordingly. (When change is made, the QA/QC Engineer, ISAP Issue Coordinator and QOC Deputy.
program manager shall initial and date the change)" from change notice 002 item 1.
- 2. Change section 5.1.5 to read:
5.1.5 Changes to. approved checklists and implementing instructions require the approval of the ISAP Issue Coordinator and the QOC Deputy Program Manager. The method of effecting a change to the verification package is judgemental based on the complexity of the change; provided the chosen method enables a clear understanding of the scope of the change and the justification. If the change is extensive.enough that a change by lining-thru, initialing &' dating will not provide the required clarity, the applicable individual pages will be revised as shown in Section 5.3.1. below.
The revisions shall be processed in the same manner described in paragraph 5.1.3 above. In addition the memoranda shall state the reason for revision and what effect the revision will have on the reinspection effort
'O
/
(i.e., Redo completed reinspection). If the page to be revised contain(s) information previously entered by the QA/QC Inspector and this information is not affected by the revision, the information will'be transferred to the revised page by the original QA/QC inspector and approved by the QA/QC Issue-Engineer. If the original QA/QC Inspector ic not available to make this transfer of information, the information will be transferred by the QOC Issue Coordinator and reviewed and approved by the QOC Deputy Progr w Manager.
- 3. Change Section 5.3.1, in part, to read:
The ISAP Issue Coordinator will maintain a log of verifiution packagee numbers issued. Revisions of individual pages et the !
verification packages will be identified as in the example ;
below. I I-M-VII.a.9-001-01 A two (2) digit suffix indicating the number of the revision to the originally issued page.
r- - .. - _ _ _ _ . _ -- _ - . - - _ -______ _ _--
4.
Pegs.3 of 3'
.4 Change Section 5.4.5. in part, to read:
L/'~'s 5.4.5 The QA/QC Discipline level III Inspector or Inspection
() Supervisor reviews the verification package to ensure that reinspection / documentation review results are clear- !
and complete. '
Upon completion of each satisfactory review, the.QA/QC Discipline Level III Inspector or. Inspection Supervisor signs and dates the' checklist in the appropriate block and forwards it to the responsible ISAP QA/QC Engineer via the QA/QC Inspection Supervisor.
The QA/QC Discipline Level III Inspector or Inspection- i Supervisor documents the transmittal in a memorandum which includes; Verification package number.
Inspector's initials.
Date the reinspection / documentation review was completed.
- 5. Change Section 4.0 first sentence to read:
Verification packages are prepared for equipment'and material items selected--for evaluation.
(
1 l-l l
(,-
1 e
t______.-- - .-
Ii i
INSTRUCTION SHEET
,, s (QI's)
REMOVE BERT ;
Table of Contents Table of Contents 11/04/86 05/28/87 QI-008, Rev. 4 Change Notice 002 Q1-014, Rev. 1 Change Notice 004 QI-023, Rev. 2 QI-023, Rev. 3 i QI-023, Rev. 2 QI-023, Rev. 3 Change Notice 001 Change Notice 001 l
Ql-023, Rev. 2 Change Notice 002 QI-025, Rev. 3 QI-025, Rev. 4 QI-026, Rev. 2 QI-026, Rev. 3
,-m
() QI-032, Rev. 2 QI-032, Rev. 3 QI-035, Rev. 1 QI-0~5, Rev. 2 QI-036, Rev. 1 QI-036,Rev. 2 QI-036, Rev. 1 Change Notice 001 QI-042, Rev. 1 Change Notice 003 QI-043, Rev. 2 QI-043, Rev. 3 QI-043, Rev. 2 Change Notice 001 .
QI-045, Rev. 3 QI-045, Rev. 4 QI-045, Rev. 3 Change Notice 001 QI-048, Rev. 1 Change Notice 003
( QI-051, Rev. 2 01-051, Rev. 3 m
l l
l
[t i, (
INSTRUCTION SHEET (G
'v'
) (QI's)
REMOVE INSERT QI-051, Rev. 2 Change Notice 001 QI-051, Rev. 2 Change Notice 002 QI-052, Rev. 1 QI-052, Rev. 2 QI-052, Rev. 1 Change Notice 001 QI-052, Rev. 1 Change Notice 002 QI-053, Rev. 1 QI-053, Rev. 2 QI-053, Rev. 1 Change Notice 001 QI-053, Rev. 1
(-)
V Change Notice 002 QI-058, Rev. 3 QI-058, Rev. 4 QI-059, Rev. 4 Q1-059, Rev. 5 QI-060, Rev. 2 QI-060, Rev. 2 Notice of Cancellation QI-075, Rev. O Change Notice 002
.o
Pace 1 of 5
, EVALUATION RESEARCH CORPORATION
(] OUALITY INSTRUCTIONS FOR CCMANCHE PEAK OUALITY ASSESSMENT PROGRAM TABLE OF CONTENTS l
05-28-87 UNCONTR0llED 01 NUMBER ITEM CHANGE l REV DATE NOTICE DATE Table of Contents 05-28-87 n'il Procedure for Class IE Cable Terminations Inspection-CPRT Action Item I.a.4 3 12/28/B4 002 CPRT Action Item I.a.2. Insoection Report on Butt Splices and CPRT Action Item I.a.3 Butt 4 02/05/85 Splice Qualifications 003 Procedure for Class IE Heat Shrinkable' Cable '
0 01/15/85 Insulation Sleeves-CPRT Action Item I.a.1
'Q V
004 CPRT Action Item I.b.1-Flexible Conduit to Flexible Conduit Seoaration 4 03/12/85 CPRT Action Item I.b.2-Flexible Conduit to Cable Separation 005 Evaluation of Inspector Performance 3 04/23/86 1 10/16/86 006 Reinspection of Type 2 Skewed Welds 2 09/28/85 1 08/06/86 007 Reinspection of Plug Welds 4 04/24/86 008 Reinspection of Conduit /I-E-CDUT 4 03/18/86 1 03/27/86 2 07/25/86 3 03/I7/87 009 CANCELLED 12/04/86 010 Reinspection of Electrical Eouipment/I-E-EEIN 3 02/21/86 011 Documentation Review of Electrical Equipment /
R-E-EEIN 1 03/07/86 012 Reinspection of Instrumentation Eouipment/
I-E-ININ 1 01/30/86 1 02/25/86 2 09/26/86 O
e b
01 l NLNBER ITEM CHANGE l REV DATE NOTICE DATE
(~%
(') 013 Documentation Review for Instrumentation Eauioment/R-E-ININ 5 02/04/86 1 06/04/86 2 06/26/86 014 Reinspection of Cables /1-E-CABL 1 02/19/86 1 03/12/86 2 04/09/86 3 n4/18/86 4 03/17/87 015 Documentation Review of Cables /R-E-CABL 4 02/12/86 1 04/09/86 2 05/02/86 l 3 05/06/86 4 06/30/86 016 Reinboection of Cable Trays /I-E-CATY 3 04/03/86 1 04/07/86 017 Documentation Review of Cable Tray /R-E-CATY 1 02/12/86 1 02/19/86 2 06/23/86 018 Reinspection of Previously Disassembled I
Valves 0 07/29/85 1 09/19/85 2 03/21/86 019 Reinspection of Small Bore Pipe Supports 4 06/27/86 1 1l/06/86 020 Documer,tation Review of Small Bore Pipe Supports 1 03/03/86 I
V 021 Reinspection of Piping System Bolted 2 02/05/86 1 05/08/86 Joint / Materials 2 05/15/86 3 09/05/86 4 11/05/86 022 Documentation Review of Piping System Bolted Joints / Material 1 02/05/86 1 09/05/86 023 Reinspection of HVAC Eauipment Installation 3 02/06/87 024 Reserved 025 Reinspection of Large Bore Piping Configuration 4 02/19/87 026 Reinspection of Small Bore Piping Configuration 3 02/19/87 027 Reinspection of Large Bore Pipe Supports-Rigid 3 06/27/86 1 11/06/86 028 Documentation Review of Large Bore Pipe Supports-Rigid 1 03/06/86 029 Reinspection Procedures for Large Bore Pipe 3 06/27/86 1 11/10/86 Supports-Non Rigid l
Cr 2
01 NUMBER ITEM CHANGE REV DATE NOTICE DATE
.030 Documentation Review of Large Bore Pipe Supports-Non Rigid 1 03/06/86
'031 Reinspection of Containment Liner and Tank Stainless Steel Liner 2 02/21/86- 1- 04/24/86 032 i
Documentation Review of-Containment Liner 3 04/03/87 and Tank Stainless Steel Liners
.033 Reinspection of Fuel Building Fuel Pool Liners- 1 03/07/86 1 04/07/86 034 Documentation Review of Fuel Building Fuel Pool Liners 2 06/27/86' 035 Reinspection of HVAC Duct Suoports 2 04/03/87 036. Documentation Review of HVAC Duct Supports 2 04/03/El 037 Reinspection of Pipe Supports TRT Issues- 2 10/10/86 l
Pipe Supports in Rm 77N, Safeguards Bldg.,
I Unit 1 038 e Reserved 039 Reinspection of HVAC Ducts and Plenums 0 040 Documentation Review of HVAC Ducts and Plenums 1 02/20/86 1 02/20/86 1 1 11/25/86 07/23/86 041' Reinspection of Field Fabricated Tanks 1 01/29/86 042 Documentation Review of Field Fabricated Tanks 1 01/30/86 1 06/12/86 2 10/29/86 043 Reinspection of Concrete Placement 3 cela$1.
3 05-28-87 044 Documentation Review of Concrete Placements 3 07/22/86 045 Reinspection of Structural Steel 4 02/03/87 046 Documentation Review of Structural Steel 2 06/27/86 047 Reinspection of Small Bore Pipe Welds / Material 2 03/18/86 1 04/03/86 2 12/09/86 048 Documentation Review of Tubing Welds / Material 1 05/09/86 1 05/22/86 i 2 06/06/86 3 03/17/87 049 Reinspection of Large Bore Pipe Welds / Material 1 03/18/86 1 04/03/86 O
3
d OI NUMBER ITEM CHANGE REV DATE NOTICE DATE 050 Reinspection of Pipe Welds / Material 0 03/18/86 051 Reinspection of Pipe Whip Restraints 3 03/27/87 052 Documentation Review of Pipe Whip Restraints 2 03/27/87 053 Reinspection of Category I Conduit Suppcrts/
I-5-COSP 2 04-08-87 054 Documentation Review of Category I Conduit Supports / R-S-COSP 1 02/27/86 1 06/27/86 i 055 Reinspection of Instrument Pipe / Tube Supports /
I-S-INSP 2 02/27/86 1 10/30/86 056 Documentation Review of Instrument Pipe / Tube Supports /R-S-INSP 1 02/27/86 1 06/27/86 057 Documentation Review of Fill and Backfill 7 11/03/86 Placement 058 Reinspection of Pipe Support. '
' Issues- 4 03/16/87 42 Pipe Supports '
059 Reinspection of Mechanical Equipment Installation 5 03/31/87 060 Documentation Review of Mechanical Equipment Installation 2 06/17/86 061 Documentation Review of TRT Issues 42 Pipe Supports 0 11/26/85 062 Inspection of Non-Pressure Boundary Welds for a Supplementary Evaluation of Visual 0 10/25/85 1 12/18/85 Welding Inspection Techniques 063 Reinspection of Torque for Drilled-In Concrete 1 01/30/86 1 02/10/86 Expansion Anchors (Hilti Bolts) 064 Reserved 065 Reserved ,
066 Reinspection of Equipment Supports 1 02/11/86 1 02/12/86 2 04/n3/86 3 10/03/86 4 11/10/86 067 Documentation Review of Equipment Supports 1 04/30/86 4
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . - - - - - - - - - - - - - - - - - - - - - ' - ' - ~ ~ ' - ~ ' - ~ ~ - -
i QI NUMBER ITEM CHANGE REV DATE NOTICE DATE 068 73 Documentation Review of Cement Grout 3 08/06/86 069 Documentation Review of Epoxy Grout 2 10/08/86 070 Reinspection of Tubing Welds / Material /I-M-TUWM 2 03/19/86 1 08/06/86 2 09/26/86 071 Reinspection of Lighting Cable /I-E-LITG 1 01/28/86 1 11/07/86 072 Documentation Review of Lighting Cable /R-E-LITG 1 01/28/86 073 Documentation Review of Pipe Welds / Material 0 05/16/86 1 05/22/86 074 Documentation Review of NIS Cable Termination / 0 03/10/86 R-E-NIST 075 Reinspection of Piping Bends Fabrication 0 05/02/86 1 08/08/86 2 03/24/87 e
G
/\
s
_ _ _ .___ __-- a