Forwards Safety Insp Rept 50-213/86-22 on 860722-25.Concern Expressed Re Radiation Protection Program Breakdowns Resulting in Worker Exceeding NRC Quarterly Whole Body Exposure Limit
ML20206P108
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 08/19/1986
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Opeka J
CONNECTICUT YANKEE ATOMIC POWER CO.
Shared Package
ML20206P113 List:
References
NUDOCS 8608270097
Download: ML20206P108 (2)


See also: IR 05000213/1986022

Text

-

.

.

,

AUG 191986

Docket No. 50-213

.

Connecticut Yankee Atomic Power Company

ATTN: Mr. J. F. Opeka

Senior Vice President - Nuclear

Engineering and Operations Group

. P. G. Box 270

Hartford, Connecticut 06101

.

Gentlemen:

Subject: Inspection Report No. 50-213/86-22

A routine safety inspection was conducted on July 22-25, 1986, to evaluate the

radiological prctection program implemented c.uring steam generator eddy current

testing and tube plugging at Haddam Neck teclear Power Plant. The inspectors

reviewed aspects of the radiation protection program that are described in the

NRC Region I Inspection Report enclosed wi'.h this letter.

Within the scope of the inspection, it appears that some of your activities

were not conducted in full compliance with regulatory requirements. Radiation

protection program breakdowns resulted in a worker exceeding the NRC quarterly ,

whole body exposure limit. Apparent violations are discussed in the enclosed

report. We have scheduled an, Enforcement Conference in the Region I office for

September 3, 1986 at 3:00 PM to discuss these matters with you. The need for

and the nature of appropriate enforcement action for the apparent violations

will be the subject of separate correspondence at a later date.

Your cooperation with us in this matter is appreciated.

Sincerely,

'

OTAB Lual Sicned B :

7

Thomas T. Martin, Director

Division of Radiation Safety

and Safeguards

'

Enclosure: NRC Region I Inspection Report No. 50-213/86-22

8609270097 860819

PDR ADOCK 05000213

G PDR

,

OFFICIAL RECORD COPY IR HN 86-22 - 0001.0.0

08/19/86

'

,

r

N

.

I l

.

. .

.

Connecticut Yankee Atomic. Power Co. 2 ,

cc w/ encl:

R. Graves, Plant Superintendent

D. O. Nordquist, Manager of Quality Assurance

, R. T. Laudenat, Manager, Generation Facilities Licensing

E. J. Mroczka, Vice President, Nuclear Operations

Gerald Ga-rfield, Esquire

Public Document Room (POR)

Local Public Document Room (LPOR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of Connecticut

bec w/ encl:

Region.I Docket Room (with concurrences)

Management Assistant, ORMA (w/o encl)

Section Chief, DRP

M. McBride, RI, Pilgrim

J. Shediosky, SRI, Millstone 1&2 '

T. Rebelowski, SRI, Millstone 3

J. Akstulev!icz, LPM, NRR

Robert J. Bores, DRSS

,

.

'

.

.

4

RI:0RSS RI:CRSS RI:0RSS I:DRSS RI RSS

LeQuia/mjd Weadock Bella y f riin

Shangj

8/15I/86 8/if/86 8//5'/86 8//5'/86 8//'//86

0FFICIAL RECORD COPY IR HN 86-22 - 0002.0.0

08/14/86

_

h

. _ _ _ _ _ _