Letter Sequence Other |
|---|
|
Results
Other: ML20092P242, ML20101T400, ML20133P866, ML20133P883, ML20140E062, ML20210P223, ML20212Q088, ML20234F605, ML20236T387, ML20237A449, ML20246J145
|
MONTHYEARML20092P2421984-06-28028 June 1984 Forwards Rept Describing How Util Meets Requirements of Reg Guide 1.97, Instrumentation for Light-Water-Cooled Nuclear Power Plants to Assess Plant & Environ Conditions During & Following Accident, Per Suppl 1 to NUREG-0737 Project stage: Other ML20101T4001985-01-31031 January 1985 Informs That Mods to Neutron Flux Sys Necessary to Meet Reg Guide 1.97 Requirements Processed Through Integrated Living Schedule Program W/Implementation Completed After Sixth Refueling Outage,Per NUREG-0737,Suppl 1 Project stage: Other ML20133P8831985-05-31031 May 1985 Conformance to Reg Guide 1.97,Davis-Besse Nuclear Power Station,Unit 1 Project stage: Other ML20133P8661985-10-16016 October 1985 Forwards Conformance to Reg Guide 1.97,Davis-Besse Nuclear Power Station,Unit 1, Reviewing Util 840628 Submittal. Response to Open Items Requested within 70 Days of Ltr Date Project stage: Other ML20140E0621986-01-27027 January 1986 Forwards Response to Open Items Noted in Interim Rept Transmitted by NRC Re Conformance to Reg Guide 1.97 Project stage: Other IR 05000346/19860031986-01-27027 January 1986 Physical Security Insp Rept 50-346/86-03 on 860106-10.No Violation Noted.Open Item Re Lighting Identified.Major Areas Inspected:Security Organization & Personnel Training.Details Withheld (Ref 10CFR73.21) Project stage: Request ML20210P2231986-09-26026 September 1986 Forwards Response to Re Conformance to Reg Guide 1.97,including Info Concerning Item 3.3.30/4.17 of Interim Rept on Noble Gas Vent from Steam Generator Safety Relief Valves or Atmospheric Dump Valves Project stage: Other ML20212Q0881986-11-30030 November 1986 Conformance to Reg Guide 1.97,Davis-Besse Nuclear Power Station,Unit 1, Informal Rept Project stage: Other ML20236T3871987-11-25025 November 1987 SER Re Conformance to Reg Guide 1.97 Concerning post-accident Monitoring Instrumentation.Design Acceptable Project stage: Other ML20236T3811987-11-25025 November 1987 Forwards SER Re Conformance to Reg Guide 1.97,Rev 3. Post-accident Monitoring Instrumentation Design Acceptable Project stage: Approval ML20237A4491987-12-0404 December 1987 Forwards Technical Evaluation Rept EGG-EA-6941, Conformance to Reg Guide 1.97 Davis-Besse Nuclear Power Station,Unit 1, Inadvertently Omitted from Project stage: Other ML20234F6051987-12-31031 December 1987 Responds to NRC 871125 Requests for Util Confirmation That Certain Outstanding Mods Re Reg Guide 1.97 Would Be Implemented During Fifth & Sixth Refueling Outages.Current Schedule for Outstanding Mods Listed Project stage: Other ML20246J1451989-08-25025 August 1989 Provides Basis for Util Decision Not to Install Main Steam Safety Valve Position Indicators,Per Reg Guide 1.97,Rev 3. Direct Position Indicator Provides No Addl Relevant Info to Operator That Could Not Be Obtained by Monitoring Parameter Project stage: Other 1986-11-30
[Table View] |
Text
..
Docket No. 50-346 votsoo License No. NPF-3 Serial No. 1120 Id "
w
-January 31; 1985 Director of Nuclear Reactor Regulation Attention: Mr.-John F. Stolz Operating Reactor Branch No. 4 Division of Licensing United States Nuclear Regulatory Commission Washington, D. C.
20555
Dear Mr. Stolz:
Gn December 17, 1982, the Nuclear Regulatory Commission (NRC) issued Supplement i to NUREG 0737 " Requirements for Emergency Response Cap-ability" (Generic Letter 82-33) (Log No. 1168).
f
. On June ' 28,1984 (Serial No.1059), Toledo Edison submitted a report describing how we meet the requirements of Regulatory Guide 1.97, "Instrumentstion for Light-Water-Cooled Nuclear Power Plants to Assess Plant and Environs Conditions During and Following an Accident".
Additionally, Toledo Edison committed to provide a proposed schedule for implementation in accordance with Commission Order dated February 21, 1984, as revised June 5, 1984-(Log No. 1527).
In the June 28, 1984 report, Toledo Edison determined that the Neutron
-Flux System would require modifications to meet the Category 1 require-ments of Regulatory Guide 1.97.
This modification has been processed through our Integrated Living Schedule Program ~(ILSP), with an imple-mentation to be completed at the end of the' sixth refueling outage.
' Toledo Edison letter of October 30,-1984 (Serial 1092), identified the implementation activity for modification to the Neutron Flux System (Project 355)' to be completed by' the end of the sixth refueling outage.
Very.truly yours,
= = = -
RFC:SGW:nif-cc: DB-1 NRC Resident Inspector 85020601'44 31 PDR ADOCK O 346
'F PDR 3
0 g0 THE TOLEDO EDISON COMPANY EDISON PLAZA 300 MADISON AVENUE TOLEDO. OHIO 43652 i ;0 -
i