ML20149D553

From kanterella
Revision as of 02:49, 27 October 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Insp Repts 50-295/93-17 & 50-304/93-17 on 930817-20.No Violations Noted
ML20149D553
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 09/15/1993
From: Kozak T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Delgeorge L
COMMONWEALTH EDISON CO.
Shared Package
ML20149D556 List:
References
NUDOCS 9309210071
Download: ML20149D553 (2)


See also: IR 05000295/1993017

Text

  • s

000

.

SEP 151993

Docket No. 50-295

Docket No. 50-304

Commonwealth Edison Company

ATTN: Mr. L. O. DelGeorge, Vice President

Nuclear Oversight and

Regulatory Services

Executive Towers West III

-

1400 Opus Place, Suite 300

Downers Grove, IL 60515

Dear Mr. DelGeorge:

SUBJECT: ROUTINE RADI0 CHEMISTRY INSPECTION AT ZION NUCLEAR GENERATING

STATION ON AUGUST 17 THROUGH 20, 1993

This refers to the routine safety inspection conducted by Dr. J. E. House and

Mr. Steven Orth of this office on August 17 through 20, 1993. The inspection

included a review of authorized activities for your Zion facility. At the

conclusion of the inspection, the findings were discussed with those members

of your staff identified in the enclosed report.

Areas examined during the inspection are identified in the report. Within

these areas, the inspection consisted of a selective examination of procedures

and representative records, interviews with personnel, and observation of

activities in progress. In addition, our Mobile Laboratory was at the site

during the inspection to perform independent measurements of radioactivity.

No violations of NRC requirements were identified during the course of this

inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC

Public Document Room.

i

l

l

!

!

\

I  !

9309210071 930913

PDR )

a ADOCK 05000295 7.. g 0 g

eda j

I, i

l

L

__ - ._

.

.

Commonwealth Edison Company 2

SEP 15 993

1  ;

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

Thomas J. Kozak, Acting Chief

Radiological Controls Section 2

Enclosure: Inspection Reports

No. 50-295/93017(DRSS);

No. 50-304/93017(DRSS)

cc w/ enclosure:

R. Tuetken, Site Vice President

T. Broccolo, Station Manager

S. Kaplan, Regulatory Assurance

Supervisor

D. Farrar, Nuclear Regulatory

Services Manager

I. Johnson, Corporate

EP Director

0C/LFDCB

Resident Inspectors, Byron,

Braidwood, Zion

Richard Hubbard

J. W. McCaffrey, Chief, Public

Utilities Division

,

Mayor, City of Zion

Licensing Project Manager, NRR

Robert Newmann, Office of Public

Counsel

W>ert M. Thompson, Administrator

Wisconsin Division of Emergency .

Government

State Liaison Officer

Chairman, Illinois Commerce

Commission

bec w/ enclosure:

PUBLIC

>

RIII RIII p

u p ak Fa r

09//(/93 f '7//r/j3 1/gg 13

. - . -.