ML20127L748

From kanterella
Revision as of 19:29, 9 July 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Insp Rept 50-213/85-09 on 850408-12 & Notice of Violation
ML20127L748
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 06/24/1985
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Opeka J
CONNECTICUT YANKEE ATOMIC POWER CO.
Shared Package
ML20127L752 List:
References
NUDOCS 8506280117
Download: ML20127L748 (2)


See also: IR 05000213/1985009

Text

r. >

.

'

v.

JUN 2 41985

Docket No. 50-213

Connecticut Yankee Atomic Power Company

ATTN: Mr. J. F. - Opeka

Senior Vice President - Nuclear

Engineering and Operations Group

P.O. Box 270

Hartford, Connecticut 06101

Gentlemen:

Subject: Inspection No. 50-213/85-09

A special announced inspection was conducted April 8-12, 1985, of the

Haddam Neck Plant radioactive materials transportation program. Areas

reviewed included organization, personnel selection, qualification and

training, shipments of radioactive material, quality assurance program,

procedures, procurement and selection of packages, and preparation of

packages for shipment.

The inspection indicated that one of your activities was in apparent

violation of NRC requirements. Details are provided in enclosed Appen-

dix A. You are required to respond to these findings by following the

'

instructions included in Appendix A.

This inspection focused on the effectiveness of your packaging and

shipping operations, and management controls. Certain of the inspection

findings have been characterized as program weaknesses and are document-

ed in Appendix B to this letter. You are requested to respond to

Appendix B within . thirty (30) days of the receipt of this letter,

stating actions taken, or planned, to improve the areas identified as

weaknesses.

>

Your cooperation with us is appreciated.

Sincerely,

Original Signed By *

8506200117 850624 3

[A 050gjt Thomas T. Martin, Director

Division of Radiation Safety

and Safeguards

Enclosures:

1. Appendix A

2. Appendix B

3. Inspection Report No. 50-213/85-09

0FFICIAL RECORD COPY 3

q

,

.

.

Connecticut Yankee Atomic Power Company 2

cc w/ encl:

R. Graves, Plant Superintendent

D. O. Nordquist, Manager of Quality Assurance

R. T. Laudenat, Manager, Generation Facilities Licensing

E. J. Mroczka, Vice President, Nuclear Operations

Gerald Garfield, Esquire

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of Connecticut

bcc w/ encl:

Region I Docket Room (with concurrences)

Senior Operations Officer (w/o encl)

Section Chief, DRP

RI:DRSS RI:D RI:DR M

\M

RI:DRSS \ I: RSS

Clemo fh Bi Shandaky Bellamy tin

6/j0E85 6/dV85 6//j785 6 /

f 6d(/85

OFFICIAL RECORD COPY IR HADDAM NECK 85-09 - 0002.0.0

06/04/85