Informs That Mods to Neutron Flux Sys Necessary to Meet Reg Guide 1.97 Requirements Processed Through Integrated Living Schedule Program W/Implementation Completed After Sixth Refueling Outage,Per NUREG-0737,Suppl 1
ML20101T400
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 01/31/1985
From: Crouse R
TOLEDO EDISON CO.
To: Stolz J
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0737, RTR-NUREG-737, RTR-REGGD-01.097, RTR-REGGD-1.097 1120, GL-82-33, TAC-51084, NUDOCS 8502060144
Download: ML20101T400 (1)


Text

..

Docket No. 50-346 votsoo License No. NPF-3 Serial No. 1120 Id "

w

-January 31; 1985 " * " "

Director of Nuclear Reactor Regulation Attention: Mr.-John F. Stolz Operating Reactor Branch No. 4 Division of Licensing

. United States Nuclear Regulatory Commission Washington, D. C. 20555

Dear Mr. Stolz:

Gn December 17, 1982, the Nuclear Regulatory Commission (NRC) issued Supplement i to NUREG 0737 " Requirements for Emergency Response Cap-ability" (Generic Letter 82-33) (Log No. 1168).

f . On June ' 28,1984 (Serial No.1059), Toledo Edison submitted a report describing how we meet the requirements of Regulatory Guide 1.97, "Instrumentstion for Light-Water-Cooled Nuclear Power Plants to Assess Plant and Environs Conditions During and Following an Accident".

Additionally, Toledo Edison committed to provide a proposed schedule for implementation in accordance with Commission Order dated February 21, 1984, as revised June 5, 1984-(Log No. 1527).

In the June 28, 1984 report, Toledo Edison determined that the Neutron

-Flux System would require modifications to meet the Category 1 require-ments of Regulatory Guide 1.97. This modification has been processed through our Integrated Living Schedule Program ~(ILSP), with an imple-mentation to be completed at the end of the' sixth refueling outage.

' Toledo Edison letter of October 30,-1984 (Serial 1092), identified the implementation activity for modification to the Neutron Flux System (Project 355)' to be completed by' the end of the sixth refueling outage.

Very.truly yours,

= = = -

RFC:SGW:nif-cc: DB-1 NRC Resident Inspector 85020601'44 31 PDR ADOCK O 346

'F PDR 03 THE TOLEDO EDISON COMPANY EDISON PLAZA 300 MADISON AVENUE TOLEDO. OHIO 43652 g0 i ;0 -