05000354/LER-1999-006, Forwards LER 99-006-00 Re Esfa B Channel Primary Containment Isolation Signal Actuation.Attachment a Lists Commitments Util Making to NRC Re LER

From kanterella
Jump to navigation Jump to search
Forwards LER 99-006-00 Re Esfa B Channel Primary Containment Isolation Signal Actuation.Attachment a Lists Commitments Util Making to NRC Re LER
ML20196A513
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 06/15/1999
From: Bezilla M
Public Service Enterprise Group
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20196A518 List:
References
LR-N99284, NUDOCS 9906220240
Download: ML20196A513 (2)


LER-2099-006, Forwards LER 99-006-00 Re Esfa B Channel Primary Containment Isolation Signal Actuation.Attachment a Lists Commitments Util Making to NRC Re LER
Event date:
Report date:
3542099006R00 - NRC Website

text

'

'O PSIRG

, Public Service Electric and Gas Company P.O. Box 236 Hancocks Bridge, New Jersey 08038-0236 Nuclear Business Unit 3W1151999 LR-N99284 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 HOPE CREEK GENERATING STATION DOCKET NO. 50-354 '

UNIT NO.1 LICENSEE EVENT REPORT NO. 99-006-00

Dear Sir:

This Licensee Event Report entitled, " Engineered Safety Function Actuation "B" Channel Primary Containment isolation Signal Actuation,"is being submitted pursuant to the requirements of 10CFR50.73(a)(2)(iv).

l Sincerely, '

i Mark Bezilla e General Manager-Hope Creek Operations Attachment JPP C Distribution LER File

/ 'y/

u8 'A 9906220240 990615 PDR ADOCK 05000354 S PDR Ele}XutrisinitAirImh 35-2168 REV &94

[ l

'. Do, cum:nt Control D sk M151999 LR-N99284 Attachment A The following item represents the commitment that PSE&G is making to the NRC relative to LER 354/99-006-00:

l 1

1. To preclude additional unexpected ESF actuations, additional training will be provided to Operations personnel concerning the Radiation Monitoring System power supply replacement evolutions. Specifically, the additional training will focus on the relationship between the Radiation Monitoring System signals and PCIS )

actuations, and will be completed by August 15,1999.

2. The tagging system database will be modified to provide precautions concerning L expected equipment actuations by July 15,1999.