Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20211Q4981999-09-10010 September 1999 Proposed Tech Specs Clarifying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits & Adding Ref to Caldon TR for LEFM ML20211G3221999-08-26026 August 1999 Proposed Tech Specs 4.0.6 Re SG Surveillance Requirements ML20212H0771999-08-20020 August 1999 Rev 6 to CPSES Glen Rose,Tx ASME Section XI ISI Program Plan for 1st Interval on 990820. Page 119 in Unit 1 ASME Section XI of Incoming Submittal Not Included ML20212G0821999-08-20020 August 1999 Rev 4 to Augmented Inservice Insp Plan for Cpses,Unit 1 ML20210R7091999-08-13013 August 1999 Revised Proposed Tech Specs for LAR 98-010,proposing Rev to TS Table 3.3.1-1, Rt Sys Instrumentation & TS Table B 3.3.1-1, Rt Sys Setpoints ML20211M0041999-08-0505 August 1999 Rev 31 to Technical Requirements Manual ML20211G7401999-07-27027 July 1999 Revs 29 & 30 to Technical Requirements Manual (TRM) for Cpses,Units 1 & 2 ML20209E1861999-07-0909 July 1999 Proposed Tech Specs,Adding Reactor Core Safety Limit Figures to Section 5.6.5 of Ts,Clarifying That Overpower N-16 Setpoint Remains in TS & Reflecting NRC Approval of TRs Used to Determine Core Operating Limits Presented in COLR ML20212J4251999-06-23023 June 1999 Proposed Tech Specs,Revising EDG Start Be Emergency Start Instead of Normal Start Following Loss of Offsite Power ML20195E5401999-06-0404 June 1999 Proposed Tech Specs Pages 3.2-6,3.4-24,3.4-25,3.7-23,3.7-30, 3.8-25,3.9-9,3.9-10 & 4.0-2,provided as Addl Aditorial Changes Supplementing LAR 99-001 ML20195B6461999-05-27027 May 1999 Marked-up TS Pages Re LAR 99-004,changing Plant Battery Surveillance ML20195B6771999-05-24024 May 1999 Proposed Tech Specs Relocating Parameter Limits Allows for Available Operating & Analytical Margins to Be Used in Most Efficient Manner ML20206G7111999-05-0404 May 1999 Proposed Tech Specs Revising Surveillances Associated with Plant Battery & EDGs & Miscellaneous Editorial Corrections ML20206Q0311999-04-16016 April 1999 Rev 28 to CPSES Technical Requirements Manual ML20205Q1681999-04-14014 April 1999 Rev 27 to CPSES Technical Requirements Manual ML20207F3511999-02-25025 February 1999 Fire Endurance Test to Qualify Protective Envelope for Class IE Electrical Circuits ML20203B0011999-01-25025 January 1999 Rev 10 to Security Training & Qualification Plan ML20211C1071999-01-15015 January 1999 Rev 3 to ASME Section XI ISI Program Plan,Unit 2 - 1st Interval ML20198J3171998-12-21021 December 1998 Proposed Tech Specs,Proposing Changes Administratively for Unit 1 & Increasing Licensed Power for Operation of Unit 2 to 3445 Mwt ML20198J2541998-12-18018 December 1998 Proposed Tech Specs Sections 1.0,3.1,3.3,3.4,3.6,3.7,3.9 & 5.0,converting to ITS ML20198J5211998-12-17017 December 1998 Corrected Tech Specs Pages for Section 3.8 to 971211 Submittal Re TS Conversion Application ML20197K0491998-12-11011 December 1998 Proposed Tech Specs Section 3.8, Electrical Power Systems, Converting to ITS ML20196C5361998-11-20020 November 1998 Proposed TS Converting to ITS Sections 4.0,3.4 & 3.6 ML20195F1751998-11-13013 November 1998 Proposed Tech Specs,Revising Administrative Controls Section to Include Configuration Risk Mgt Program Into CPSES TS ML20195F5291998-11-11011 November 1998 Proposed Tech Specs Revising Core Safety Limit Curves & Overtemperature N-16 Reactor Trip Setpoints for Unit 2 Cycle 5 ML20196B8811998-10-30030 October 1998 Proposed Tech Specs Section 3.3 Re Instrumentation ML20154R7861998-10-21021 October 1998 Proposed Tech Specs Section 3.7, Plant Systems ML20154S2901998-10-14014 October 1998 Proposed Tech Specs Sections 3.1,3.2,3.4,3.5 & 5.0 Re Reactivity Control Sys,Power Distribution Sys,Rcs,Eccs & Administrative Control,Respectively ML20154C9101998-10-0202 October 1998 Proposed Tech Specs 4.0.6, SG SR, Adding Definitions Required for F* Alternate Plugging Criterion & Identifies Portion of Tube Subject to Criteria ML20153E2661998-09-24024 September 1998 Proposed Improved Tech Specs Sections 3.4, RCS & 5.0, Administrative Controls ML20237E8461998-08-28028 August 1998 Proposed Tech Specs Pages Re Sections 1.0,2.0 & 3.0 of Proposed TS Changes in 980707 & s,In Response to NRC RAI ML20154C4511998-07-20020 July 1998 Interim Change Request ISI-1R5-01, Unit 1 ISI Plan,Rev 5 ML20236T9931998-07-20020 July 1998 1RF06 ISI Summary Rept First Interval,Third Period,First Outage for CPSES Unit 1, Commerical Operating Date 900830 ML20236J3131998-07-0101 July 1998 Revised Proposed Tech Specs Pages Re Safety Injection Signal & Blackout Signal ML20249C6101998-06-22022 June 1998 Proposed Tech Specs Section 3.6 Re Conversion Application ML20216B2811998-04-24024 April 1998 Rev 13 to Cpses,Units 1 & 2,IST Plan for Pumps & Valves First Interval ML20216E6291998-04-0909 April 1998 Marked-up TS Pages,Reflecting Proposed Changes in Amends to Licenses NPF-87 & NPF-89 ML20216B1471998-04-0606 April 1998 Proposed Tech Specs,Allowing Plant to Continue to Operate W/O Having to Perform Portions of SRs ML20217A3901998-03-18018 March 1998 Proposed Tech Specs Surveillance Requirements 4.8.1.1.2f.4)a) & 4.8.1.1.2f.6)a) at Power Re Enforcement Discretion ML20216H1361998-03-13013 March 1998 Proposed Tech Specs Re Electrical Systems Surveillance Requirements ML20248L3191998-03-12012 March 1998 Proposed Tech Specs TS 4.8.1.1.2f.4)b) & TS 4.8.1.1.2f.6)b) Re Request for Enforcement Discretion ML20216D6021998-03-0909 March 1998 Proposed Tech Specs Temporarily Removing Requirement to Demonstrate Load Shedding Feature of MCC XEB4-3 as Part of SRs 4.8.1.1.2f.4)a) & 4.8.1.1.2f.6)a),for Unit 2 Only ML20203K8621998-02-27027 February 1998 Proposed Tech Specs,Increasing RWST low-low Level Setpoint ML20203J5211998-02-25025 February 1998 Proposed Tech Specs Page to Remove Requirement to Demonstrate Load Shedding Feature of MCC XEB4-3 as Part of Surveillance Requirements 4.8.1.1.2f.4(a) & 4.8.1.1.2f.7(a) Until Plant Startup Subsequent to Next Refueling Outage ML20203J6151998-02-24024 February 1998 Rev 26 to Technical Requirements Manual ML20217P1531998-02-12012 February 1998 Rev 2 to ISI-2R2-01, Unit 2 ISI Plan ML20202B1641998-02-0505 February 1998 Proposed Tech Specs Bases 3/4.7.1.5 Re Main Steam Line Isolation Valves ML20217P2961998-01-30030 January 1998 Rev 5 to Unit 1 ISI Program Plan ML20202E5981997-11-25025 November 1997 Rev 12 to CPSES Units 1 & 2 IST Testing Plan for Pumps & Valves,First Interval ML20212C3881997-10-24024 October 1997 Proposed Tech Specs Re Revised Core Safety Limit Curves & Revised Overtemperature N-16 Reactor Trip Setpoints 1999-09-10
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20212H0771999-08-20020 August 1999 Rev 6 to CPSES Glen Rose,Tx ASME Section XI ISI Program Plan for 1st Interval on 990820. Page 119 in Unit 1 ASME Section XI of Incoming Submittal Not Included ML20212G0821999-08-20020 August 1999 Rev 4 to Augmented Inservice Insp Plan for Cpses,Unit 1 ML20211M0041999-08-0505 August 1999 Rev 31 to Technical Requirements Manual ML20211G7401999-07-27027 July 1999 Revs 29 & 30 to Technical Requirements Manual (TRM) for Cpses,Units 1 & 2 ML20206Q0311999-04-16016 April 1999 Rev 28 to CPSES Technical Requirements Manual ML20205Q1681999-04-14014 April 1999 Rev 27 to CPSES Technical Requirements Manual ML20203B0011999-01-25025 January 1999 Rev 10 to Security Training & Qualification Plan ML20211C1071999-01-15015 January 1999 Rev 3 to ASME Section XI ISI Program Plan,Unit 2 - 1st Interval ML20154C4511998-07-20020 July 1998 Interim Change Request ISI-1R5-01, Unit 1 ISI Plan,Rev 5 ML20236T9931998-07-20020 July 1998 1RF06 ISI Summary Rept First Interval,Third Period,First Outage for CPSES Unit 1, Commerical Operating Date 900830 ML20216B2811998-04-24024 April 1998 Rev 13 to Cpses,Units 1 & 2,IST Plan for Pumps & Valves First Interval ML20203J6151998-02-24024 February 1998 Rev 26 to Technical Requirements Manual ML20217P1531998-02-12012 February 1998 Rev 2 to ISI-2R2-01, Unit 2 ISI Plan ML20217P2961998-01-30030 January 1998 Rev 5 to Unit 1 ISI Program Plan ML20202E5981997-11-25025 November 1997 Rev 12 to CPSES Units 1 & 2 IST Testing Plan for Pumps & Valves,First Interval ML20212E9811997-10-0606 October 1997 Rev 11 to CPSES Units 1 & 2 IST Plan for Pumps & Valves First Interval ML20210S3911997-09-0303 September 1997 Rev 10 to CPSES Units 1 & 2 Inservice Testing Plan for Pumps & Valves in First Interval ML20151L1391997-07-31031 July 1997 5 to Technical Requirements Manual, for Plant ML20141E6201997-06-26026 June 1997 Rev 24 of CPSES Units 1 & 2 Technical Requirements Manual ML20141F8471997-06-26026 June 1997 Rev 9 to IST Plan for Pumps & Valves First Interval ML20136G4361997-03-13013 March 1997 Rev 23 to CPSES Units 1 & 2 Technical Requirements Manual ML20135A8241997-02-24024 February 1997 Rev 22 to CPSES Units 1 & 2 Technical Requirements Manual ML20134C6831997-01-31031 January 1997 Rev 8 to Comanche Peak Steam Electric Station Units 1 & 2 Inservice Testing Plan for Pumps & Valves First Interval ML20134M4371996-11-13013 November 1996 Self Assessment Guide Program Guidelines ML20129A5991996-10-16016 October 1996 Rev 7 to CPSES Unit 1 & 2 IST Plan for Pumps & Valves First Interval ML20128G7661996-10-0202 October 1996 CPSES Unit 1 & 2 Inservice Testing Plan for Pumps & Valves First Interval ML20138B5181996-10-0101 October 1996 Rev 14 to ODCM for TU Electric CPSES Units 1 & 2 ML20117C8461996-07-19019 July 1996 Glen Rose,Tx ASME Section XI ISI Program Plan,Unit 1 - 1st Interval Rev 4 ML20217M1691996-05-24024 May 1996 Rev 3 to STA-750, Check Valve Reliability Program ML20117C6181996-05-0303 May 1996 Rev 1 to Unit 2 ISI Plan ML20117C6141996-04-14014 April 1996 Rev 1 to Unit 2 ISI Plan ML20107J0941996-04-0202 April 1996 Rev 1 to Interim Change Request ISI-2, CPSES Unit 2 ASME Section XI ISI Program Plan ML20107E4471996-02-0909 February 1996 Rev 1 of CPSES ASME XI ISI Program Plan Unit 2 ML20100B9471996-01-24024 January 1996 Rev 21 of CPSES Units 1 & 2 Technical Requirements Manual ML20086C5491995-06-30030 June 1995 Rev 20 to Technical Requirements Manual ML20091L1941995-03-29029 March 1995 Interim Change Request ISI-IR3-003, Unit 1 ISI Plan ML20081F1131995-03-12012 March 1995 Interim Change Request ISI-1R3-02 to Rev 3 to Unit 1 ISI Plan ML20080Q3351995-02-24024 February 1995 Rev 17 to CPSES Technical Requirements Manual ML20078R6371995-02-15015 February 1995 Rev 5 to CPSES Unit 1 & 2 IST Plan for Pumps & Valves First Interval ML20078H8501994-11-30030 November 1994 CPSES Odmc Rev Change Sheet ML20073L6591994-10-0606 October 1994 Rev 4 to CPSES Unit 1 & 2 IST Plan for Pumps & Valves First Interval ML20072C7081994-07-24024 July 1994 Rev 16 to Simulator Operations/Maint Instruction - 010, Simulator Certification Testing ML20069E5171994-05-17017 May 1994 Interim Change Request ISI-2RO-001, Comanche Peak Ses Unit 2 ISI Program Plan ML20029D0711994-05-11011 May 1994 Rev 16 to Technical Requirements Manual. ML20065K1721994-04-15015 April 1994 Rev 15 to CPSES Units 1 & 2 Technical Requirements Manual ML20058E3841993-11-30030 November 1993 Rev 14 to Technical Requirements Manual, Page 2-27, Clarifying Discussion in Table 2.1.1 Notations for Local Test Connections,Vent & Drain Valves & Revising List of Effective Pages EPL-1 Through EPL-4 ML20058C4441993-11-23023 November 1993 IST Plan for Pumps & Valves First Interval, Rev 3 ML20058B5791993-11-19019 November 1993 Rev 14 to Comanche Peak Steam Electric Station Technical Requirements Manual ML20058J9711993-11-19019 November 1993 Interim Change Request ISI-1R2-005 to Rev 2 to Unit 1 ISI Plan ML20056D8161993-08-11011 August 1993 Salp,Directive 8.6 1999-08-05
[Table view] |
Text
_
o .,
. PROCEDURE ISSUE REVISION PAGE TEXAS UTILITIES GENERATING CO NUMBER DATE CPSES C P-QP- 18. 5 2 12/2/80 1 of 4 PREPARED BY: , , xm ._., DATE /2 - / 7C
/ 7 AUTOMATED RECORDS MANAGEMENT SYSTEM IMPLEMENTATION APPROVED BY: ! DATE /z/d c/
1.0 REFERENCES
1-A CP-QP-18.2, " Implementation of the Pennanent Plant Records Manage-ment System" 2.0 GENERAL F@ NC.::l.AT!0h ON_Y 2.1 PURPOSE AND SCOPE The purpose of this Porcedure is to establish the basic defini-tions, operational, and interface requirements for the implemen-tation of ARMS required in Reference 1-A at CPSES. This Proce-dure applies to site operations and use of the Records Management i System Index (RMSI) and the Microfiche Retrieval System (MRS) subsystems of the ARMS.
2.2 TERMS AND DEFINITIONS 2.2.1 Arms The Automated Records Management System is a computer-assisted records storage and retrieval system supplied to TUGC0 by the TERA Corporation. The ARMS is comprised of the RMSI and the MRS subsystems.
2.2.2 RMSI The Records Management System Index subsystem is a computer data base which contains index data for the project records as they are indexed into the ARMS system. The system uses a DATA General Eclipse C-330 mini-computer and associated peripherals located on site. Index data stored in the computer memories for station records will be available to all station personnel through a system of remote Cathode Ray Tube (CRT) tenninals located at ko[I 15
--h0a'9 860630 -
Form No. 2 TUGCO CA EA-85-5*S z n
-?
. _ _ . _ _ . .i_..
9 PROCEDURE REVISION ISSUE PAGE NUMBER DATE TEXAS UTILITIES GENERATING CO.
C P-QP-18. 5 2 12/2/80 2 of 4 strategic locations throughout the site. In addition, CRT tenni-nals are placed in Texas Utilities Dallas offices, connected by a telecommunications link to the on-site computer.
2.2.3 MRS The Microfiche Retrieval System, the second ARMS subsystem, is a microfilm document distribution system. The MRS provides remote viewing capability at any of the established station microfilm libraries. Necessary microfilming facilities are located on-site.
2.3 ARMS FUNCTIONAL DESCRIPTION The Automated Records Management System is pictorially described
~
in Figure 1.
3.0 PROCEDURE 3.1 DATA CAPTURE Data capture into the RMSI shall be perfonned by the ARMS index/
tec"nical coding group in accordance with the ARMS Coding Manual.
Index data shall be captured from the target document itself.
3.2 OPERATIONS AND INTERFACING All data capture and technical coding shall be coordinated closely by the Records Management Coordinator or his designee, as well as interface activities with Document Control Microfilm Center.
All documents that have been ARMS inde'xed shall be indelibly noted so on the front page of each document.
Indexing shall be accomplished in accordance with the appropriate procedure for the document type and with the ARMS Coding Manual .
Those documents to be microfilmed shall be " batched" in groups not to exceed 239 pages and shall be stamped with the microfiche /
batch number and frame /page number on each page.
3.3 MICROFICHE RECORDS CONTROL Those documents designated to be microfilmed will be available to CPSES personnel at a number of microfilm libraries throughout the site. Upon completion of a microfiche, the fiche shall be repro- i duced for addition to each of the MRS stations and dispersed by Microfilm Center Personnel .
~~
"c"
E .
g PR U REVISION l NUMBER PAGE TEXAS UTILITIES GENERATING CO.
CPSES C P-QP-18. 5 2 12/2/80 3 of 4 Certain MRS stations will be furnished a complete microfiche library while others, depending on need, will be furnished only an inventory of the most current fiche.
3.4 CONTROL AND STORAGE OF DATABASE-BACKUP ARCHIVAL TAPE During the last five days or the first five days of each calendar month (specific time to be determined by the Computer Operations Coordinator) at least one set of canputer backup tapes shall be designated to be tested by reading them into a set of disk packs or disk pack.
If the read-in is successful as detennined by the Computer Opera-tions Coordinator, then that set of tapes will be set aside from use and designated as the " monthly archival tape set".
The " monthly archival tape set" shall be stored, after testing, in the TUGC0 Administrative Building where they will be kept in a locked device and retrievable only with the consent 7f the TUGC0 Administrative Supervisor.
When another set of " monthly archival tapes" have been recorded and read into the backup disk and it has been detemined that the backup tapes are satisfactory, then the newest or latest set
=
shall be exchanged with the previous months archival tape set which will be re-entered into the nomal rotation of database backup tape sets.
Form No. 3 TUGCO OA
-a
__m.__ _ _ -, . . - . , _ _ . , , . _ , . . . , . , . . . , , , - . . . .
g g a.&.4 4em
. r .
g j
PROCEDURE REVISION ISSUE NUMBER DATE PAGE TEXAS UTILITIES GENERATING CO.
CPSES CP-QP-18.5 2 12/2/80 4 of 4
/
FIGURE 1 Avvouare s PteenS t M AN AG Edu ety S Y ST24 (A*MO p sy ,maree n,au a u -
[ q 9' ram - - l l O 9 i
==
y$.
b =
f; . 7
% ,5 l
) L Y- $
N #' E fr . t. 2]t.'
~~
,e S@is-~ l O => 1 rei
=
Ci m-
._ s. 'j l we . . . . . , =>b
?' t
.m.'rM GE5m&
_ . :==.
n
,, .penc ,g0ecuecamamg ,
3 --
gae _1 L@
Redgj e ,s .
i i
t j
em .
W i
Form No. 3 TUGCO OA l
5 PROCEDURE REVISION ISSUE
" NUMBER DATE PAGE T'EXAS UTILITIES GENERATING.CO CPSES .
l CP-QP- 18. 07 0 2/27/81 1 of 2 PREPARED BY:
t/ DATE N-5 and N-3 CODE DATA REPORTS APPROVED BY: ~
I!Z7!8/
DATE'
1.0 REFERENCES
1.1 ASME Section III Division 1 FOR lFORMA00I\' 0';' Y--
2.0 GENERAL 2.1 PURPOSE The purpose of this procedure is to outline the responsibilities and the famat for the preparation of the N-5 and N-3 Code Data Reportss 3.0 PROCEDURE 3.1 N-5 DATA REPORT The N-5 Data Report will be prepared under the direction of the B&R Site QA Manager on an ongoing basis as items in the system /
subsystem are cmplete. This will be accomplished by inputting pertinent information into a Systems 6 computer program, which will include all of the following:
A. Components
- 8. Appurtenances C. Piping Subassemblies D. Field Welds E. Component Supports This program shall contain all information required on the N-5 Data Report. along with a description of the supporting docu-mentation for each (Code Data Report, Manufacturer's Transmittal Form, Certified Mill Test Reports, Weld Data Package, etc.) and the file location of the hard copy of each of these documents.
The program shall status each of these support documents which have been satisfactorily reviewed by B&R and their ANI.
'"SCLp0N%~~
FC;A-85-59
, _ . , me= o. au .
l 4 3 f i'
PROCEDURE I i . REVISION PAGE TEXAS UTILITIES GENERATING CO.
CPSES CP-QP-18.07 0 2/ 27 / 81 2 of 2 Upon completion of satisfactory review of documentation for all items contained in the system, a copy of the computer printout shall be attached to a N-5 Data Report similar in fomat to the sample fonn in Appendix V of ASME Section III, j Subsection NA.
Brown & Root and their ANI will certify the N-5 by signature following acceptable review of all items in the system, satis-factory hydrostatic / pneumatic test and all other required items such as Code Stress Analysis have been completed. This shall certify that the system installation is complete and in compliance with requirements of ASME Section III, Division 1..
- 3.2 N-3 DATA REPORT
, . The N-3 Data Report shall be initiated by TUGC0 after systems have an N-5 Data Report certified by both B&R and their ANI. The N-3 shall list all N-5 Data Reports prepared by B&R and have a copy attached, complete with the computer printouts described above for the N-5 Data Report.
The N-3 will be signed by a TUGC0 representative certifying that each manufacturer or installer was the holder of the appropriate Certificate of Authorization, and that all cmponents and instal-ation complies with the requirements of ASME Section III, Division 1.
The completed N-3 Data Report shall then be forwarded to the Authorized Nuclear '.ntpector for his review and signature.
3 TUGCO OA Form Na 3