ML20246D138
| ML20246D138 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 07/03/1989 |
| From: | Milhoan J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Goldberg J HOUSTON LIGHTING & POWER CO. |
| Shared Package | |
| ML20246D142 | List: |
| References | |
| NUDOCS 8907110241 | |
| Download: ML20246D138 (3) | |
See also: IR 05000498/1989013
Text
..
.
_.
-
6
Jll. - 31989
'
~
i
In Reply Refer To:
Dockets: 50-498/89-13
50-499/89-13
Houston Lighting & Power Company
ATTN:
J. H. Goldberg, Group Vice
President, Nuclear
P. O. Box 1700
Houston, Texas 77001
Gentlemen:
This refers to the inspection conducted by Messrs. J. E. Bess, R. J. Evans,
J. I. Tapia, and D. L. Garrison during the period May 1-31, 1989, of activities
authorized by NRC Operating Licenses NPF-76 and NPF-80 for the South Texas
t
Project, Units 1 and 2, and to the discussion of our findings with
f
Mr. W. H. Kinsey and other members of your staff at the conclusion of the
inspection.
Areas examined during the inspection included plant status, onsite followup of
plant events, engineered safety feature system walkdown - Unit 2, monthly
I
maintenance observations - Unit 1, operational safety verification - Unit 1,
monthly surveillance observations - Unit 1, balance of plant inspection -
Units 1 and 2, plant surveillance program - Units 1 and 2, loss of offsite
power test, and shutdown from outside the control room - Unit 2.
Within these
areas, the inspection consisted of selective examination of procedures and
representative records, interviews with personnel, and observations by the NRC
inspectors.. The inspection findings are documented in the enclosed inspection
report.
Within the scope of the inspection, no violations or deviations were
identified.
We have also examined actions you have taken with regard to previously
identified inspection findings. The status of these items is identified in
paragraph 4 of the enclosed report.
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
t
Sincerely,
]
Original Signed By:
James L. Milhoan
James L. M11hoan, Director
Division of Reactor Projects
l
Encio
es:
(see next page)
l
(
C:DRP
D: RP
0
SRIk
RI
h DRP/D
RIV:SR
RI /
JEBess/lr RJEvaks JIT[pi
DLGarrison DMHunnic tt EJHoller JLHilhoan
l
l
c g o/89 c,/3c/89 G /30/89
4./go/89
C/p/89
6/D/89
/ 3 /89
M
8907110241 890703
{DR
ADOCK 050004ps
(@
j
\\
j
< - - -
_
j
r,
,,
0
b
. . ".
'
. .;
.
,
,
Houston Lighting & Power Company
-2-
.
Enclosure: .
Appendix - NRC Inspection Report
. ,"
~
'
50-498/89-13
,
50-499/89-13
cc w/ enclosure:
Houston Lighting & Power Company
ATTN:
M. A. McBurnett, Manager
Operations Support Licensing
P.O. Box 289
,
,
Wadsworth, Texas 77483
Houston Lighting & Power Company
ATTN: Gerald E. Vaughn, Vice President
Nuclear Operations
P.O. Box 1700
Houston, Texas 77001
Houston Lighting & Power Company
ATTN:
J. T. Westermeier, General Manager
South Texas Project
'
P.O. Box 289
Wadsworth, Texas 77483
i
Central Power & Light Company.
ATTN:
R. L. Range /R. P. Verret
P.O. Box 2121
!
'
Corpus, Christi, Texas 78403
City of Austin Electric Utility
'
ATTN:
R. J. Miner, Chief Operating
Officer
721 Barton Springs Road
i
Newman & Holtzinger, P.C.
ATTN:
J. R. Newman, Esquire
1615 L Street .N.W.
'
Washington, DC 20036
Houston Lighting & Power Company
'
. '
ATTN:
S. L. Rosen, General Manager
Operations Support
j
P.O. Box 289
i
Wadsworth, Texas 77483
Houston Lighting & Power Company
'
ATTN:
R.'W.~ Chewning, Chairman
Nuclear Safety Review Board
P.O. Box 289
Wadsworth, Texas 77483
'
1
i
_ _ _ _ _ _ _ _ _ _
J
{E~ ]'
~
'
i .~
.c
i
?
.
.
, , . . .
s'
Houston Lighting & Power Company
-3-
,
City Public* Service Board
ATTN:
,R. J. Costello/M. T. Hardt
P.O. Box'1771
San Antonio, Texas 78296
Licensing Representative
Houston Lighting & Power Company
,
Suite 610
'
.Three Metro Center
Bethesda, Maryland 20814
i.
-Texas Radiation Control Program Director
bec distrib. by RIV:
- DRP
"RRI
- Section Chief (DRP/D)
- DRS
- MIS System
- RPB-DRSS
Lisa Shea, RM/ALF
- RIV File
R. Bachmann, OGC
- RSTS Operator
- G. Dick, NRR Project Manager (MS:
13-D-18)
- Project Engineer (DRP/D)
- R. D. Martin
- w/766
- bec to DMB IE01-
i
___-