ML20206D895
ML20206D895 | |
Person / Time | |
---|---|
Site: | Pilgrim, Seabrook, 05000000 |
Issue date: | 10/15/1988 |
From: | Shiff P AFFILIATION NOT ASSIGNED |
To: | NRC |
Shared Package | |
ML20206D892 | List: |
References | |
NUDOCS 8811170312 | |
Download: ML20206D895 (4) | |
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217M8771999-10-25025 October 1999
[Table view]Requests That Industry Studies on long-term Spent Fuel Pool Cooling Be Provided to R Dudley at Listed Mail Stop ML20217M4331999-10-19019 October 1999 Submits Rept 17, Requal Tracking Rept from Operator Tracking Sys. Rept Was Used by NRC to Schedule Requalification Exams for Operators & Record Requal Pass Dates ML20217N8911999-10-15015 October 1999 Forwards Rept of Changes,Tests & Experiments at Pilgrim Nuclear Power Station for Period of 970422-990621,IAW 10CFR50.59(b).List of Changes Effecting Fsar,Encl ML20217D3951999-10-13013 October 1999 Forwards Request for Addl Info Re Util 990806 Submittal on USI A-46, Implementation Methodology Used at Pilgrim Nuclear Power Station, Per GL 87-02 ML20217F5841999-10-13013 October 1999 Requests Revocation of License OP-11038-1 for GE Kingsley. Individual Has Been Reassigned to Position within Naesco ML20217F5811999-10-13013 October 1999 Forwards Insp Data & Naesco Evaluation of a EDG Exhaust Insp Conducted on 990407.Insp Ensured That Unacceptable Wall Thinning Will Not Occur During 40-year Design Lifetime of Sys ML20217C7321999-10-0808 October 1999 Forwards Copy of Seabrook Station Videotape Entitled, Completion of Seal Barrier Installation. Videotape Documents Process of Selecting,Designing & Installing Seal Deterrent Barrier to Preclude Entrapment of Seals ML20217E1581999-10-0808 October 1999 Forwards Insp Rept 50-293/99-05 on 990726-0905.Three Violations Noted & Being Treated as Ncvs.Violations Include Failure to Assure That Design Bases Correctly Translated Into Specifications ML20217C3151999-10-0606 October 1999 Forwards Scenario Package for Pilgrim Nuclear Power Station Nrc/Fema Evaluated Exercise Scheduled for 991207.Without Encl ML20217C8051999-10-0505 October 1999 Forwards Proprietary Results of Audiologic Evaluations for Jp Giar,License SOP-10061-3.Attachment Clearly Shows Requirements for Operator Hearing Ability Are Met. Proprietary Info Withheld,Per 10CFR2.790(a)(6) ML20217D5591999-10-0505 October 1999 Documents Pilgrim Nuclear Power Station Five Yr Survey of Main Breakwater.Survey Has Determined That Pilgrim Main Breakwater Is Intact & Remains Adequately Constructed to Perform Designed Safety Function ML20217B8621999-10-0505 October 1999 Forwards Rev 28,change 1 to EPIP Er 1.1, Classification & Emergencies, Per 10CFR50.54(q).Rev to Procedure Does Not Decrease Effectiveness of Seabrook Station Radiological Emergency Plan ML20217B7471999-10-0101 October 1999 Provides Notification of Change in PCT of More than 50 F,Per Requirements of 10CFR50.46(a)(3)(i),(ii).Tabulation of Large Break LOCA PCT Margin Utilization Applicable to Seabrook Station,Encl ML20212K7921999-09-30030 September 1999 Confirms 990922 Telcon with J D'Antonio & T Grew Re Arrangements Made for NRC to Inspect Licensed Operator Requalification Program at Seabrook Facility ML20212J8271999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of Seabrook Station. Staff Conducted Reviews for All Operating NPPs to Integrate Performance Info & to Plan for Insp Activities at Facility Over Next Six Months.Plant Issues Matrix & Insp Plan Encl ML20216J2471999-09-30030 September 1999 Responds to Which Provided Comments on NRC Interim Enforcement Policy Re Enforcement Discretion for Nuclear Plants During Y2K Transition.Informs That Naesc Reported Seabrook as Y2K Ready Prior to 990701 ML20216J2421999-09-30030 September 1999 Responds to Card Received in Aug 1999,providing Comments on NRC Interim Enforcement Policy Re Enforcement Discretion for Nuclear Plants During Y2K Transition.Informs That Naesc Reported Seabrook as Y2K Ready Prior to 990701 ML20216J2381999-09-30030 September 1999 Responds to Re Enforcement Discretion for Nuclear Plants During Y2K Transition.Nrc Expects All Licensees to Operate Nuclear Facilities Safety IAW NRC Regulations & Requirements ML20212J8301999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of Pilgrim Nuclear Power Station.Staff Conducts Reviews for All Operating NPPs to Integrate Performance Info & to Plan Insp Activities at Facility Over Next Six Months ML20216J9961999-09-29029 September 1999 Forwards Resume of Person Identified as Acting RPM in Licensee to NRC Re Notification That Person Named in License Condition 11 of 20-07626-02,is No Longer Employed at Pilgrim Station.Resume Withheld,Per 10CFR2.790 ML20212F7871999-09-24024 September 1999 Advises That Util 990121 Application for Amend Being Treated as Withdrawn.Proposed Changes Would Have Modified Facility UFSAR Pertaining to Values for post-accident Containment Pressure Credited in Pilgrim Net Positive Head Analyses ML20212J0301999-09-24024 September 1999 Forwards Insp Rept 50-443/99-10 on 990726-30 & 0809-13.No Violations Noted.Insp Discussed ML20212H1381999-09-23023 September 1999 Submits Info in Support of Request Filed on 990730 to Grant one-time Exemption from 10CFR50,App E,Authorizing Biennial Full Participation Emergency Preparedness Exercise to Be Conducted in 2002 Instead of 2001 ML20212H1441999-09-23023 September 1999 Withdraws 990121 Request for License Change Re Emergency Core Cooling Sys Net Positive Suction Head,Due to Incorrect Datum Preparation ML20212G5071999-09-21021 September 1999 Submits Complaint to NRC Re NRC Failure to Cite Seabrook Station NPP Operators for Failing to Periodically Calibrate & Establish Adequate Measures to Insure That Relay Equipment Met All Required Calibration Settings Prior to Installation ML20212C1881999-09-20020 September 1999 Ack Receipt of Which Raised Concerns Re NRC Enforcement Actions at Plant & Issuance of NCVs ML20212D1401999-09-17017 September 1999 Forwards SE Accepting Request to Use Proposed Alternative to Certain Weld Repair Requirements in ASME Boiling & Pressure Vessel Code ML20212B9511999-09-17017 September 1999 Forwards NRC Form 396 for MG Sketchley,License SOP-10685, Along with Supporting Medical Exam Info.Nrc Form 396 Has Been Superceded by Revised Version Dtd 971222,which Was Previously Submitted to NRC on 990812.Encl Withheld ML20212C2861999-09-16016 September 1999 Forwards SER Accepting Licensee 981123 Request for Relief RR-E1,RR-E5,RR-E6 Pursuant to 10CFR50.55a(a)(3)(i) & Request for Relief RR-E2,RR-E3 & RR-E4 Pursuant to 10CFR50.55a(a)(3)(ii) ML20216F3451999-09-16016 September 1999 Forwards Summary Rept Providing Results of ISI Conducted at PNPS on-line & Refueling Outage (RFO 12) ML20212C3621999-09-15015 September 1999 Forwards Rev 34 to Seabrook Station Radiological Emergency Plan & Rev 85 to Seabrook Station Emergency Response Manual, Per 10CFR50,App E & 10CFR50.4 ML20212B5021999-09-14014 September 1999 Forwards Licensee Responses to EPA Questions Re Plant Seal Deterrent Barrier.Util Completed Installation of Subject Barriers on All Three Station Offshore Intake Structures on 990818.Barriers Will Preclude Entrapment of Seals ML20216E7111999-09-0909 September 1999 Forwards License Renewal Application Including Form NRC-398 & Form NRC-396 for Jp Giar,License SOP-10061-3.Without Encls ML20211Q8521999-09-0808 September 1999 Informs That Rl Couture,License SOP-11027,terminated Employment at Naesco on 990907.Revocation of License Requested ML20216E5891999-09-0707 September 1999 Forwards Copy of Pilgrim Station Organization Structure. Encl Refelcts Changes in Upper Mgt Level Structure.Changes Were Effective 990901 ML20211M4501999-09-0303 September 1999 Informs That Pilgrim Nuclear Power Station Plans to Conduct Full Participation Emergency Preparedness Exercise with Commonwealth of Ma on 991207,IAW 10CFR50,App E,Section IV.F.2 ML20211J9291999-09-0303 September 1999 Forwards mark-ups & Retypes of Proposed Conforming License Changes Required in Connection with Transfers Being Sought in 990615 Application of Montaup Electric Co & New England Power Co for Transfer of Licenses & Ownership Interests ML20211N8781999-09-0303 September 1999 Forwards Response to 990820 RFI Re NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams DD-99-10, Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision (DD-99-10) Expired.Commission Declined Review & Decision Became Final on 990830.With Certificate of Svc.Served on 9909021999-09-0202 September 1999 Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision (DD-99-10) Expired.Commission Declined Review & Decision Became Final on 990830.With Certificate of Svc.Served on 990902 ML20211M3221999-09-0202 September 1999 Responds to NRC Re Violations Noted in Insp of License NPF-86 & Proposed Imposition of Civil Penalty. Corrective Actions:Conducted Prompt Review of Layoff Decision to Determine Relevant Facts ML20211J8811999-09-0101 September 1999 Forwards Comments on Seabrook Station Review of Reactor Vessel Integrity Database (Rvid)(Version 2).Minor Discrepancies Were Noted.Proposed Changes Are Encl in Order to Correct Discrepancies ML20211J8411999-09-0101 September 1999 Forwards Updated NRC Form 396 for E Decosta,Nrc License OP-10655-1.Without Encl ML20211M9161999-08-31031 August 1999 Submits Review & Correction of Info in Reactor Vessel Integrity Database (Rvid),Version 2,re Pilgrim Station ML20211J8391999-08-30030 August 1999 Forwards Rev 1 to Provisional Decommissioning Trust Agreement for Plant,Changing Portions of Agreement to Permit Up to Two Distributions & Clarify Formula for Distribution ML20211H5701999-08-27027 August 1999 Forwards Insp Rept 50-293/99-04 on 990610-0725.Two Violations Identified Being Treated as non-cited Violations ML20211G9191999-08-27027 August 1999 Informs NRC That Name of New Company, Ref in Order Approving Application Re Corporate Merger Is Nstar Which Is Massachusetts Business Trust ML20211J0401999-08-26026 August 1999 Responds to 990819 Request,On Behalf of Gr Pageau & Williams Power Corp,For Addl Time in Which to Reply to Nov,Issued on 990803.Response Due to NRC by 991008 ML20211H0651999-08-25025 August 1999 Forwards Insp Rept 50-443/99-05 on 990621-0801.One Violation Re Failure to Include Multiple Components within Scope of ISI Test Program Was Identified & Being Treated as NCV, Consistent with App C of Enforcement Policy ML20211G7761999-08-24024 August 1999 Expresses Great Concern Re Lack of Enforcement Actions Against Seabrook Station Despite Citations NRC Has Issued for Violations of Seabrook Operating License ML20211J2171999-08-23023 August 1999 Expresses Disappointment with Lack of Enforcement Action Against Seabrook Station Despite Repeated Safety Violations 1999-09-09 Category:INCOMING CORRESPONDENCE MONTHYEARML20217N8911999-10-15015 October 1999
[Table view]Forwards Rept of Changes,Tests & Experiments at Pilgrim Nuclear Power Station for Period of 970422-990621,IAW 10CFR50.59(b).List of Changes Effecting Fsar,Encl ML20217F5841999-10-13013 October 1999 Requests Revocation of License OP-11038-1 for GE Kingsley. Individual Has Been Reassigned to Position within Naesco ML20217F5811999-10-13013 October 1999 Forwards Insp Data & Naesco Evaluation of a EDG Exhaust Insp Conducted on 990407.Insp Ensured That Unacceptable Wall Thinning Will Not Occur During 40-year Design Lifetime of Sys ML20217C3151999-10-0606 October 1999 Forwards Scenario Package for Pilgrim Nuclear Power Station Nrc/Fema Evaluated Exercise Scheduled for 991207.Without Encl ML20217D5591999-10-0505 October 1999 Documents Pilgrim Nuclear Power Station Five Yr Survey of Main Breakwater.Survey Has Determined That Pilgrim Main Breakwater Is Intact & Remains Adequately Constructed to Perform Designed Safety Function ML20217C8051999-10-0505 October 1999 Forwards Proprietary Results of Audiologic Evaluations for Jp Giar,License SOP-10061-3.Attachment Clearly Shows Requirements for Operator Hearing Ability Are Met. Proprietary Info Withheld,Per 10CFR2.790(a)(6) ML20217B8621999-10-0505 October 1999 Forwards Rev 28,change 1 to EPIP Er 1.1, Classification & Emergencies, Per 10CFR50.54(q).Rev to Procedure Does Not Decrease Effectiveness of Seabrook Station Radiological Emergency Plan ML20217B7471999-10-0101 October 1999 Provides Notification of Change in PCT of More than 50 F,Per Requirements of 10CFR50.46(a)(3)(i),(ii).Tabulation of Large Break LOCA PCT Margin Utilization Applicable to Seabrook Station,Encl ML20216J9961999-09-29029 September 1999 Forwards Resume of Person Identified as Acting RPM in Licensee to NRC Re Notification That Person Named in License Condition 11 of 20-07626-02,is No Longer Employed at Pilgrim Station.Resume Withheld,Per 10CFR2.790 ML20212H1381999-09-23023 September 1999 Submits Info in Support of Request Filed on 990730 to Grant one-time Exemption from 10CFR50,App E,Authorizing Biennial Full Participation Emergency Preparedness Exercise to Be Conducted in 2002 Instead of 2001 ML20212H1441999-09-23023 September 1999 Withdraws 990121 Request for License Change Re Emergency Core Cooling Sys Net Positive Suction Head,Due to Incorrect Datum Preparation ML20212G5071999-09-21021 September 1999 Submits Complaint to NRC Re NRC Failure to Cite Seabrook Station NPP Operators for Failing to Periodically Calibrate & Establish Adequate Measures to Insure That Relay Equipment Met All Required Calibration Settings Prior to Installation ML20212B9511999-09-17017 September 1999 Forwards NRC Form 396 for MG Sketchley,License SOP-10685, Along with Supporting Medical Exam Info.Nrc Form 396 Has Been Superceded by Revised Version Dtd 971222,which Was Previously Submitted to NRC on 990812.Encl Withheld ML20216F3451999-09-16016 September 1999 Forwards Summary Rept Providing Results of ISI Conducted at PNPS on-line & Refueling Outage (RFO 12) ML20212C3621999-09-15015 September 1999 Forwards Rev 34 to Seabrook Station Radiological Emergency Plan & Rev 85 to Seabrook Station Emergency Response Manual, Per 10CFR50,App E & 10CFR50.4 ML20216E7111999-09-0909 September 1999 Forwards License Renewal Application Including Form NRC-398 & Form NRC-396 for Jp Giar,License SOP-10061-3.Without Encls ML20211Q8521999-09-0808 September 1999 Informs That Rl Couture,License SOP-11027,terminated Employment at Naesco on 990907.Revocation of License Requested ML20216E5891999-09-0707 September 1999 Forwards Copy of Pilgrim Station Organization Structure. Encl Refelcts Changes in Upper Mgt Level Structure.Changes Were Effective 990901 ML20211M4501999-09-0303 September 1999 Informs That Pilgrim Nuclear Power Station Plans to Conduct Full Participation Emergency Preparedness Exercise with Commonwealth of Ma on 991207,IAW 10CFR50,App E,Section IV.F.2 ML20211N8781999-09-0303 September 1999 Forwards Response to 990820 RFI Re NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams ML20211J9291999-09-0303 September 1999 Forwards mark-ups & Retypes of Proposed Conforming License Changes Required in Connection with Transfers Being Sought in 990615 Application of Montaup Electric Co & New England Power Co for Transfer of Licenses & Ownership Interests ML20211M3221999-09-0202 September 1999 Responds to NRC Re Violations Noted in Insp of License NPF-86 & Proposed Imposition of Civil Penalty. Corrective Actions:Conducted Prompt Review of Layoff Decision to Determine Relevant Facts ML20211J8411999-09-0101 September 1999 Forwards Updated NRC Form 396 for E Decosta,Nrc License OP-10655-1.Without Encl ML20211J8811999-09-0101 September 1999 Forwards Comments on Seabrook Station Review of Reactor Vessel Integrity Database (Rvid)(Version 2).Minor Discrepancies Were Noted.Proposed Changes Are Encl in Order to Correct Discrepancies ML20211M9161999-08-31031 August 1999 Submits Review & Correction of Info in Reactor Vessel Integrity Database (Rvid),Version 2,re Pilgrim Station ML20211J8391999-08-30030 August 1999 Forwards Rev 1 to Provisional Decommissioning Trust Agreement for Plant,Changing Portions of Agreement to Permit Up to Two Distributions & Clarify Formula for Distribution ML20211G9191999-08-27027 August 1999 Informs NRC That Name of New Company, Ref in Order Approving Application Re Corporate Merger Is Nstar Which Is Massachusetts Business Trust ML20211G7761999-08-24024 August 1999 Expresses Great Concern Re Lack of Enforcement Actions Against Seabrook Station Despite Citations NRC Has Issued for Violations of Seabrook Operating License ML20211J2171999-08-23023 August 1999 Expresses Disappointment with Lack of Enforcement Action Against Seabrook Station Despite Repeated Safety Violations ML20211J4971999-08-21021 August 1999 Submits Comments Re Violations Cited in Early Mar & 990509 Insps ML20211H8361999-08-19019 August 1999 Submits Concerns Re Violations at Seabrook Station ML20211C3381999-08-19019 August 1999 Provides semi-annual LTP Update,Including Schedule, Commitment Descriptions,Progress Since Last Update & Summary of Changes.Rev Bars Indicate Changes in Status Since Last Submittal ML20211B3841999-08-16016 August 1999 Forwards Response to NRC Second RAI Re Pressure Locking & Thermal Binding of SR power-operated Gate Valves ML20211J1831999-08-15015 August 1999 Submits Concerns Over Serious Deficiencies at Seabrook Station That NRC Has Declined to Take Enforcement Actions Against ML20211J3241999-08-15015 August 1999 Expresses Disappointment in Apparent Failure of NRC to Cite Seabrook Station NPP for Recent Violations of Safety Regulations Uncovered During Recent Insps in Mar & May ML20211J2071999-08-13013 August 1999 Expresses Concerns Re Violations Occurring Recently at Seabrook Nuclear Power Station.Requests Effort to See That Measures Taken to Stop Flagrant,Continuing Violations That Hold Danger to Workers & Community ML20210U4831999-08-13013 August 1999 Forwards fitness-for-duty Program Performance Data Sheets for Period of 990101-0630,per 10CFR26.71(d) ML20210S2001999-08-12012 August 1999 Forwards NRC Forms 398 & 396 in Support of Applications for Renewal of Operator Licenses for Individuals Listed Below. Without Encls ML20210R9581999-08-11011 August 1999 Forwards ISI Exam Rept of Seabrook Station, for RFO 6, Period 3,for Insps Conducted Prior to & During Sixth Refueling Outage Concluded on 990510 ML20210R8401999-08-11011 August 1999 Forwards Response to NRC Second RAI Re GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves ML20210R7931999-08-10010 August 1999 Forwards Cycle 7 Startup Rept for Seabrook Station, IAW Requirements of TS 6.8.1.1 ML20210S0891999-08-0909 August 1999 Forwards Amend 11 to Indemnity Agreement B-48 Signed by Boston Edison Co & Entergy Nuclear Generation Co ML20210R6251999-08-0606 August 1999 Provides Supplementary Info on USI A-46 Implementation Methodology at Pilgrim Station,To Enable NRC to Perform Evaluation & Issuance of Plant Specific SER for Plant ML20210M9411999-08-0202 August 1999 Requests That NRC Treat Pending Actions Requested by Beco Prior to 990713,as Requests Made by Entergy.Ltr Requests That Minor Administrative Changes to License Amend 182 & Associated Ser, ,reflect 990713 Transfer ML20210H8761999-07-30030 July 1999 Requests That NRC Grant Exemption from Requirements of 10CFR50,App E,Section IV F,Which Would Authorize Rescheduling of 2001 Biennial Full Participation Emergency Preparedness Exercise for Pilgrim Station to 2002 ML20210K3281999-07-30030 July 1999 Forwards Response to NRC RAI Re License Amend Request 98-17. North Atlantic Concurs with Staff That Bases Should State That Maintaining ECCS Piping Full of Water from RWST to Reactor Coolant Sys Ensures Sys Will Perform Properly ML20210H8661999-07-29029 July 1999 Provides Revised Response to GL 96-06 & Addresses NRC Insp Concern for Containment Penetration X-12.Info Submitted to Facilitate NRC Review & Closeout of Subject GL for Plant ML20210H0921999-07-27027 July 1999 Forwards Naesc Semi-Annual Fitness-for-Duty Rept,Jan-June 1999, Per 10CFR26.71(d).Rept Includes Data from 990101- 0610 ML20210H8991999-07-27027 July 1999 Forwards Tabulation of Current LBLOCA & SBLOCA Peak Clad Temp Margin Utilization Tables Applicable to Seabrook Station ML20216D4131999-07-22022 July 1999 Informs That J Conlon,License OP-11040-1,terminated Employment with Beco on 990703,per 10CFR50.74.Individual Will Not Participate in Util Licensed Operator Requalification Training Program 1999-09-09 Category:PUBLIC ENTITY/CITIZEN/ORGANIZATION/MEDIA TO NRC MONTHYEARML20058C1261990-09-0606 September 1990
[Table view]Expresses Strong Objection to NRC Response to OIG Rept on Region I Review of off-site Emergency Preparedness ML20059H2761990-08-29029 August 1990 Advises That Intervenors Intend to Prepare & File Further Affidavit Re Emergency Motion to Reopen Record on Adequacy of Staffing of State of Nh Radiological Emergency Response Plan & for Immediate Shutdown.Svc List Encl ML20028G9051990-08-14014 August 1990 Comments on Current State of Emergency Preparedness in Local Communities within 10 Mile EPZ Around Facility.Believes NRC in Violation of 10CFR50.47 & Not Providing Adequate Emergency Planning to Assure Safety of Public ML20063Q0521990-07-31031 July 1990 Requests That Plant Be Returned to 5% Power Until Emergency Planning Does Offer Reasonable Assurance ML20056B1721990-07-30030 July 1990 Advises That Director'S Decision DD-90-4 Nonresponsive & Noncompliant W/Provisions of 10CFR2.206 & Noncompliant W/ Aslab Memorandum & Order of 900123 for Stated Reasons ML20055G7641990-07-0404 July 1990 Requests Info Re Type of Amend to License DPR-35 That Permits Single Loop Operation at Greater than 50% Power, Provided That Statements in Encl Article in Providence Journal Newspaper True,Per ASLB 840126 Order ML20043H2941990-06-11011 June 1990 Comments on Two Recent Requests by Boston Edison to Amend License for Plant.Trend to Reduce Testing & Lengthen Allowed out-of-svc Periods of Great Concern.Solution Should Be to Improve How Tests Conducted ML20043C6771990-05-30030 May 1990 Informs That Author Will Be Unable to Attend 900605 Prehearing Conference in Concord,Nh.Counsel for Atty General of Commonwealth of Ma Will Represent Necnp Interests at Prehearing Conference ML20043G9871990-05-16016 May 1990 Advises That Author Established Network to Monitor Emissions from Plant.Mission Statement Outlining Objectives & Methodology of Network Encl.Nrc Will Be Added to Mail List ML20055G3341990-05-0606 May 1990 Comments in Opposition of Nuclear Power Plant Going on-line Above 5% Power ML20012E7661990-03-27027 March 1990 Advises That Seacoast Anti-Pollution League Has No Intention of Proceeding Further in Proceedings Before Appeal Board Due to Intervenor Inability to Justify Expense of Further Participation.Svc List Encl ML20043F5111990-03-26026 March 1990 FOIA Request for Records Re NRC Investigation Rept on Pilgrim Station ML20012E7361990-03-25025 March 1990 Ack Offer to Answer Questions Re NRC Review of Numerous Requests for Relief by Util from Full Compliance W/Plant First 10-yr Inservice Insp Requirements & Submits Questions Re 900327 Ltr ML20012C6671990-03-15015 March 1990 Emergency Petition for Extension of Stay.* Forwards Notarized Copy of Rd Pollard Affidavit Supporting Emergency Petition for Extension of Stay Filed on 900314 ML20006G1201990-02-27027 February 1990 Requests Leave to File Encl Further Comments of Seacoast Anti-Pollution League Re Immediate Effectiveness of Licensing Authorization,Or in Alternative,In Support of Stay.Comments Directed to Substantial Change in State Plan ML20012A3051990-02-26026 February 1990 Requests Info Re What Blueprints,Plans,Diagrams & Catalogs Available to cross-ref Various Welds & Weld Locations at Unit 1 & Why Both Surface & Volumetric Weld Insps Required ML20006D8351990-02-0101 February 1990 Forwards Statement of Issues to Be Included in Seacoast Anti-Pollution League Brief in Support of LBP-89-32,in Response to 900131 Order ML20006F4391990-02-0101 February 1990 Readiness Review.* Requests Board to Consider Stated Written Views of Attachments to NRC 900108 & 09 Ltrs Due to Intervenors Not Receiving Documents Until Afternoon of 900118 & After Commission Meeting Ended.W/Related Info ML20011E6351990-02-0101 February 1990 Requests NRC Investigation of Allegation That Number of Keycards That Permit Entry to Protected Areas No Longer in Possession of Individuals to Whom They Were Issued ML20006D3131990-01-29029 January 1990 Forwards Revised Brief on Appeal of Partial Initial Decision on Spmc & 1988 FEMA-graded Exercise (LBP-89-32) to Include Portions of Transcript Cited in Brief as App ML20006B2381990-01-24024 January 1990 Forwards Seacoast Anti-Pollution League Brief in Support of Petitions for Review of LBP-89-32.Also Joins in Commonwealth of Ma 900122 Brief in Support of Appeal of LBP-89-38 ML20006B1851990-01-19019 January 1990 Forwards Opening Statement on Behalf of Seacoast Anti-Pollution League Re Offsite Emergency Planning & Safety Issues.Adequate Emergency Planning at Facility May Not Be Feasible & License Should Not Be Issued.Svc List Encl ML20006A2621990-01-18018 January 1990 Expresses Concern Re Safety of People That Live Near Plant on Basis That Plant Located in Densely Populated Coastal Area W/Predicted Seismic Activity & Inadequate Evacuation Routes.Plant Should Not Be Licensed ML20006A3141990-01-18018 January 1990 Readiness Review.* Discusses Number of Serious Potential Defects in Design & Const of Plant That Need to Be Addressed & Resolved Before Commission Concludes That Reactor Ready to Operate.Supporting Documentation Encl ML20006A2601990-01-17017 January 1990 Requests That Encl Ltrs Added to Transcript of 900118 NRC Hearing & Included in Records,Per Telcon.Served on 900123 ML20006A2651990-01-17017 January 1990 Requests Time to Read Ltr at 900118 Hearing Re Facility to Express Concerns of Amesbury Religious Society of Friends, Including Serious Safety Issues & Location of Plant.W/ Certificate of Svc ML20006A0681990-01-16016 January 1990 Requests Brief Opportunity to Address Commission at 900118 Meeting & Decries NRC Failure to Comply W/Govt in Sunshine Act in Scheduling Meetings on Plant OL Case w/1 Wk Notice ML20006A4231990-01-11011 January 1990 Forwards Town of Essex 890711 Ltr Requesting That Reactor Safety Issues Be Addressed & Resolved Prior to Licensing of Reactor,For Response.W/Certificate of Svc ML20005H1921989-12-15015 December 1989 Requests Addl Info Re NRC Response to Author 890515 Ltr ML19351A6961989-12-0505 December 1989 Forwards Signature Page for Gc Minor Affidavit,Per Commonwealth of Ma Atty General 891201 Filing of Gc Minor & Sc Sholly Joint Affidavit in Support of Intervenors Application for Stay of LBP-89-32 ML19332F9351989-12-0404 December 1989 Forwards Corrected Title Page to 891121 Filing of Necnp Request for Stay of Immediate Effectiveness of LBP-89-32 Pending Resolution of Outstanding Licensing Issues.Original Had Incorrect Caption Directed to Attention of ASLB ML19332D8941989-11-22022 November 1989 Submits That Recipient 891117 Ltr on Commission Response to Senator Glenn Re Having No Communications W/Governor Sununu Re Plant Emergency Planning Insufficient.Fuller Response from Commissioner Roberts Warranted.Svc List Encl ML19332D7911989-11-21021 November 1989 Forwards Original Signature Page to Gc Minor & Sc Sholly 891117 Affidavit & Objection to No Significant Hazards Determination & Request for Hearing on Proposed Amend to Plant Low Power OL ML19332D5601989-11-17017 November 1989 Forwards Intervenors Motion to Reopen Record & Admit late-filed Contention Re Proposed Amend of Facility Ol,Application,For Filing.Original Signature Page to Affidavit Will Be Forwarded ML19354D5341989-11-0808 November 1989 Requests Determination of Commissioner Roberts Intentions,If Any,To Abstain from Voting on Matters Pending Before Commission Re Adquacy of Emergency Planning at Plant Due to Conflict of Interest.Related Info & Svc List Encl ML19325E9801989-11-0101 November 1989 Requests That Author Name Be Placed on Distribution List Re Schedule of Hearing in Alchemie Case.W/Certificate of Svc. Served on 891101 ML19327B7441989-10-21021 October 1989 Expresses Concern Re Financial Status of Util When Judging Ability to Safely Operate Facility.Residents Around Facility Need More than Reasonable Assurance That Operations Will Be Consistent W/Public Health & Safety ML19325F3361989-10-0808 October 1989 Provides Rept of Prolonged Excessive Radiation Readings Taken Near Plant on 890926.Stack & Vent Monitors at Plant Revealed No Abnormal Releases.Concern Expressed Increase of Background Being Injurous to Health.Graphs Encl ML20248D1041989-09-26026 September 1989 Forwards Response to Commission 890822 Order & New England Electric Sys Form 10-Q for Quarter Ending 890630 in Support of Part III of Response Re Insufficient Funding for Operating Plant ML20247Q6781989-09-22022 September 1989 Objects,For Record,Applicant 890920 Motion to Strike Seacoast Anti-Pollution League (Sapl) Response to Aslab 890830 Order.Sapl Response Considered within Framework Intended by Aslab.W/Certificate of Svc ML19353B0281989-09-19019 September 1989 FOIA Request for Info Re Releases of Radiation to Atmosphere from Facility ML20247M0731989-09-18018 September 1989 Forwards Corrected Seacoast Anti-Pollution League 890915 Response in Accordance W/Aslab Order of 890830,making Typo & Grammatical Changes ML20247A1071989-09-0606 September 1989 Emergency Planning.* Provides Info Re Problem of Summer Beach Population in Plant Area Resorts Not Being Protected During Radiological Emergency.Related Correspondence ML20247B5591989-09-0606 September 1989 Forwards Seacoast Anti-Pollution League Comments Re ACRS Seabrook Subcommittee 890817 Meeting.Issues Re Plant Not Fully Functional SPDS & Untested Siren Warning Sys Also Discussed.Related Correspondence ML20246F5721989-08-23023 August 1989 ACRS Meeting/Seabrook Nuclear Power Plant.* Advises That Seacoast Anti-Pollution League Joins in Commonwealth of Ma Atty General & Requests Reopened ACRS Subcommitee Meeting W/Opportunity to Be Heard.Related Correspondence ML20246J5491989-08-22022 August 1989 Requests That Augmented Insp Team Insp Rept Be Revised to Include Encl Addl Info ML20246E2891989-08-21021 August 1989 Expresses Appreciation for Opportunity to Address ACRS Subcommittee on Facility at 890817 Meeting.Believes ACRS Failure to Provide Licensee W/Timely Notice of Subj Meeting Unfair.Related Correspondence ML20247A1971989-08-11011 August 1989 Forwards Aerial Photos Submitted as Visual Evidence Supporting Town of Essex,Ma Selectmen Contention That Plant Siting Will Contaminate Marshes.Served on 890907 ML20248E0401989-08-0202 August 1989 Emergency Planning Appeal.* Clarifies Understanding Re History of Contentions on Reception Ctrs & Board Rulings on Litigability of Size of EPZ Population Attending Reception,Per 890727 Oral Argument.Supporting Info Encl ML20248E0021989-08-0202 August 1989 OL Case:Offsite Emergency Planning Issues.* Advises That Necnp Does Not Intend to File Proposed Findings & Conclusions of Law Re Spmc or Offsite Emergency Plannning Exercise 1990-09-06 |
Text
m .
O i
q*y .6
(t; 0%sh b/ % S.M ad p ktda { '
' ~
4
/g j
I lwde m a M M waMad ad i
'fWjWuUm%!fGw$%Mi&wlhWG. i Snditmo.dkasdGpu)tMk Ux gryfuTit; g g [ M sn '
b, C
..n.,,,,,
MGdil 19l%hU b E. yea % ow ,
8800411 ,
I DFR 01 F J 3 H PDC
j . i .' '
DISTRIBUTION Docket File 50-443 & 50-293 P . Reading File NRC PDR PDR Murley/Sniezek SVarga D. Mossburg, PMAS (0889213) BBoger YNerses DCrutchfield DMcDonald ' / MRushbrook RWestman ,/
Mr. Philip B. Shiff 39 Manton Road Swampscott, Massachusetts 01907
Dear Mr. Shiff:
This is in response to your postcard dated Oct er 15,'1988, which recommended keeping the Seabrook and Pilgrim facilities c ed and asked a question about nuclear waste disposal.
With regard to Ireeping the plants closed t e Nuclear Regulatory Connission (NRC),
in carrying out its responsibility to mately decide this matter, will use the best infonnation available with f 11 awareness of ou? responsibility for the protection of public health'and pfety. We take this responsibility very seriously. We believe we are tak fthenecessarystepstoassureourselves that the Seabrook plant will not c,emence operation and the Pilg-im plant will not restart unless and until w te folly satisfied that safe operations can be performed and that the public alth and safety is protected.
With regards to your quest on nuclear waste disposal, we consider two levels of waste for comercial vlear power plants: low level and hich level. Low level waste, is shipped a safe container to an out-of-state Ticensed low level b rial site. High lev waste is usually spent fuel. There is no geological respository for high 4 vel waste at this time. The spent fuel is safely stored a spent fuel pool pending availability of a licensed high
~
on the plant site level waste geolo. al repository being developed by the U.S. Department of Energy.
Sincerely, Steven A. Varga, Director Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation I
i 0FC :LA:PJI.3 :PM:PDI-3 :PN:PDI-3 :DIR/PDI.3 :AD:DRP :D:DRP :
4 .....: ........:............:............:............:............:............:...........
!NAME brook :VNerses :DMcDonald :RWe!,sma n :BBoger :SVarga :
! DATE :11/n 88 :11/ /88 :11/ /88 :11/ /88 :11/ /88 :11/ /88 :
OFFICIAL RECORD COPY
{
- . t.
i.' Document flame:
LTR. P. SHIFF/ YELLOW TICKET Requestor's ID:
BROWN Author's llame:
Vic and Don Document Comme.7ts:
Re Seabrook and Pilgrim l
l
g
- #p. ...m'o,, UNITED STATES 8 o NUCLEAR REGULATORY COMMISSION
{ ,8 WASHINGTON, D. C. 20655 o,
f
\ . . . . . '#
FROM: ORIGINAL DUE DT: 11/17/88 TICKET NO: 0889213 PHILIP B. SHIFF DOC DT: 10/15/88 NRR RCVD DATE: 10/27/88 TO:
NRC F GNATURE OF
- YEL **
E. M Y F DE ROUTING:
REGARDING CLOSING OF PILGRIM AND SEABROOK PLANTS N 9' '
CRUTCHFIELD~'
ASSIGNED TO: CONTACT: MOSSBURG .
DRPR VARGA Please review the due date immediatelv:
If the due date does not allow adequate time to respond to this ticket, you may request a revised due date. The recuest must have prior approval from the appropriate Associate Director or NRR D puty Director and niust include a valid justification. Contact NRR man 1 room with the new due date (Doris Mossburg, x-23072).
Please do not carry concurrence packages to Directors office without first going through the NRR mailroom.
1 i ACTION DUE TO NRR DIRECTOR'S OFFlCE BY h /s Mye