Part 21 & Deficiency Rept Re Valves Installed Opposite to Direction of Flow.Initially Reported on 880601.Investigation in Progress to Determine Full Scope of Condition.Final Rept Will Be Submitted by 881001
ML20196L481
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 07/07/1988
From: Rice P
GEORGIA POWER CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
REF-PT21-88-078-000 GN-1466, PT21-88-078-000, PT21-88-78, NUDOCS 8807070522
Download: ML20196L481 (1)


Text

. g* Georgia Power Corrpany -

Post Office Box 282 Waynesboro, Georg.a 30830 Telephone 404 554-990f, Extension 3413 404 724-8114 E> tension 3413 m

P. D. Ric. Georgia Power

$e 7$ll,

we scan entre satem U. S. Nuclear Regulatory Ccnnission Attn: Document Control Desk File: X78G03-M144 Washington, D. C. 20555 Log: GN-1466

Reference:

Vogtle Electric Generating Plant - Unit 2; 50-425 Valves Installed Opposite to Direction of Flow (M144)

On June 1, 1988 Mr. C. W. Hayes, Vogtle Quality Assurance Manager, notified Mr. Charles Patterson, USNRC-Region II, of a potentially reportable condition as defined by the reporting requirements of 10CFR50.55(e). This condition involved Unit 2 valves which were installed opposite to the direction of flow.

During start-up testing it was discovered that several valves in Unit 2 had been installed opposite to the direction of flow. Three (3) Dresser Industries one inch check valves were found with the metal stamped flow arrows on the valves pointing in the wrong direction. This led to the installation of the valves in the direction opposite to the direction of system flow. Twenty-one other valves have been found installed opposite to the direction of flow due to the piping isometrics not clearly or correctly showing the intended direction of flow. ,

An investigation is in process to determine the full scope of this condition on Unit 2. Georgia Power's final report on this issue is scheduled to be submitted to the NRC prior to October 1, 1988.

This correspondence contains no proprietary information and may be placed in the NRC Public Document Room.

P. D. Rice M

PDR/sem xc: USNRC - Region II Suite 2900 101 Marietta Street, N. W.

Atlanta, GA 30323 H. G. Baker, Jr. D. R. Altman L. T. Gucwa R. P. Mcdonald J. A. Bailey C. W. Hayes R. H. Pinson G. Bockhold, Jr. R. W. McManus E. D. Groover G. R. Frederick Sr. Resident (NRC)

C. T. Moore R. A. Thomas J. E. Swartzwelder D. H. Smith (OPC)

A. B. Gallant J. E. Joiner (TSLA)

NORMS

  1. A} i p ,

8807070522 880707 PDR ADOCK 05000425 S PDC