ML20138K175

From kanterella
Revision as of 15:50, 29 June 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Safety Insp Rept 50-354/85-51 on 851021-25 & Notice of Violation.Reason for Incorrect Wiring Terminations & Potential Application to Other Wiring Should Be Established & Conclusions Reported on Expedited Basis
ML20138K175
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 12/13/1985
From: Ebneter S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Martin T
Public Service Enterprise Group
Shared Package
ML20138K178 List:
References
NUDOCS 8512180306
Download: ML20138K175 (2)


See also: IR 05000354/1985051

Text

.

.

1

DEC 131985

_

Docket No. 50-354

Public Service Electric & Gas Company

ATTN: Mr. T. J. Martin

Vice President

Engineering and Construction

80 Park Plaza - 17C

Newark, New Jersey 07101

Gentlemen:

Subject: Inspection Report No. 50-354/85-51

.

'

This refers to the routine safety inspection conducted by L. S. Cheung of this

office on October 21-25, 1985, at Hope Creek Generating Station, Hancocks Bridge,

New Jersey, of activities authorized by NRC License No. CPPR-120 and to the

discussions of our findings held by Mr. L. S. Cheung with Mr. A. Giardino of

your staff at the conclusion of the inspection, and to subsequent telephone

discussions between Mr. A. Giardino and Mr. L. S. Cheung on November 26, 1985,

and between Mr. A. Giardino and Mr. C. Anderson on December 12,-1985.

Areas examined during this inspection are described in the NRC Region I

Inspection Report which is enclosed with this letter. Within these areas, the

inspection consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspector.

Based on the results of this inspection, it appears that two of your activities

were not conducted in full compliance with NRC requirements, as set forth in the

Notice of Violation, enclosed herewith as Appendix A. These violations have been

categorized by severity level in accordance with the revised NRC Enforcement

Policy (10 CFR 2, Appendix C) published in the Federal Register Notice (49 FR 8583)

dated March 8, 1984. You are required to respond to this letter and in preparing

your response, you should follow the instructions in Appendix A. With regard to

'

the violation relating to the incorrect wiring discussed in section 4.0 of this

report, you should establish the reason for the incorrect terminations and poten-

tial application to other wiring and report your conclusions to this office on

an expedited basis.

The responses directed by this letter and the accompanying Notice are not subject

to the clearance procedures of the Office of Management and Budget as required

by the Paperwork Reduction Act of 1980, PL 96-511.

Your cooperation with us in this matter is appreciated.

Sincerely, l

8512180306 851213 Original Signed By: )

PDR ADOCK 05000354

0 i

PDR

Stewart D. Ebne r, Director 1

Division of Reactor Safety  !

OFFICIAL RECORD COPY IR HC 85-51 - 0001.0.0 l

l 12/13/85 j

-.

/ho[)

>,i

e

.

,

Public Service Electric & Gas Co. -2-

Enclosures:

1. Appendix A, Notice of Violation

2. NRC Region I Inspection Report Number 50-354/85-51

cc w/ enc 1:

A. 'E. Giardino, Manager, Quality Assurance Engineering and Construction

R. L. Mitt 1, General Manager, Nuclear Assurance and Regulation

. A. J. Pietrofitta, General Manager, Power Production Engineering,

Atlantic Electric

Rebecca A. Green, Bureau of Radiation Protection

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of New Jersey

bec w/ enc 1:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o enc 1)

'J. Grant, DRP

J. Strosnider, DRP

l

RI:DRS RI:DRS [F

Cheung/k1 Anderson Durr

12/ /85 12/ /* /85 12/ rl-/85

c f p g c. C[9

0FFICIAL RECORD COPY IR HC 85-51 - 0002.0.0

11/14/85

u