Site: | Pilgrim, Seabrook, 05000000 |
Issue date: | 11/08/1988 |
From: | Varga S Office of Nuclear Reactor Regulation |
To: | Shiff P AFFILIATION NOT ASSIGNED |
Shared Package | |
ML20206D892 | List: |
References | |
NUDOCS 8811170311 | |
Download: ML20206D887 (1) | |
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217M8771999-10-25025 October 1999
[Table view]Requests That Industry Studies on long-term Spent Fuel Pool Cooling Be Provided to R Dudley at Listed Mail Stop ML20217M4331999-10-19019 October 1999 Submits Rept 17, Requal Tracking Rept from Operator Tracking Sys. Rept Was Used by NRC to Schedule Requalification Exams for Operators & Record Requal Pass Dates ML20217N8911999-10-15015 October 1999 Forwards Rept of Changes,Tests & Experiments at Pilgrim Nuclear Power Station for Period of 970422-990621,IAW 10CFR50.59(b).List of Changes Effecting Fsar,Encl ML20217D3951999-10-13013 October 1999 Forwards Request for Addl Info Re Util 990806 Submittal on USI A-46, Implementation Methodology Used at Pilgrim Nuclear Power Station, Per GL 87-02 ML20217F5811999-10-13013 October 1999 Forwards Insp Data & Naesco Evaluation of a EDG Exhaust Insp Conducted on 990407.Insp Ensured That Unacceptable Wall Thinning Will Not Occur During 40-year Design Lifetime of Sys ML20217F5841999-10-13013 October 1999 Requests Revocation of License OP-11038-1 for GE Kingsley. Individual Has Been Reassigned to Position within Naesco ML20217C7321999-10-0808 October 1999 Forwards Copy of Seabrook Station Videotape Entitled, Completion of Seal Barrier Installation. Videotape Documents Process of Selecting,Designing & Installing Seal Deterrent Barrier to Preclude Entrapment of Seals ML20217E1581999-10-0808 October 1999 Forwards Insp Rept 50-293/99-05 on 990726-0905.Three Violations Noted & Being Treated as Ncvs.Violations Include Failure to Assure That Design Bases Correctly Translated Into Specifications ML20217C3151999-10-0606 October 1999 Forwards Scenario Package for Pilgrim Nuclear Power Station Nrc/Fema Evaluated Exercise Scheduled for 991207.Without Encl ML20217C8051999-10-0505 October 1999 Forwards Proprietary Results of Audiologic Evaluations for Jp Giar,License SOP-10061-3.Attachment Clearly Shows Requirements for Operator Hearing Ability Are Met. Proprietary Info Withheld,Per 10CFR2.790(a)(6) ML20217D5591999-10-0505 October 1999 Documents Pilgrim Nuclear Power Station Five Yr Survey of Main Breakwater.Survey Has Determined That Pilgrim Main Breakwater Is Intact & Remains Adequately Constructed to Perform Designed Safety Function ML20217B8621999-10-0505 October 1999 Forwards Rev 28,change 1 to EPIP Er 1.1, Classification & Emergencies, Per 10CFR50.54(q).Rev to Procedure Does Not Decrease Effectiveness of Seabrook Station Radiological Emergency Plan ML20217B7471999-10-0101 October 1999 Provides Notification of Change in PCT of More than 50 F,Per Requirements of 10CFR50.46(a)(3)(i),(ii).Tabulation of Large Break LOCA PCT Margin Utilization Applicable to Seabrook Station,Encl ML20216J2471999-09-30030 September 1999 Responds to Which Provided Comments on NRC Interim Enforcement Policy Re Enforcement Discretion for Nuclear Plants During Y2K Transition.Informs That Naesc Reported Seabrook as Y2K Ready Prior to 990701 ML20216J2421999-09-30030 September 1999 Responds to Card Received in Aug 1999,providing Comments on NRC Interim Enforcement Policy Re Enforcement Discretion for Nuclear Plants During Y2K Transition.Informs That Naesc Reported Seabrook as Y2K Ready Prior to 990701 ML20216J2381999-09-30030 September 1999 Responds to Re Enforcement Discretion for Nuclear Plants During Y2K Transition.Nrc Expects All Licensees to Operate Nuclear Facilities Safety IAW NRC Regulations & Requirements ML20212K7921999-09-30030 September 1999 Confirms 990922 Telcon with J D'Antonio & T Grew Re Arrangements Made for NRC to Inspect Licensed Operator Requalification Program at Seabrook Facility ML20212J8271999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of Seabrook Station. Staff Conducted Reviews for All Operating NPPs to Integrate Performance Info & to Plan for Insp Activities at Facility Over Next Six Months.Plant Issues Matrix & Insp Plan Encl ML20212J8301999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of Pilgrim Nuclear Power Station.Staff Conducts Reviews for All Operating NPPs to Integrate Performance Info & to Plan Insp Activities at Facility Over Next Six Months ML20216J9961999-09-29029 September 1999 Forwards Resume of Person Identified as Acting RPM in Licensee to NRC Re Notification That Person Named in License Condition 11 of 20-07626-02,is No Longer Employed at Pilgrim Station.Resume Withheld,Per 10CFR2.790 ML20212F7871999-09-24024 September 1999 Advises That Util 990121 Application for Amend Being Treated as Withdrawn.Proposed Changes Would Have Modified Facility UFSAR Pertaining to Values for post-accident Containment Pressure Credited in Pilgrim Net Positive Head Analyses ML20212J0301999-09-24024 September 1999 Forwards Insp Rept 50-443/99-10 on 990726-30 & 0809-13.No Violations Noted.Insp Discussed ML20212H1381999-09-23023 September 1999 Submits Info in Support of Request Filed on 990730 to Grant one-time Exemption from 10CFR50,App E,Authorizing Biennial Full Participation Emergency Preparedness Exercise to Be Conducted in 2002 Instead of 2001 ML20212H1441999-09-23023 September 1999 Withdraws 990121 Request for License Change Re Emergency Core Cooling Sys Net Positive Suction Head,Due to Incorrect Datum Preparation ML20212G5071999-09-21021 September 1999 Submits Complaint to NRC Re NRC Failure to Cite Seabrook Station NPP Operators for Failing to Periodically Calibrate & Establish Adequate Measures to Insure That Relay Equipment Met All Required Calibration Settings Prior to Installation ML20212C1881999-09-20020 September 1999 Ack Receipt of Which Raised Concerns Re NRC Enforcement Actions at Plant & Issuance of NCVs ML20212D1401999-09-17017 September 1999 Forwards SE Accepting Request to Use Proposed Alternative to Certain Weld Repair Requirements in ASME Boiling & Pressure Vessel Code ML20212B9511999-09-17017 September 1999 Forwards NRC Form 396 for MG Sketchley,License SOP-10685, Along with Supporting Medical Exam Info.Nrc Form 396 Has Been Superceded by Revised Version Dtd 971222,which Was Previously Submitted to NRC on 990812.Encl Withheld ML20212C2861999-09-16016 September 1999 Forwards SER Accepting Licensee 981123 Request for Relief RR-E1,RR-E5,RR-E6 Pursuant to 10CFR50.55a(a)(3)(i) & Request for Relief RR-E2,RR-E3 & RR-E4 Pursuant to 10CFR50.55a(a)(3)(ii) ML20216F3451999-09-16016 September 1999 Forwards Summary Rept Providing Results of ISI Conducted at PNPS on-line & Refueling Outage (RFO 12) ML20212C3621999-09-15015 September 1999 Forwards Rev 34 to Seabrook Station Radiological Emergency Plan & Rev 85 to Seabrook Station Emergency Response Manual, Per 10CFR50,App E & 10CFR50.4 ML20212B5021999-09-14014 September 1999 Forwards Licensee Responses to EPA Questions Re Plant Seal Deterrent Barrier.Util Completed Installation of Subject Barriers on All Three Station Offshore Intake Structures on 990818.Barriers Will Preclude Entrapment of Seals ML20216E7111999-09-0909 September 1999 Forwards License Renewal Application Including Form NRC-398 & Form NRC-396 for Jp Giar,License SOP-10061-3.Without Encls ML20211Q8521999-09-0808 September 1999 Informs That Rl Couture,License SOP-11027,terminated Employment at Naesco on 990907.Revocation of License Requested ML20216E5891999-09-0707 September 1999 Forwards Copy of Pilgrim Station Organization Structure. Encl Refelcts Changes in Upper Mgt Level Structure.Changes Were Effective 990901 ML20211M4501999-09-0303 September 1999 Informs That Pilgrim Nuclear Power Station Plans to Conduct Full Participation Emergency Preparedness Exercise with Commonwealth of Ma on 991207,IAW 10CFR50,App E,Section IV.F.2 ML20211J9291999-09-0303 September 1999 Forwards mark-ups & Retypes of Proposed Conforming License Changes Required in Connection with Transfers Being Sought in 990615 Application of Montaup Electric Co & New England Power Co for Transfer of Licenses & Ownership Interests ML20211N8781999-09-0303 September 1999 Forwards Response to 990820 RFI Re NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams DD-99-10, Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision (DD-99-10) Expired.Commission Declined Review & Decision Became Final on 990830.With Certificate of Svc.Served on 9909021999-09-0202 September 1999 Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision (DD-99-10) Expired.Commission Declined Review & Decision Became Final on 990830.With Certificate of Svc.Served on 990902 ML20211M3221999-09-0202 September 1999 Responds to NRC Re Violations Noted in Insp of License NPF-86 & Proposed Imposition of Civil Penalty. Corrective Actions:Conducted Prompt Review of Layoff Decision to Determine Relevant Facts ML20211J8811999-09-0101 September 1999 Forwards Comments on Seabrook Station Review of Reactor Vessel Integrity Database (Rvid)(Version 2).Minor Discrepancies Were Noted.Proposed Changes Are Encl in Order to Correct Discrepancies ML20211J8411999-09-0101 September 1999 Forwards Updated NRC Form 396 for E Decosta,Nrc License OP-10655-1.Without Encl ML20211M9161999-08-31031 August 1999 Submits Review & Correction of Info in Reactor Vessel Integrity Database (Rvid),Version 2,re Pilgrim Station ML20211J8391999-08-30030 August 1999 Forwards Rev 1 to Provisional Decommissioning Trust Agreement for Plant,Changing Portions of Agreement to Permit Up to Two Distributions & Clarify Formula for Distribution ML20211H5701999-08-27027 August 1999 Forwards Insp Rept 50-293/99-04 on 990610-0725.Two Violations Identified Being Treated as non-cited Violations ML20211G9191999-08-27027 August 1999 Informs NRC That Name of New Company, Ref in Order Approving Application Re Corporate Merger Is Nstar Which Is Massachusetts Business Trust ML20211J0401999-08-26026 August 1999 Responds to 990819 Request,On Behalf of Gr Pageau & Williams Power Corp,For Addl Time in Which to Reply to Nov,Issued on 990803.Response Due to NRC by 991008 ML20211H0651999-08-25025 August 1999 Forwards Insp Rept 50-443/99-05 on 990621-0801.One Violation Re Failure to Include Multiple Components within Scope of ISI Test Program Was Identified & Being Treated as NCV, Consistent with App C of Enforcement Policy ML20211G7761999-08-24024 August 1999 Expresses Great Concern Re Lack of Enforcement Actions Against Seabrook Station Despite Citations NRC Has Issued for Violations of Seabrook Operating License ML20211J2171999-08-23023 August 1999 Expresses Disappointment with Lack of Enforcement Action Against Seabrook Station Despite Repeated Safety Violations 1999-09-09 Category:NRC TO PUBLIC ENTITY/CITIZEN/ORGANIZATION/MEDIA MONTHYEARML20058C1231990-10-18018 October 1990
[Table view]Responds to Which Objected to NRC Response to Inspector General Rept 90-N02 Re Emergency Preparedness. Special Task Force Established to Review Comments & Documents Presented at 900906 Meeting DD-90-05, Advises That Time Provided for Commission to Review Director'S Decision DD-90-05 Expired.Commission Declined Review & Decision Became Final Agency Action on 901001. W/Certificate of Svc.Served on 9010121990-10-11011 October 1990 Advises That Time Provided for Commission to Review Director'S Decision DD-90-05 Expired.Commission Declined Review & Decision Became Final Agency Action on 901001. W/Certificate of Svc.Served on 901012 ML20059H3711990-09-0505 September 1990 Responds to Sent to M Miller Re Actions Taken by Util to Install Tanks on Property Adjoining Power Station. Tanks Being Installed as Part of Sewage Leach Field Sys for New Waste Treatment Facility.Nrc Has No Concerns Re Tanks DD-90-04, Informs That Time Provied by NRC Regulation within Which Commission May Act to Review Director'S Decision DD-90-04 Expired.Commission Declined Review & Decision Became Final Action on 900803.W/Certificate of Svc.Served on 9008141990-08-14014 August 1990 Informs That Time Provied by NRC Regulation within Which Commission May Act to Review Director'S Decision DD-90-04 Expired.Commission Declined Review & Decision Became Final Action on 900803.W/Certificate of Svc.Served on 900814 ML20058M3261990-08-0909 August 1990 Responds to Re Fr Notices to Amend OL for Plant. Plant Request Consistent W/Previously Approved Requests Re BWRs & BWR Sts.Most Other BWRs Perform Logic Sys Functional Test Once Per 18 Months ML20056B1841990-08-0202 August 1990 Advises That Aslab Cannot Accept P Pierce-Bjorklund 900730 Submission,Seeking to Appeal 900709 Director'S Decision DD-90-4.W/Certificate of Svc.Served on 900803 ML20055G7841990-07-19019 July 1990 Responds to Enclosing Article from Providence Journal Which Stated That Plant Could Operate at No More than 65% of Power While Recirculation Pump Working.License Condition Does Not Permit Continuous Single Loop Operation ML20055G3261990-07-13013 July 1990 Responds to to AR Blough Concerning NRC Findings of Reasonable Assurance Re Emergency Preparedness at Plant. Reasonable Assurance Exists Now & Existed When NRC Permitted Initiation of Power Ascension Program Above 5% Power ML20055F0541990-06-19019 June 1990 Final Response to FOIA Request.App C Records Encl & Available in PDR ML20055C7291990-05-31031 May 1990 Forwards Response to Questions Raised in 900226 & 0325 Ltrs Re Plant First 10-yr Interval Inservice Insp Program Plan ML20248J3651989-10-13013 October 1989 Comely Ltrs to I Smith, & Chilk, .* Advises That Listed Documents Reviewed by Seabrook ASLB & Will Be Placed in Pdr.Served on 891013 IA-89-409, Final Response to FOIA Request.App a & B Records Available in PDR & Encl.Portions of App B Record Withheld (Ref FOIA Exemption 6)1989-09-26026 September 1989 Final Response to FOIA Request.App a & B Records Available in PDR & Encl.Portions of App B Record Withheld (Ref FOIA Exemption 6) ML20247R3361989-09-26026 September 1989 Final Response to FOIA Request.App a & B Records Available in PDR & Encl.Portions of App B Record Withheld (Ref FOIA Exemption 6) ML20247J0561989-09-13013 September 1989 Responds to Suggestion Re Establishment of Natl Control Ctr to Monitor Cooling Water Temp of Nuclear Reactors. Establishing Natl Control Ctr to Monitor Reactor Coolant Temps of All Reactors Would Not Provide Added Safety Margin ML20246Q0711989-09-0101 September 1989 Ack Receipt of Re Plant Augumented Insp Team Rept on Natural Circulation Test at Facility.Augmented Insp Team Rept Will Not Be Changed & Further Interview W/Recipient Not Planned ML20246A8591989-08-17017 August 1989 Final Response to FOIA Request.Partially Withheld App a Document Re Confirmatory Action Ltr 89-11 Encl & Available in PDR (Ref FOIA Exemption 5) ML20245G4311989-08-11011 August 1989 Final Response to FOIA Request for Documents.Forwards App a Documents Also Available in PDR ML20247F0481989-07-25025 July 1989 Partial Response to FOIA Request for Records.App L Record Available in Pdr.App M Records Partially Withheld Ref (FOIA Exemption 7).App N Record Provided to Requestor But Not Made Publicly Available at This Time ML20245B3881989-06-15015 June 1989 Responds to Re Flow & Pressure Drop Calculations for RWCU & Feedwater & Condensate Sample Panels.Util Actions Do Not Have Adverse Impact on Nuclear Reactor Safety to Extent That Protection of Safety of Environ Affected ML20245A8151989-06-14014 June 1989 Responds to 890515 Request for Info Re 880412 RCIC Sys Event.Augmented Insp Team Concluded That Transient Minor Since Several Barriers Remained Intact to Mitigate Effects of Potential Intersystem Loss of Coolant ML20245B4531989-06-0808 June 1989 Forwards Encl Listed Info on Decommissioned & Shutdown Reactors Requested During Discussions at Saxton on 890511 ML20244C3221989-06-0707 June 1989 Responds to Re Conversion of Plant & Production of Pollution Free Power.Doe Should Be Contacted for Info Re Research Programs Associated W/Alternative Energy Sources DD-89-03, Advises That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision DD-89-03 Expired.Commission Declined Review.Decision Became Final Action on 890522.W/Certificate of Svc.Served on 8906061989-06-0606 June 1989 Advises That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision DD-89-03 Expired.Commission Declined Review.Decision Became Final Action on 890522.W/Certificate of Svc.Served on 890606 ML20246P6791989-05-0202 May 1989 Responds to Questions in Re Liability & Responsibility Requirements Under Price-Anderson Act.State of Ma Civil Defense Agency or FEMA Should Be Contacted Re Draft Implementing Procedures for Duxbury,Ma ML20244D6521989-04-17017 April 1989 Responds to to Chairman Zech Re Concerns W/Status of Emergency Preparedness at Facility.Commission Continues to Endorse Deliberate,Phased Startup Program,Over 4 to 6 Month Period,W/Augmented NRC Oversight ML20245B4051989-04-14014 April 1989 Responds to 881004 & 890119,23 & 0310 Ltrs Re Status of Investigation of Concerns About Corrosion Inhibitors & Design of Sampling Sys.Low Velocity of Liquid in Hotwell Sampling Considered Satisfactory ML20245C1501989-03-30030 March 1989 Forwards NRC Biweekly Status Insp Repts of Plant in Response to 890315 Article Re Lapse in NRC Insp Coverage.W/O Encl ML20247F6481989-03-30030 March 1989 Ack Receipt of Info Sent in Transmittal Postmarked 890218 Re NRC TLD Direct Radiation Monitoring Network ML20246M4591989-03-10010 March 1989 Responds to to Vice President Bush Re Personal Safety If Facility Permitted to Restart.Resumption of Power Dependent on Satisfactory Demonstration of Required Improvements in Emergency Preparedness ML20235R3601989-02-23023 February 1989 Discusses Review of Current Status of Licensee Power Ascension Test Program & Specific Issues Identified During 880408 Mgt Meeting ML20246N1521989-02-22022 February 1989 Responds to Re Amended Indemnity Agreement W/ Utils to Permit Storage of Spent Nuclear Fuel.Fr Notice Encl ML20206D9201988-11-0909 November 1988 Responds to Re NRC 880331 Response to Questions Raised Concerning Conditions at Plants & Recipient Proposal to Station Senior Operator in Control Room at All Nuclear Plants to Oversee Plant Operations ML20206D8871988-11-0808 November 1988 Responds to 881015 Postcard Recommending Keeping Seabrook & Pilgrim Facilities Closed & Question Re Nuclear Waste Disposal.Two Levels of Waste for Commercial Nuclear Power Plants Considered ML20195G2121988-11-0808 November 1988 Final Response to FOIA Request for Documents.Forwards App D Document & Releasable Portions of Documents E/1 Through E/3. App D & Releasable Portions of Documents E/4 Through E/6 Available in Pdr.Portions Withheld (Ref FOIA Exemption 5) ML20195G5361988-11-0808 November 1988 Final Response to FOIA Request for Documents.Forwards App a Documents.App a Documents Also Available in PDR ML20205S0951988-11-0707 November 1988 Responds to 881015 Concerns Re Proposed Restart of Plant. Chairman Zech to P Agnes Re Expulsion from Meeting Encl ML20206B3011988-11-0303 November 1988 Forwards Util Description of Safety Enhancement Program, NRC Initial Assessment,Request for Addl Info & Util Revised Info Re Direct Torus Vent Sys,Per 881004 Discussion.W/O Encls ML20205L9451988-10-28028 October 1988 Forwards Rept, Seabrook Yrs, Per 881019 Telcon Request ML20205F6921988-10-27027 October 1988 Advises That NRC Brief Responding to New England Coalition on Nuclear Pollution Appeal of Board 880808 Memorandum & Order Must Be Filed No Later than 881107.ASLAB Deferring Determination Re Hearing Oral Argument.Served on 881027 ML20205S3841988-10-13013 October 1988 Partial Response to FOIA Request for Documents.App D,E & F Records Encl & Available in Pdr.App F Records Partially Withheld (Ref FOIA Exemption 6) ML20155E5691988-10-0404 October 1988 Responds to to President Reagan Re Substandard Piping Fixtures,Unqualified Inspector Concern & Thoroughness of Licensee Insp to Determine Counterfeit Bolts.Nrc Issued NRC Bulletin 88-005 Concerning Problem ML20154P9021988-09-27027 September 1988 Forwards NRC Restart Assessment Panel Restart Readiness Assessment Rept for Facility.W/O Encl ML20154Q3271988-09-27027 September 1988 Forwards Restart Readiness Assessment Rept for Facility,For Public Availability.W/O Encl ML20154Q3091988-09-27027 September 1988 Forwards Restart Readiness Assessment Rept for Facility. W/O Encl ML20154Q2811988-09-27027 September 1988 Forwards Restart Readiness Assessment Rept for Facility. W/O Encl ML20205A5301988-09-20020 September 1988 Final Response to FOIA Request.App a Documents Encl & Available in PDR IA-88-443, Final Response to FOIA Request.App a Documents Encl & Available in PDR1988-09-20020 September 1988 Final Response to FOIA Request.App a Documents Encl & Available in PDR ML20154Q2451988-09-15015 September 1988 Forwards Integrated Assessment Team Insp Rept 50-293/88-21 on 880808-24 & SALP Rept 50-293/87-99 for 870201-880515 & Transcript from ACRS 880826 Meeting for Public Review.W/O Encls ML20154Q1571988-09-15015 September 1988 Forwards Integrated Assessment Team Insp Rept 50-293/88-21 on 880808-24 & SALP Rept 50-293/87-99.Transcript of ACRS 880826 Meeting Also Encl.W/O Encls ML20154P8861988-09-15015 September 1988 Forwards Integrated Assessment Team Insp Rept 50-293/88-21 on 880808-24,SALP Rept 50-293/87-99 for 870201-880515 & Transcript of ACRS 880826 Meeting in Plymouth,Ma & 880908 Meeting in Bethesda,Md Re Plant Restart.W/O Encls 1990-09-05 Category:OUTGOING CORRESPONDENCE MONTHYEARML20217M8771999-10-25025 October 1999
[Table view]Requests That Industry Studies on long-term Spent Fuel Pool Cooling Be Provided to R Dudley at Listed Mail Stop ML20217M4331999-10-19019 October 1999 Submits Rept 17, Requal Tracking Rept from Operator Tracking Sys. Rept Was Used by NRC to Schedule Requalification Exams for Operators & Record Requal Pass Dates ML20217D3951999-10-13013 October 1999 Forwards Request for Addl Info Re Util 990806 Submittal on USI A-46, Implementation Methodology Used at Pilgrim Nuclear Power Station, Per GL 87-02 ML20217E1581999-10-0808 October 1999 Forwards Insp Rept 50-293/99-05 on 990726-0905.Three Violations Noted & Being Treated as Ncvs.Violations Include Failure to Assure That Design Bases Correctly Translated Into Specifications ML20212J8301999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of Pilgrim Nuclear Power Station.Staff Conducts Reviews for All Operating NPPs to Integrate Performance Info & to Plan Insp Activities at Facility Over Next Six Months ML20212K7921999-09-30030 September 1999 Confirms 990922 Telcon with J D'Antonio & T Grew Re Arrangements Made for NRC to Inspect Licensed Operator Requalification Program at Seabrook Facility ML20212J8271999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of Seabrook Station. Staff Conducted Reviews for All Operating NPPs to Integrate Performance Info & to Plan for Insp Activities at Facility Over Next Six Months.Plant Issues Matrix & Insp Plan Encl ML20216J2381999-09-30030 September 1999 Responds to Re Enforcement Discretion for Nuclear Plants During Y2K Transition.Nrc Expects All Licensees to Operate Nuclear Facilities Safety IAW NRC Regulations & Requirements ML20216J2421999-09-30030 September 1999 Responds to Card Received in Aug 1999,providing Comments on NRC Interim Enforcement Policy Re Enforcement Discretion for Nuclear Plants During Y2K Transition.Informs That Naesc Reported Seabrook as Y2K Ready Prior to 990701 ML20216J2471999-09-30030 September 1999 Responds to Which Provided Comments on NRC Interim Enforcement Policy Re Enforcement Discretion for Nuclear Plants During Y2K Transition.Informs That Naesc Reported Seabrook as Y2K Ready Prior to 990701 ML20212F7871999-09-24024 September 1999 Advises That Util 990121 Application for Amend Being Treated as Withdrawn.Proposed Changes Would Have Modified Facility UFSAR Pertaining to Values for post-accident Containment Pressure Credited in Pilgrim Net Positive Head Analyses ML20212J0301999-09-24024 September 1999 Forwards Insp Rept 50-443/99-10 on 990726-30 & 0809-13.No Violations Noted.Insp Discussed ML20212C1881999-09-20020 September 1999 Ack Receipt of Which Raised Concerns Re NRC Enforcement Actions at Plant & Issuance of NCVs ML20212D1401999-09-17017 September 1999 Forwards SE Accepting Request to Use Proposed Alternative to Certain Weld Repair Requirements in ASME Boiling & Pressure Vessel Code ML20212C2861999-09-16016 September 1999 Forwards SER Accepting Licensee 981123 Request for Relief RR-E1,RR-E5,RR-E6 Pursuant to 10CFR50.55a(a)(3)(i) & Request for Relief RR-E2,RR-E3 & RR-E4 Pursuant to 10CFR50.55a(a)(3)(ii) DD-99-10, Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision (DD-99-10) Expired.Commission Declined Review & Decision Became Final on 990830.With Certificate of Svc.Served on 9909021999-09-0202 September 1999 Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision (DD-99-10) Expired.Commission Declined Review & Decision Became Final on 990830.With Certificate of Svc.Served on 990902 ML20211H5701999-08-27027 August 1999 Forwards Insp Rept 50-293/99-04 on 990610-0725.Two Violations Identified Being Treated as non-cited Violations ML20211J0401999-08-26026 August 1999 Responds to 990819 Request,On Behalf of Gr Pageau & Williams Power Corp,For Addl Time in Which to Reply to Nov,Issued on 990803.Response Due to NRC by 991008 ML20211H0651999-08-25025 August 1999 Forwards Insp Rept 50-443/99-05 on 990621-0801.One Violation Re Failure to Include Multiple Components within Scope of ISI Test Program Was Identified & Being Treated as NCV, Consistent with App C of Enforcement Policy ML20211F2681999-08-19019 August 1999 Discusses Former Chairman Jackson & 990602 Predecisional Enforcement Conference Re Findings of Ofc of Investigations Involving Allegations Raised by Contract Electrician.Determined That Allegations Not Supported ML20210U5761999-08-18018 August 1999 Responds to Opposing Merger of Bec Energy & Commonwealth Energy Sys in Commonwealth of Massachusetts. Informs That for Sale,Nrc Responsible for Only Ensuring That Entergy Technically & Financially Qualified to Operate NPP ML20210U6691999-08-18018 August 1999 Forwards from Massachusetts State Senator T Murray Opposing Merger Between Bec Energy & Commonwealth Energy Systems ML20210U7521999-08-18018 August 1999 Forwards from Massachusetts State Senator T Murray Opossing Merger Between Bec Energy & Commonwealth Energy Systems ML20210U5151999-08-17017 August 1999 Forwards Notice of Withdrawal of Application for Approval of Indirect Transfer of FOL for Pilgrim in Response to .Approval No Longer Needed Since Beco Sold Interest in Pilgrim to EOI on 990713 ML20210S9511999-08-13013 August 1999 Responds to to Collins Expressing Concerns with Certain Terms of Proposed Merger Between New England Electric Sys & National Grid Group.Nrc Has No Authority to Interject Itself in Nees Merger with National Grid Group ML20210S9611999-08-13013 August 1999 Informs That NRC Received Encl Ltr from Pb Johnston Expressing Concern About Certain Impacts on Shareholders of New England Electric Sys with Respect to Nees Proposed Merger with Natl Grid Group ML20210T1601999-08-13013 August 1999 Informs That as Result of Staff Review of Licensee Responses to GL 92-01,rev,supp1 1, Reactor Vessel Structural Integrity, NRC Revised Info in Reactor Vessel Integrity Database & Is Releasing It as Rvid Version 2 ML20210Q7441999-08-11011 August 1999 Forwards Order Approving Indirect Transfer of Control of Canal Interest in Seabrook Station Unit 1 as Requested in Application & SER ML20210J8421999-08-0303 August 1999 Forwards Order,Conforming Amend & SER in Response to Application Transmitted by Util Under Cover Ltr , & Suppl by Ltrs & 0407 Requesting Approval of Transfer of License NPF-86 ML20210N5721999-08-0303 August 1999 Discusses Investigations Rept 1-98-005 Conducted by OI at Naesco,Seabrook Station & Forwards NOV & Proposed Imposition of Civil Penalty - $55,000.Violation Re Failure to Promptly Correct Incorrectly Terminated Cables of Control Bldg Air ML20210P3161999-08-0303 August 1999 Discusses Investigation Rept 1-98-005,conducted Between 980129 & 0527 at Seabrook Station & Forwards Nov.Violation Re Discrimination of Williams Power Corp,Contractor of Naesco,Against Electrician for Raising Safety Issues ML20210P3361999-08-0303 August 1999 Discusses Investigation Rept 1-98-005 Conducted by Region I OI at Naesco,Seabrook Station & Forwards Nov.Violations Re Electrical Wiring in Control Panel for Control Bldg Air Conditioning Sys ML20210K4911999-07-28028 July 1999 Responds to to Chairman Jackson Requesting Info on Concerns Raised by Constitutent a Menninger,Re Seabrook Nuclear Power Station Y2K Readiness ML20216E2321999-07-26026 July 1999 Discusses GL 92-01,rev 1,suppl 1, Rv Structural Integrity. NRC Revised Info in Rvid & Releasing as Rvid Version 2 IR 05000443/19990041999-07-26026 July 1999 Forwards Insp Rept 50-443/99-04 on 990510-0620.No Violations Noted.Emergency Preparedness Program Reviewed & Found to Be Acceptable ML20210E2231999-07-20020 July 1999 Discusses Arrangements Made by Dennis & M Santiago During 990615 Telephone Conversation for NRC to Inspect Licensed Operator Requalification Program at Pilgrim During Wk of 991004 ML20209G4711999-07-14014 July 1999 Informs That Unredacted Version of Supplemental Commercial & Financial Data for Baycorp Holdings,Ltd,Submitted in 990407 Application & Affidavit,Marked Proprietary Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) ML20210A9441999-07-14014 July 1999 Responds to Re Changes to Pilgrim Nuclear Power Station Physical Security Plan Identified as Issue 2,rev 14, Addendum 1,respectively.No NRC Approval Is Required IAW 10CFR54(p) ML20209G2251999-07-0909 July 1999 Forwards Insp Rept 50-293/99-03 on 990419-0609.Five Severity Level IV Violations of NRC Requirements Identified & Being Treated as non-cited Violations,Consistent with App C. Several Individual Tagging Errors Occurred ML20209C4661999-07-0707 July 1999 Forwards SE Accepting Addendum on Proposed Change in Corporate Ownership Structure Involving Entergy Nuclear Generation Co ML20196J7251999-07-0101 July 1999 Informs of Completion of Licensing Action for GL 96-01, Testing of Safety-Related Logic Circuits, for Pilgrim Nuclear Power Station ML20196J7011999-06-30030 June 1999 Forwards Second Request for Addl Info Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves ML20196H2381999-06-29029 June 1999 Forwards SER Denying Licensee 980820 Request for Alternative Under PRR-13,rev 2 for Use of Code Case N-522 During Pressure Testing of Containment Penetration Piping ML20209A8761999-06-28028 June 1999 Forwards SER Authorizing Licensee 990317 Relief Request to Use ASME Code Case N-573 as Alternative to ASME Code Section XI Article IWA-4000 for Remainder of 10-year Interval Pursuant to 10CFR50.55a(a)(3)(i) ML20209A6701999-06-25025 June 1999 Informs That NRC Ofc of NRR Reorganized Effective 990528.As Part of Organization,Div of Licensing Project Mgt Was Created.Organization Chart Encl ML20196G8421999-06-21021 June 1999 Forwards Copy of Notice of Consideration of Approval of Application Re Proposed Corporate Merger & Opportunity for Hearing Re 990315 Application Filed by Nepco IR 05000443/19990021999-06-21021 June 1999 Forwards Insp Rept 50-443/99-02 on 990321-0509.Violation Re Failure to Ensure That Critical Relay Calibr Characteristics Were Met Prior to Installation Was Identified ML20196J4451999-06-18018 June 1999 Ack Receipt of ,Following Up on .In Ltr of April 5,EJ Markey Highlighted Issue of EDG Reliability in Light of Recent Discovery of Defective AR Relays at Seabrook NPP in New Hampshire ML20212J2651999-06-17017 June 1999 Informs That Unredacted Version of Updated Financial Data for Baycorp Holdings,Ltd Will Be Withheld from Public Disclosure & Marked as Confidential Pursuant to 10CFR2.790(b)(5) & Section 103(b) of Atomic Energy Act ML20212H6661999-06-15015 June 1999 Forwards RAI Re 990315 Application Request for Approval of Proposed Indirect Transfer of Seabrook Station,Unit 1 License & Proposed Indirect Transfer of Millstone,Unit 3 License to Extent Held by Nepco 1999-09-30 |
Text
_ .. - -
. e NOV 0 81988 DISTRIBUTION Doctek F11e>50 443 & 50-293 PDI. Reading File NRC PDR PDR !
Hurley/Sniezek SVarga D. Mossburg, PMAS (0889213) BBoger VNerses DCrutchfield DMcDonald MRushbrook '
RWessman NRC PDR i Mr. Philip B. Shiff # " "9 39 Manton Road Swampscott, Massachusetts 01907 '
Dear Mr. Shiff:
This is in response to your postcard 6 ted October 15, 1988, which recomended keeping the Seabrook and Pilgrim facilities closed and asked a question about nuclear waste disposal.
With regard to keeping the plants closed, the Nuclear Regulatory Comission (NRC),
in carrying out its responsibility to ultimately decide this matter, will use the best information available with a full awareness of our responsibility for the protection of public health and safety. We take this responsibility very seriously. We believe we are taking the necessary steps to assure ourselves that the Seabrook plant will not comence operation and the Pilgrim plant will not restart unless and until we are fully satisfied that safe operations can be performed and that the public health and safety is protected.
With regards to your question on nuclear waste disposal, we consider two levels l of waste for commercial nuclear power plants: low level and high level. Low '
level waste is shipped in a safe container to an out-of-state licensed low level burial site. High level waste is usually spent fuel. There is no geological respository for high level waste at this time. The spent fuel is safely stored on the plant site in a spent fuel pool pending availability of a licensed high level waste geological repository being developed by the U.S. Department of Energy.
Sincerely, l Steven A. Varga, Director Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation ,
e s811170311 881108 PDR ADOCK 05000293 PDC H *See previous concurrence
, pf0t i n n j
,0FG :LA:PDI.3 : F N PIl .
.....:............; 4.R . 4.....: : .E DIR/PDI.3 L....::.....
- AD y :D DgR. : '
l:
NAME :*MRushbrook :VPerses :D onald :RWess
- B ger t..... :: . F.
7 7Varga(Df..:...........
DATE :11/07/88 :11/'7 /88 :11/"1/88 :11/1 /88 :11/1(/88 :11/7/88 :