- - _ _ _ _ _ - - _ _ _ _ _ _
SRCiiN & RC07, DiC.
ISSUE Cp!ES NUMBER RE7ISICN CATI PAGE APR M 198f 1
- 17 CP-QAP-12.1 6
CRIGINATOR: b c d b k t N c [ w ei2 - 3 3 TITt.5:
CATE INSPECTION CRITERIA
/
REVI~ ED SY:
I
/-
- -/2 -37 AND DOCUMENTATION d
REQUIREMENTS PRIOR f
CATE I
Y-/.2 -37 7
CR T ON APPROVED BY:
51ta QA Manager QATE
1.0 REFERENCES
1-A QI-QAP-2.1-5, " Training and Certification of Mechanical Inspection Personnel" 1-B QI-QAP-11.1-28, " Fabrication, Installation Inspection of ASME Component Supports, Class 1, 2, and 3" 1-C CP-QAP-16.1, " Control of Nonconforming Items" 1-0 CP-QAP-12.3, "Tes ting Phase Quality Assurance Functions Prior to ASME Code Certification and Stamping" 1-E CP-QAP-12.2, " Inspection Procedure and Acceptance Criteria for ASME Pressure Testing" 1-F QI-QAP-11.1-26, "ASME Pipe Fabrication and Ins tallation Ins pections" 2.0 GENERAL l
2.1 PURPOSE The purpose of this procedure is to establish requirements for a system / subsystem walkdown and verification by the Quality Control (QC) Group prior to:
a.
Release for flushing and preoperational testing b.
Pressure testing c.
Release for preparation on N-5 Data Rep
(
d.
Release for penetration sealing I
e.
Verification that piping hangers comply with vendor certified drawings (-large bore) or design reviewed drawings (small bore).
?0R VORMA70X ONLY
- - - - 8607100164 860630 PDR FOIA PDR GARDE 85-59
BROWN & ROOT, INC.
ISSUE CPSES NUMBER REVISION DATE PAGE JOB 35-1195 2 # 17 CP-QAP-12.1 6
g 7 1993 2
2.2 SCOPE The scope of this procedure applies to all ASME Section III piping and components being inspected for release.
2.3 RESPONSIBILITY The QC Group Supervisor shall be responsible for the overall implementation of this procedure.
All inspection personnel performing inspections required by this procedure shall be trained, qualified and certified in accordance with Reference 1-A.
The Quality Engineering (QE) Completions / Start-up Group Supervisor shall be responsible for supplying Quality Control with all the documentation required to perform piping systen status walkdowns and component support design ver.ifications.
3.0 PROCEDURE 3.1 PREOPERATIONAL/ TESTING WALKDOWN The walkdown status of the piping system /subsysten shall be perfonned using the "QC Preoperational/ Flushing Checklist" (Attachment 1), and BRP drawings.
The following infonnation shall be recorded on the System Verification Fonn (Attachment 7) during preoperational/
testing walkdown:
a.
Manufacturers' identification / serial number of all ASME 1
stamped items (i.e. piping subassemblies, valves, pumps and vessels), within the boundries of the BRP.
b.
Material identification (i.e., Heat numbers, heat code, material specification) for material supplied by B&R, if available.
General hanger locations and hanger number for pennanent hangers and attachments to piping shall be recorded on the BRP.
mq M'
SROWN & ROOT, INC.
ISSUE CPSES NUMBER REVISION DATE PAGE JOB 35-1195 3 of 17 CP-QAP-12.1 6
g [., r,.y 3.2 PRE-PRESSURE TEST WALKDOWN The pre-pressure test walkdown status of the piping system /
subsystem shall be perfomed using the "QC Pre-pressure Test Checklist" (Attachment 2), current BRP drawing, previous BRP drawings and any CMC's that have not been incorporated into the latest drawings.
Valves, pumps, vessels, piping subassemblies and/or Brown &
Root supplied material that has been installed by a CMC or a revision to the BRP used during that last walkdown shall have their identification / serial number or material identification recorded on the System Verification Fom (Attachment 7).
All additional component supports shall be recorded on the BRP. (reference paragraph 3.1).
3.3 N-5 WALKDOWN The final status walkdown to verify completion of the piping system shall be performed using the "QC N-5 Checklist" (Attachment 3) and current BRP's, BRHL's, Vendor Certified or Design Reviewed Drawings.
The QCI'shall record all component support numbers and general location on the respective BRP's.
3.4 RELEASE FOR PENETRATION SEALING The Area Management Penetrations Seals Supervisor shall notify QC Systems Superintendent of piping penetrations they want released for sealing.
The QC Systems Lead shall verify the penetration meets tne following acceptance requi'rements:
a.
All welds inside penetrations are completed, pressure tested and acceptable.
b.
No base material defects.
c.
Free of foreign material.
3__ -
m w-.
5
.-g
, _. _, = _.
g---__-..,.
-m
BROWN & ROOT, INC.
ISSUE CPSES NUMBER REVISION DATE PAGE JOB 35-1195 CP-QAP-12.1 6
APR 12 i983 4 f 17 d.
Hangers and pemanent attachments required are ins talled.
e.
Pipe clearance and gradient.
The QC Group will notify Area Management of penetrations i
acceptable for sealing.
Prior to releasing a penetration for sealing, the Penetration Seal Release Fonn (Attachment 4) l shall be completed and submitted to the ANI for his concurrence. Completed Penetration Seal Release Forms shall be forwarded to Area Management.
3.5 COMPONENT SUPPORT DESIGN VERIFICATION The QC Systems Leads shall be responsible for performing an inspection of all ASME component supports to verify they are in compliance with the vendor certified (Large Bore) or design reviewed (Small Bore) drawings.
Inspections of conpanent supports shall be performed using the "QC Component Support Checklist" ( Attachment 5).
Any welds on component supports that are not required by the vendor certified or design reviewed drawing shall be inspected in accordance with the requirements of Reference 1-8.
Actual weld sizes shall be documented on the vendor certified or design review drawing.
3.6 SYSTEM / SUBSYSTEM DOCUMENTATION All items defined on the "QC Checklist" as unsatisfactory shall be documented on the "QC Punchlist" (Attachment 6).
Base material defects and arc strikes shall be identified and resolved per Reference 1-C, in addition to being-recorded on the "QC Punchlist".
When the prerelease walkdown is completed, the QC leads shall return walkdown documentation supplied by Quality Engineering and a copy of the "QC Punchlis t" to the QE Completions / Start-up Group for coordinating resolution of punchlist items (Reference 1-0).
The QE Completions / Start-up Group shall notify the responsible QC Systems leads when the "QC Punchlist" items have been corrected by returning their copy of the Punchlist and supporting documentation to the QC leads. The corrected items will be reinspected to verify acceptability and a copy of the punchlist returned to the QE Completions / Start-up Group.
~
.?-
^
4
.a
l BROWN & ROOT, INC.
ISSUE CPSES NUMBER REVISION DATE PAGE J08 35-1195 CP-QAP-12.1 6
APR 121983 5 of 17 I
1 Any unsatisfactory items that require an Engineeri.g evaluation or rework will be identified on NCR's in accordance with Reference 1-C.
A system or portion of a system shall not be considered i
completed until Quality Assurance has verified through the l
above mentioned QC walkdown and QE Systems documentation review that all pennanent piping, valves, pumps and hangers are complete and intact and have been installed in accordance 4
wi th current design documentation (i.e.,
BRP drawings, BRHL's, BRH's, GHH's, CMC's, etc. ).
Also the pressure test shall have been completed and accepted by the ANI and the Owner in accordance with Reference 1-E.
e o
____m,-
BROWN & ROOT, INC.
ISSUE CPSES NUMBER REVISION DATE PAGE
~
l CP-QAP-12.1 6
APR 121c91 6 of 17 ATTACHMENT 1 OC PREOPERATIONAL/ FLUSHING CHECKLIST Prerelease No.
Unsat Items
~!
l l
1 I
l l
j
BROWN & ROOT. INC.
ISSUE CPSES NUMBER REVISION DATE PAGE JOB 35-1195 7 f 17 CP-QAP-12.1 6
APR 121923 ATTACINENT 1 (Continued)
QC PRERELEASE CHECKLIST ITEMS INSPECTION CRITERIA QCI/0 ATE SAT /UNSAT 1.
The tanperature and pressure indicated on the Code Data Plate for valves and equipment is in compliance with the piping design requirements indicated on BRP drawings.
2.
Valve location and orientation is in accordance with the design documents.
3.
ASME Code Name Plates are attached to "N" stamped pumps and vessels.
4.
Items show no visible sign of damage.
5.
For liquid service, stops are removed from support spring cans.
6.
For steam, gas or air service the stops are installed in support spring cans.
COMMENTS:
d i
t i
i 4
i 1
-- g -
- 9'
BROWN & ROOT. INC.
ISSUE CPSES NUMBER REVISION DATE PAGE JOB 35-1195 8 f 17 CP-QAP-12.1 6
APR 121981 4
ATTACHMENT 2 4
OC PRE-PRESSURE TEST CHECXLIST Pressure Test System QC Checklist BRP & Rev.
CMC Unsat Item 4
e e
O f
l i
- = -
N DM ew
,_.Q w
e eny--
.n
..e-
-,--.._a,,
g.,_.-
m,-
,.-.,-, m
BROWN & ROOT, INC.
ISSUE CPSES NUMBER REVISION DATE PAGE CP-QAP-12.1 6
APR 121997 9 of 17 ATTACINENT 2 (Continued)
ITEMS INSPECTION CRITERIA OCI/0 ATE SAT /UNSAT 1.
All items within the test boundary are complete and readily accessible.
2.
Gradient: 3/16" per foot maximum (this applies to horizontal lines deviating from level only. Deviations from plumbness of vertical lines and horizontal 4
departure from design will be controlled by the two-inch tolerance on location.)
i 3.
The size of all pipe socket welds shall be checked to the requirements of Reference 1-F.
4.
All items in the pressure test boundary are free from arc strikes and base metal defects, when identified, they shall be handled in accordance with Reference 1-C.
~
NOTE:
Piping shall be installed within the following tolerances of items 6 thru 9.
5.
Slope - Minimum slope shall be as designated on the drawings.
6.
Clearance - A minimum of two inches of clearance shall be maintained, including pipe insulation with respect to other piping when one or both lines have an operating temperature of 200*F or greater.
All other lines may be installed with a minimum of one-inch clearance, with respect to other piping.
-p--
,--,,,m p-,---, - -
y e
+
-,,+-m, g,-,-
w
i BROWN & ROOT, INC.
ISSUE CPSES NUMBER REVISION DATE pAGE CP-QAP-12.1 6
APR 12 G83 10 of 17 ATTAClf4ENT 2 (Continued)
ITEMS INSPECTION CRITERIA OCI/0 ATE SAT /UNSAT 7.
For clearance of pipe (with an operating temperature of 200*F or greater) from hangers, walls, ceiling, hand rails, etc.,
other than pipe to pipe, a minimum of one inch shall be maintained, including pipe insulation. All other lines may be installed with a clearance only for insulation; however, on a case by case basis it might be necessary to notch insulation to establish clearance which will require engineering approval.
8.
When installed in blockouts, sleeves '
I shall be installed so that, for lines i
with operating temperatures at or above 200*F, their centerlines are within 1/4 inch of piping centerlines. For lines with operating temperatures of less than 200*F, the sleeve inside diameter must be no less than 1/2 inch j
from pipe outside diameter.
9.
All bolts installed in flanged connections.
- 10. Bolting material shall be verified by heat number or color code. Document heat number / color code on Attachment 7.
NOTE:
Any valves and equipment iristalled with CMC's or revisions to the BRP used during the last j
walkdown must have items 12 thru 16 complied with.
- 11. The temperature and pressure indicated on the Code Data Plate for valves and equipment is in compliance with the i
piping design requirements indicated on BRP drawings.
t
SROWN & ROOT, INC.
ISSUE CPSES NUMBER REVISION DATE PAGE
~
11 of 17 CP-QAP-12.1 6
Apg 13 Jgg3 ATTACMENT 2 (Continued)
I ITEMS INSPECTION CRITERIA OCI/0 ATE SAT /UNSAT j
- 12. Valve location and orientation is in accordance with the design documents.
- 13. For in-line concentrated loads or equipment tie-ins, a support (pennanent or temporary) should be located as close as possible.
- 14. For liquid service, stops are removed fran support spring cans.
l
- 15. For steam, gas or air service the stops are installed in support spring cans.
- 16. Identify all hangers and permanent attachments on BRP.
1
' ^
n,--w-.,
,,.__e
--ne- - - -
-,--,,----,,-gn.
-g-,
ew-,-e..mp.
m
i l
3ROWN & ROOT, INC.
ISSUE CPSES NUMBER REVISION DATE PAGE l
JOB 35-1195 j
APR 121983 12 of 17
+
ATTACHMENT 3 l.
OC N-5 CHECXLIST System Checklist Checklist BRP Unsat BRHL Unsat Items Items 4
Rev Rev i
t i
l
~
Checklist Checklist BRH/GHH Unsat Vendor Unsat Itsus Orawing Items Rev i
)
i__.___..___,_.._._
_ _ _. _. _ _ _ - _. _ _ _...... ~ _.
4 j
BR0liN & ROOT, INC.
ISSUE CPSES NUMBER REVISION DATE PAGE JOB 35-1195 CP-QAP-12.1 6
13 # 17 APR 12190 i
ATTACHMENT 3 (Continued)
ITEMS INSPECTION CRITE.aIA QCI/0 ATE SAT /UNSAT l
1.
Piping system / subsystem and component supports show no visible sign of damage.
2.
All punchlist items have been corrected.
3.
All pennanent component supports are installed per final design J
drawings.
4.
Piping configuration complies with BRP's.
5.
All Equipment indicated on BRP is installed.
l C(MtENTS:
i i
l I
l i
l W
l
I I
l SROWN & ROOT, INC.
ISSUE l
CPSES NUMBER REVISION l OATE PAGE i
I -QAP-12.1 6
' APR 12 59.
14 of 17 JOB 35-1195 CP I
ATTACHMENT 4 1
RELEASE FOR HIGH OENSITY PENETRATION SEALS i
i PENETRATION SEAL RELEASE FORM Report #
Date Room 9 BLDG. #
Sisco Owg.
Released for sealing by:
QC l
ANI Exceptions - Holds l
i i
i 4
l i
l i
i
^
~
SROWN & ROOT, INC.
ISSUE CPSES NUMBER REVISION OATE PAGE J08 35-1195 15 of 17 CP-QAP-12.1 6
ppg 7g 7gg ATTACHMENT 5 QUALITY CONTROL CIMPONENT SUPPORT CHECXLIST HANGER NUMBER ITEMS INSPECTION CRITERIA OCI/DATE SAT /UNSAT I
1.
Support configuration complies with vendor (Large Bore) or Design certified drawing (Small Bore).
Reviewed Drawing 2.
Al l parts are ins tal l ed (i.e., bol ts, nuts,
"U" clamps,etc.)
i 3.
All accessable welds reinspected and are in compliance with Vendor Certified or Design Reviewed Drawings.
-4.
All skewed welds have been reinspected and are in compliance with the Vendor Certified or Design Reviewed Drawings.
5.
Support completed.
6.
Comments:
I i
l 4
i s i
l d
7_
'l
.n
'.-,,.,,--,,.---~-._-,.-,----------w-..
---..--------r--,,-_,,_,,-,.r,.
-..-w
--.-..--.,,.,...-,--w-
.----.,_y___---.x..-.,
- - -e..
SROW & ROOT, INC.
ISSUE CPSES NUMBER REVISION DATE PAGE JC8 35-1195 CP-QAP-12.1 6
APR 121983 16 f 17 ATTACHMENT 6 i
I og>u.1 tur m.
PNm W
gg w I
ammasum mammune tswimmusum j
i--
M N (N 3 IE3 ?EB.)
)6 1
i 1
l I
1.
I 1
i i
l l
i I
l I
l I
I i
i I
f I
I i
i I
l l
- E i a
l l
I 4
j l
3 l
SROWN & ROOT. INC.
ISSUE CPSES NUMBER REVISION OATE PAGE J08 35-1195 CP-QAP-12.1 6
APR 121983 17 of 17 ATTACHMENT 7 i
SYSTEM VERIFICATION FORM ORAWING REV.
AT j
,idf(
HT.#
S/N#
W PC.#
l l
a 1
}
t i
1 i
i 8
i i
j i
wwe--