ML20246D138

From kanterella
Revision as of 00:52, 14 February 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Insp Repts 50-498/89-13 & 50-499/89-13 on 890501-31.No Violations or Deviations Noted
ML20246D138
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 07/03/1989
From: Milhoan J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Goldberg J
HOUSTON LIGHTING & POWER CO.
Shared Package
ML20246D142 List:
References
NUDOCS 8907110241
Download: ML20246D138 (3)


See also: IR 05000498/1989013

Text

..- . _.

'

6

~

i Jll. - 31989

In Reply Refer To:

Dockets: 50-498/89-13

50-499/89-13

Houston Lighting & Power Company

ATTN: J. H. Goldberg, Group Vice

President, Nuclear

P. O. Box 1700

Houston, Texas 77001

Gentlemen:

This refers to the inspection conducted by Messrs. J. E. Bess, R. J. Evans,

J. I. Tapia, and D. L. Garrison during the period May 1-31, 1989, of activities

authorized by NRC Operating Licenses NPF-76 and NPF-80 for the South Texas t

Project, Units 1 and 2, and to the discussion of our findings with f

Mr. W. H. Kinsey and other members of your staff at the conclusion of the

inspection.

Areas examined during the inspection included plant status, onsite followup of

plant events, engineered safety feature system walkdown - Unit 2, monthly

maintenance observations - Unit 1, operational safety verification - Unit 1, I

monthly surveillance observations - Unit 1, balance of plant inspection -

Units 1 and 2, plant surveillance program - Units 1 and 2, loss of offsite

power test, and shutdown from outside the control room - Unit 2. Within these

areas, the inspection consisted of selective examination of procedures and

representative records, interviews with personnel, and observations by the NRC

inspectors.. The inspection findings are documented in the enclosed inspection

report.

Within the scope of the inspection, no violations or deviations were

identified.

We have also examined actions you have taken with regard to previously

identified inspection findings. The status of these items is identified in

paragraph 4 of the enclosed report.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

t

Sincerely, ]

Original Signed By:

James L. Milhoan

James L. M11hoan, Director

Division of Reactor Projects l

Encio es: (see next page) l

RI / RI ( C:DRP D: RP 0

JEBess/lr RJEvaks SRIk h DRP/D

RIV:SR

JIT[pi DLGarrison DMHunnic tt EJHoller JLHilhoan l

c g o/89 c,/3c/89 G /30/89 4./go/89 C/p/89 6/D/89 / 3 /89

l

M

8907110241 890703

{DR ADOCK 050004ps (@ j

PDC \ j

< - - - _

j

r, ,,

0

b

. . ". '

.

.; .

,

,

Houston Lighting & Power Company -2-

.

Enclosure: .

. ,"

~

'

Appendix - NRC Inspection Report

,

50-498/89-13

50-499/89-13

cc w/ enclosure:

Houston Lighting & Power Company

ATTN: M. A. McBurnett, Manager

Operations Support Licensing

,

, P.O. Box 289

Wadsworth, Texas 77483

Houston Lighting & Power Company

ATTN: Gerald E. Vaughn, Vice President

Nuclear Operations

P.O. Box 1700 *

Houston, Texas 77001

Houston Lighting & Power Company

ATTN: J. T. Westermeier, General Manager

'

South Texas Project

P.O. Box 289

Wadsworth, Texas 77483 i

Central Power & Light Company.

ATTN: R. L. Range /R. P. Verret

P.O. Box 2121  !

'

Corpus, Christi, Texas 78403

City of Austin Electric Utility '

ATTN: R. J. Miner, Chief Operating

Officer

721 Barton Springs Road i

Austin, Texas 78704

Newman & Holtzinger, P.C.

ATTN: J. R. Newman, Esquire

1615 L Street .N.W.

Washington, DC 20036 '

Houston Lighting & Power Company '

.'

ATTN: S. L. Rosen, General Manager

Operations Support j

P.O. Box 289 i

Wadsworth, Texas 77483

'

Houston Lighting & Power Company

ATTN: R.'W.~ Chewning, Chairman

Nuclear Safety Review Board

P.O. Box 289

Wadsworth, Texas 77483

'

1

i

_ _ _ _ _ _ _ _ _ _

J

~ '

i .~

.c

{E~ ]'i

?

, , . . .

. .

s'

Houston Lighting & Power Company -3-

,

City Public* Service Board

ATTN: ,R. J. Costello/M. T. Hardt

P.O. Box'1771

San Antonio, Texas 78296

Licensing Representative

Houston Lighting & Power Company

,

'

Suite 610

.Three Metro Center

Bethesda, Maryland 20814

i. -Texas Radiation Control Program Director

bec distrib. by RIV:

  • DRP "RRI
  • Section Chief (DRP/D) *DRS
  • MIS System *RPB-DRSS

Lisa Shea, RM/ALF *RIV File

R. Bachmann, OGC *RSTS Operator

  • G. Dick, NRR Project Manager (MS: 13-D-18)
  • Project Engineer (DRP/D) *R. D. Martin
  • w/766
  • bec to DMB IE01-

i

___-