| | Site | Start date | Title | Description |
|---|
| IR 05000530/2025013 | Palo Verde | 8 January 2026 | NRC Inspection Report 05000530/2025013 | | | ML25079A307 | | 31 December 2025 | Draft Regulatory Guide DG-1446, (RG 1.84 Rev 41) Design, Fabrication, and Materials Code Case Acceptability, ASME Section III | | | IR 05000352/2025003 | Limerick | 22 December 2025 | Integrated Inspection Report 05000352/2025003 and 05000353/2025003 | | | IR 05000387/2025003 | Susquehanna | 22 December 2025 | Integrated Inspection Report 05000387/2025003 and 05000388/2025003, Independent Spent Fuel Storage Installation IR 07200028/2024001 and 07200028/2025001, and Exercise of Enforcement Discretion | | | ML25290A064 | Susquehanna | 13 October 2025 | Updated Final Safety Analysis Report, Rev. 72, Chapter 8, Section 8.1, Introduction | | | ML25290A058 | Susquehanna | 13 October 2025 | Updated Final Safety Analysis Report, Rev. 72, Chapter 7, Section 7.4, Systems Required for Safe Shutdown | | | ML25290A026 | Susquehanna | 13 October 2025 | Updated Final Safety Analysis Report, Rev. 72, Chapter 3, Section 3.14, License Renewal Programs, TLAA, and Commitments | | | ML25290A068 | Susquehanna | 13 October 2025 | Updated Final Safety Analysis Report, Rev. 72, Chapter 9, Section 9.1, Fuel Storage and Handling | | | ML25290A065 | Susquehanna | 13 October 2025 | Updated Final Safety Analysis Report, Rev. 72, Chapter 8, Section 8.3, On-Site Power Systems | | | ML25290A030 | Susquehanna | 13 October 2025 | Updated Final Safety Analysis Report, Rev. 72, Chapter 3, Section 3.7, Seismic Design | |
|