Forwards Listing of Emergency Operating Procedures Actions Specified by Procedure to Be Performed Outside Control Room, Showing Basis for Concluding Action Can Be Performed
ML20149J544
Person / Time
Site: Rancho Seco
Issue date: 02/11/1988
From: Firlit J
SACRAMENTO MUNICIPAL UTILITY DISTRICT
To: Miraglia F
Office of Nuclear Reactor Regulation
References
AGM-NPP-88-072, AGM-NPP-88-72, NUDOCS 8802230108
Download: ML20149J544 (3)


Text

- - - _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _____

b uuo SACRAMENTO MUNICIPAL UTIUTY DISTNCT Q P. O. Box 1583o, Sacramento CA 95852183o,1916t 452 3211 AN ELECTRIC SYSTEM SERVING THE HEART OF CAllFOHNIA AGM/NPP 88-072 February 11, 1988 U. S. Nuclear Regulatory Commission Attn: Frank J. Miraglia, Jr.

Associate Director for Projects Phillips Building 7920 Norfolk Avenue Bethesda, MD 20014 i Docket No. 50-312 Rancho Seco Nuclear Generating Station License No. DPR-54 EMERGENCY OPERATING PROCEDURE WALKDOWN

Dear Mr. Miraglia:

The District completed an evaluation of the Emergency Operating Procedures (EOPs) confirming the E0Ps can be performed, including the actions outside the l Control Room.

1 l Since December 1985 there have been six weeks of simulator training l extensively using the E0Ps by each operating crew. This, along with the E0P verification and validation program, provides assurance that required actions  !

can be performed in the Control Room. The actions required to be performed outside the Control Room have been performed either during an actual  ;

transient, during nomal plant operations, or testing. Attached is a listing of E0P actions specified by procedure to be performed outside the Control Room, showing the basis for concluding the action can be performed.

i Please contact me if you have any questions. Members of your staff with questions requiring additional information or clarification may contact Mr. Jerry Delezenski at (209) 333-2935, extension 4914 Sincerely, rJoseph F. Firlit Assistant General Manager Nuclear Power Prnduction Attachment ftd 8802230106 B00211 PDR ADOCK 05000312 i, i

P PDR RANCHO SECO NUCLEAR GENERATING STATION O 14440 Ten Cities Road, Herald, CA 9563* 9799;(209) 333 2935

i

  • -
  • AGM/NPP 88-072 Attachment 1 Page 1 of 2 t

ACTIONS TO BE PERF0 RED OUTSIDE THE CONTROL ROOM E0P f/Rev Step # Action (Basis *) '

2/6 1.4.2 Open CR0 Breakers in East 480V SWGR Room (standard local breaker operation) t' 1.5.3.2 8 3 Open BWS-040, 054 '

(standard local manual 2" valve operation and valves verified to be accessible) 1.6 Sample the RCS (normal chemistry procedure) 5.3, 13.5 Verify Aux. Steam Pressure Controlling at  !

Setpoint '

(header pressure is checked locally on standard local pressure gauge) 8.5 Place RB H2 Monitors in service I

(performed per nomal operating procedure) l 3/4 4.0 Place RB H2 Monitors in service l (performed per normal operating procedure) l 5.0 Isolate possible leaks:

HV-21516 & HV-21514 Must be racked in to verify that these valves are closed. (standard local breaker operation) 4/8 11.2.1 Open the Hot Leg HPVs Requires installing local fuses. (performed by routine surveillance procedure) i 1

5/10 4.1 .

I 6/8 16.1 Close: MSS-060, 61., 62, 63, 64, 65, CP.101/5 10.2 66, 67 (standard local manual 1" valve operation and valves verified to be accessible) ,

I 6/8 1.1 Sample OTSG Boron .

(nomal chemistry procedure) 5.0, 9.0 Divert Basins; Isolate Condensate Reject;  !

Stop Cooling Tower Blowdown & NSRW Recirc; l Aux Boiler in service; Reduce to Three t Polishers (normal operating procedures) l l

l

a a AGM/NPP C-072 Attachment 1 Page 2 of 2 E0P f/Rev Step # Action _

10.3 Pin MS lines (normal maintenance function each time OTSGs placed in wet layup) 14.2.3 Cycle the PZR H.P.Y Requires installing local fuses 1(performed by routine surveillance procedure) 20.1.2 Open PZR & Hot Leg HPYs i Requires installing local fuses. (perfomed by routine surveillance procedure) 23.2 Open Hot leg HPYs Requires installing local fu3es. (performed by routine surveillance procedure) 7/6 9.0, 16.3 Open all HPVs Requires installing local fuses. (performed by routine surveillance procedure) 14.1.2 Locally close breaker to start RCPs (local controls verified to be present nM accessible. Operated with breaker in test position)

CP.101/5 CP.103/5 Rack' in CFT Isolation valve breakers CP.104/5 (standard breaker operating procedure)

CP.105/4 CP.101/5 12.10.1 Put H2 Recombiners in service (normal operating procedure) ,

12.11.1 If Makeup is unavailable Cycle NRW-041, 42 NSRW Spray Pond Interlock Valve (local manual valve operation. Routinely perfomed by nomal procedures for freeze protection) 13.2.4 Rack in HY-20003 breaker (standard breaker operating procedure)

CP.101/5 7.0 Rack in RB Sunp Valves to OHS suction CP.103/5 14.0 (standard breaker operating procedure)

Basis for concluding that the actions can he performed.