IR 05000346/1986003

From kanterella
Revision as of 13:47, 21 November 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Physical Security Insp Rept 50-346/86-03 on 860106-10.No Violation Noted.Open Item Re Lighting Identified.Major Areas Inspected:Security Organization & Personnel Training.Details Withheld (Ref 10CFR73.21)
ML20198H695
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 01/27/1986
From: Belanger J, Creed J, Drouin B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20198H668 List:
References
50-346-86-03, 50-346-86-3, NUDOCS 8601310078
Download: ML20198H695 (2)


Text

!

-

-.'

U.S. NUCLEAR REGULATORY COMMISSION j

REGION III

Report No. 50-346/86003(DRSS)

Docket No. 50-346 License No. NPF-3 Safeguards Group IV Licensee: Toledo Edison Company Edison Plaza 300 Madison Avenue Toledo, OH 43652 Facility Name: Davis-Besse Nuclear Power Station, Unit 1 Inspection At: Davis-Besse Site, Oak Harbor, OH Inspection Conducted: January 6-10, 1986 Date of Last Physical Security Inspection: September 9-12, 1985 Inspectors: ( 4en ' //Ep/gf B. D~rou4n Date Ph c' Security Inspector-fbe I l~

_ kJ.Y 8elanger Oate'

Physical Security Inspector Approved By: m //d7/86 J/ R. Creed, Chief Date Safeguards Section Insoection Summary Inspection on January 6-10, 1986 (Report No. 50-346/86003(DRSS))

Areas Inspected: Included a Review of Management Effectiveness; Security Organization; Records and Reports; Testing and Maintenance; Physical Barriers -

Protected and Vital Areas; Security System Power Supply; Lighting; Compensatory Measures; Access Control - Personnel and Packages; Detection Aids - Protected and Vital Areas; Alarm Stations; Communications: Personnel Training and Qualifications and Safeguards Information. The inspectors reviewed the licensee's actions / performance relating to several potential weaknesses in the above areas which were identified as a result of the Region III analysis of previous inspection findings and 10 CFR 73.71 Security Event Reports. The inspectors also reviewed security issues raised in both of the Licensee's Course of Action Report (September 10, 1985) and the System Review and Test Program Report, Revision A (November 25, 1985) and the licensee's progress on the Central Alarm Station Relocation project. The inspection involved 76 Enclosure contains 8601310070 060127 Upon separation this PDR ADOCK 05000346 O PDR page is Decontrolled

_ - - -

  • *
. ,

inspector-hours onsite by two NRC inspectors. The inspection began during the day shif Two inspector-hours were expended during off-shift period Results: The licensee was found to be in compliance with NRC requirements within the sixteen areas examined during this inspection, although one open item involving lighting was identifie (Details: ' UNCLASSIFIED )

-

!

'

Enclosure contains

,

SAFEGUARDS IfiFORMATIOR h Upon separation this page is Decontrolled i

!

2 l

w_ -