MONTHYEARML20092P2421984-06-28028 June 1984 Forwards Rept Describing How Util Meets Requirements of Reg Guide 1.97, Instrumentation for Light-Water-Cooled Nuclear Power Plants to Assess Plant & Environ Conditions During & Following Accident, Per Suppl 1 to NUREG-0737 Project stage: Other ML20101T4001985-01-31031 January 1985 Informs That Mods to Neutron Flux Sys Necessary to Meet Reg Guide 1.97 Requirements Processed Through Integrated Living Schedule Program W/Implementation Completed After Sixth Refueling Outage,Per NUREG-0737,Suppl 1 Project stage: Other ML20133P8831985-05-31031 May 1985 Conformance to Reg Guide 1.97,Davis-Besse Nuclear Power Station,Unit 1 Project stage: Other ML20133P8661985-10-16016 October 1985 Forwards Conformance to Reg Guide 1.97,Davis-Besse Nuclear Power Station,Unit 1, Reviewing Util 840628 Submittal. Response to Open Items Requested within 70 Days of Ltr Date Project stage: Other ML20140E0621986-01-27027 January 1986 Forwards Response to Open Items Noted in Interim Rept Transmitted by NRC Re Conformance to Reg Guide 1.97 Project stage: Other IR 05000346/19860031986-01-27027 January 1986 Physical Security Insp Rept 50-346/86-03 on 860106-10.No Violation Noted.Open Item Re Lighting Identified.Major Areas Inspected:Security Organization & Personnel Training.Details Withheld (Ref 10CFR73.21) Project stage: Request ML20210P2231986-09-26026 September 1986 Forwards Response to Re Conformance to Reg Guide 1.97,including Info Concerning Item 3.3.30/4.17 of Interim Rept on Noble Gas Vent from Steam Generator Safety Relief Valves or Atmospheric Dump Valves Project stage: Other ML20212Q0881986-11-30030 November 1986 Conformance to Reg Guide 1.97,Davis-Besse Nuclear Power Station,Unit 1, Informal Rept Project stage: Other ML20236T3871987-11-25025 November 1987 SER Re Conformance to Reg Guide 1.97 Concerning post-accident Monitoring Instrumentation.Design Acceptable Project stage: Other ML20236T3811987-11-25025 November 1987 Forwards SER Re Conformance to Reg Guide 1.97,Rev 3. Post-accident Monitoring Instrumentation Design Acceptable Project stage: Approval ML20237A4491987-12-0404 December 1987 Forwards Technical Evaluation Rept EGG-EA-6941, Conformance to Reg Guide 1.97 Davis-Besse Nuclear Power Station,Unit 1, Inadvertently Omitted from Project stage: Other ML20234F6051987-12-31031 December 1987 Responds to NRC 871125 Requests for Util Confirmation That Certain Outstanding Mods Re Reg Guide 1.97 Would Be Implemented During Fifth & Sixth Refueling Outages.Current Schedule for Outstanding Mods Listed Project stage: Other ML20246J1451989-08-25025 August 1989 Provides Basis for Util Decision Not to Install Main Steam Safety Valve Position Indicators,Per Reg Guide 1.97,Rev 3. Direct Position Indicator Provides No Addl Relevant Info to Operator That Could Not Be Obtained by Monitoring Parameter Project stage: Other 1986-11-30
[Table View] |
Text
-. '
-
U.S. NUCLEAR REGULATORY COMMISSION j
REGION III
Report No. 50-346/86003(DRSS)
Docket No. 50-346 License No. NPF-3 Safeguards Group IV Licensee:
Toledo Edison Company Edison Plaza 300 Madison Avenue Toledo, OH 43652 Facility Name:
Davis-Besse Nuclear Power Station, Unit 1 Inspection At:
Davis-Besse Site, Oak Harbor, OH Inspection Conducted:
January 6-10, 1986 Date of Last Physical Security Inspection:
September 9-12, 1985
//Ep/gf Inspectors:
(
4en '
B. D~rou4n Date Ph c'
Security Inspector-fbef.
I l~
_ kJ.Y 8elanger Oate'
Physical Security Inspector
//d7/86 Approved By:
m J/ R. Creed, Chief Date Safeguards Section Insoection Summary Inspection on January 6-10, 1986 (Report No. 50-346/86003(DRSS))
Areas Inspected:
Included a Review of Management Effectiveness; Security Organization; Records and Reports; Testing and Maintenance; Physical Barriers -
Protected and Vital Areas; Security System Power Supply; Lighting; Compensatory Measures; Access Control - Personnel and Packages; Detection Aids - Protected and Vital Areas; Alarm Stations; Communications: Personnel Training and Qualifications and Safeguards Information.
The inspectors reviewed the licensee's actions / performance relating to several potential weaknesses in the above areas which were identified as a result of the Region III analysis of previous inspection findings and 10 CFR 73.71 Security Event Reports.
The inspectors also reviewed security issues raised in both of the Licensee's Course of Action Report (September 10, 1985) and the System Review and Test Program Report, Revision A (November 25, 1985) and the licensee's progress on the Central Alarm Station Relocation project.
The inspection involved 76 Enclosure contains 8601310070 060127 Upon separation this PDR ADOCK 05000346 O
PDR page is Decontrolled
_ - - -
- .
,
inspector-hours onsite by two NRC inspectors.
The inspection began during the day shift.
Two inspector-hours were expended during off-shift periods.
Results: The licensee was found to be in compliance with NRC requirements within the sixteen areas examined during this inspection, although one open item involving lighting was identified.
(Details: ' UNCLASSIFIED )
- -
!
Enclosure contains
'
SAFEGUARDS IfiFORMATIOR
,
Upon separation this h
page is Decontrolled i
!